ML12262A476
ML12262A476 | |
Person / Time | |
---|---|
Site: | Peach Bottom, Three Mile Island |
Issue date: | 02/22/2012 |
From: | Portzline S Exelon Generation Co |
To: | Office of Nuclear Security and Incident Response |
Shannon King | |
Shared Package | |
ML12062A076 | List: |
References | |
Download: ML12262A476 (6) | |
Similar Documents at Peach Bottom, Three Mile Island | |
---|---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML24302A2422024-10-29029 October 2024
[Table view]ECCS Compensated Level System Replacement Project Pre-Submittal Meeting Slides ML24200A2312024-07-22022 July 2024 Constellations Pre-Submittal Meeting Presentation About Peach Bottom ECCS Compensated Level System Replacement Project - July 22, 2024 ML24137A1882024-05-16016 May 2024 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML24121A1862024-05-14014 May 2024 Attachment 3: Peach Bottom ECCS Compensated Level System Replacement Project Presentation Material (Non-Proprietary Information) ML24131A1282024-05-14014 May 2024 Lessons Learned for ECCS Digital I&C License Amendment ML24134A2032024-05-14014 May 2024 Lessons Learned for ECCS Digital I&C License Amendment - Rev 0 ML24100A7672024-04-11011 April 2024 Meeting Slides - Preapplication with Constellation on Planned Fleet Alternative Request to Adopt OMN-2 ML24089A2612024-04-0909 April 2024 Slides - Constellation - Pre-Application Regarding Hooded Masks 4/9/2024 Meeting Slides (L-2024-LLM-0041) ML24040A0722024-02-13013 February 2024 – Energy Solution Feb 13 Pubic Meeting Slides on TMI-2 Decommissioning ML24029A1742024-01-30030 January 2024 Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion ML23317A0712023-11-14014 November 2023 NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides) ML23255A1042023-08-11011 August 2023 Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting Handout ML23170A0082023-06-29029 June 2023 Decommissioning Presentation for NRC Pre-submittal Meeting, June 29, 2023 ML23157A0352023-06-0606 June 2023 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML23094A1492023-04-11011 April 2023 Licensee Presentation on Whr Exemption Request for Public Meeting on April 11, 2023 ML23076A0442023-03-16016 March 2023 Pb U2 Scram Barrier Presentation KT Session ML21314A4472021-11-10010 November 2021 Slides for Presubmittial Meeting for Proposed Alternative to Adopt ASME Code Case N-921 to Extend the Inservice Inspection Interval ML21165A1942021-06-16016 June 2021 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation ML21165A2882021-06-16016 June 2021 Joint Annual Assessment for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation (Updated) ML21095A0162021-04-0505 April 2021 2021 RIC Session T12 - DOE-Sponsored Light Water Reactor Sustainability Program ML20261G7322020-09-16016 September 2020 Pre-Submittal Slides Extend 120-month Isi/Ist Interval Under 50.55a ML20178A4202020-06-30030 June 2020 NEI Slides for June 30, 2020, Public Meeting on COVID-19 Response ML20175A8722020-06-23023 June 2020 Risk-Informed Inservice Inspection - U.S Nuclear Regulatory Commission (NRC) - Four Element Risk-Informed Approach ML20170B0212020-06-23023 June 2020 NRC Pre-Submittal Meeting Byron Unit 2 One-Time Deferral of Reactor Pressure Vessel Head Penetration Nozzle (Rpvhpn) Inspections ML20163A6552020-06-16016 June 2020 6-16-20 Byron Unit 2 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections ML20169A5592020-06-16016 June 2020 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections (Rev 1) ML20168A3192020-06-15015 June 2020 Joint Annual Assessment Meeting for Pa/Md Power Plants - Webinar Presentation ML19318F9512019-11-20020 November 2019 Presentation Slides for November 20, 2019, Pre-Application Meeting - Request for Revision to Quality Assurance Program Internal Audit Frequency ML19317C9952019-11-12012 November 2019 In-Service Testing Supplemental Position Indication Relief Request NRC Pre-Application Meeting November 18, 2019 ML19308B9262019-11-0505 November 2019 ACRS Plant License Renewal Subcommittee - Peach Bottom Atomic Power Station Units 2 and 3 Subsequent License Renewal Safety Evaluation Report (SER) with Confirmatory Item ML19256E3852019-09-12012 September 2019 SLR Dseis Public Meeting Sept 12 2019 - Scott Portzline - Former Three Mile Island Alert Presentation ML19256E3522019-09-12012 September 2019 Slides - Peach Bottom SLRA Dseis Public Meeting - Sep 12 2019 ML19157A0542019-06-0606 June 2019 Joint Annual Assessment Meeting (Webinar) for Pennsylvania Power Plants - NRC Presentation Slides ML19161A2572019-06-0404 June 2019 BWR Fleet Msv/Srv - Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 ML19151A6602019-05-31031 May 2019 BWR Fleet Mssv/Srv Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 ML19084A0982019-03-22022 March 2019 Potential Topics for Pre-Application Meetings for Peach Bottom SLRA ML19022A2002019-01-23023 January 2019 Request for Use of ASME Code Case N-879 for Exelon Nuclear Power Plants ML18347B3142018-12-19019 December 2018 Bwrvip/Asme Relief Request Discussion December 19, 2018 ML18334A2162018-11-30030 November 2018 Presentation Slides: Exelon BWR MSIV (Boiling-Water Reactor - Main Steam Isolation Valve) Leakage Optimization for NRC Pre-Submittal Meeting of December 6, 2018 ML18319A1272018-11-19019 November 2018 Slides for 11/19/18 Public Meeting - Exelon Fleet LAR for Common Language for TS 5.7 High Radiation Areas ML18144A6932018-05-31031 May 2018 License Amendment Request for Expanded Actions for LEFM Flow Meter Conditions - NRC Pre-Submittal Meeting May 31, 2018 ML18141A3072018-05-21021 May 2018 18 - SLR Status ML18054B3592018-02-27027 February 2018 Slide: NRC Pre-Submittal Meeting for Exelon Fleet LAR to Relocate TS Unit Staff Qualification ANSI Requirements to the QATR, February 27, 2018, Profile Info: Submitted by Frank Mascitelli ML17320A2002017-11-15015 November 2017 Insights from Implementing FLEX in the Peach Bottom Seismic PRA Model ML17257A1612017-09-19019 September 2017 September 19, 2017 Pre-application Public Meeting Presentation on Peach Bottom Subsequent License Renewal Application ML17142A2382017-05-25025 May 2017 OEDO-17-00280 - Briefing Package for Drop-In Visit on June 9, 2017, by Senior Management of Exelon Generation Company, LLC with Chairman Svinicki, Commissioner Baran, and Commissioner Burns ML16077A1562016-03-22022 March 2016 Fleet: Pre-application Teleconference with Exelon to Discuss a Potential License Amendment Request Regarding Operating Training Standards ML16075A3292016-03-16016 March 2016 OEDO-16-00165 - Briefing Package for Drop-In Visit on March 23, 2016, by Senior Management of Exelon Generation Company, LLC with the NRC Executive Director for Operations ML15327A0812015-11-0909 November 2015 Fall 2015 Outage Call Regarding the Steam Generator Tube Inservice Inspections - Slides ML15238B6272015-08-26026 August 2015 Case Study Overview 2024-07-22 Category:Slides and Viewgraphs MONTHYEARML24310A0672024-11-0505 November 2024
[Table view]Constellation NRC Pre-Submittal Meeting Slides - Proposed Alternative for Reactor Vessel Closure Stud Exam Optimization ML24302A2422024-10-29029 October 2024 ECCS Compensated Level System Replacement Project Pre-Submittal Meeting Slides ML24296B2132024-10-22022 October 2024 Slides for October 25, 2024, Meeting on Crane Clean Energy Center Regulatory Path to Restoring the Operating Reactor License Basis ML24200A2312024-07-22022 July 2024 Constellations Pre-Submittal Meeting Presentation About Peach Bottom ECCS Compensated Level System Replacement Project - July 22, 2024 ML24137A1882024-05-16016 May 2024 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML24121A1862024-05-14014 May 2024 Attachment 3: Peach Bottom ECCS Compensated Level System Replacement Project Presentation Material (Non-Proprietary Information) ML24131A1282024-05-14014 May 2024 Lessons Learned for ECCS Digital I&C License Amendment ML24134A2032024-05-14014 May 2024 Lessons Learned for ECCS Digital I&C License Amendment - Rev 0 ML24100A7672024-04-11011 April 2024 Meeting Slides - Preapplication with Constellation on Planned Fleet Alternative Request to Adopt OMN-2 ML24089A2612024-04-0909 April 2024 Slides - Constellation - Pre-Application Regarding Hooded Masks 4/9/2024 Meeting Slides (L-2024-LLM-0041) ML24040A0722024-02-13013 February 2024 – Energy Solution Feb 13 Pubic Meeting Slides on TMI-2 Decommissioning ML24029A1742024-01-30030 January 2024 Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion ML23317A0712023-11-14014 November 2023 NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides) ML23251A0782023-09-0606 September 2023 DRE1 Decom Pre-Submittal Slides ML23255A1042023-08-11011 August 2023 Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting Handout ML23170A0082023-06-29029 June 2023 Decommissioning Presentation for NRC Pre-submittal Meeting, June 29, 2023 ML23157A0352023-06-0606 June 2023 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML23094A1492023-04-11011 April 2023 Licensee Presentation on Whr Exemption Request for Public Meeting on April 11, 2023 ML23076A0442023-03-16016 March 2023 Pb U2 Scram Barrier Presentation KT Session NEI 99-01, Slides - Constellation - Pre-Application EP 2/23/2023 Meeting Slides2023-02-21021 February 2023 Slides - Constellation - Pre-Application EP 2/23/2023 Meeting Slides ML22301A1402022-10-28028 October 2022 1993 TMI Event - Jure Kutlesa, Security Specialist ML21314A4472021-11-10010 November 2021 Slides for Presubmittial Meeting for Proposed Alternative to Adopt ASME Code Case N-921 to Extend the Inservice Inspection Interval ML21165A1942021-06-16016 June 2021 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation ML21165A2882021-06-16016 June 2021 Joint Annual Assessment for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation (Updated) ML21162A3322021-06-11011 June 2021 BWR Fleet Relief Request Associated with RPV Instrument Nozzle Repairs ML20261G7322020-09-16016 September 2020 Pre-Submittal Slides Extend 120-month Isi/Ist Interval Under 50.55a ML20178A4202020-06-30030 June 2020 NEI Slides for June 30, 2020, Public Meeting on COVID-19 Response ML20175A8722020-06-23023 June 2020 Risk-Informed Inservice Inspection - U.S Nuclear Regulatory Commission (NRC) - Four Element Risk-Informed Approach ML20170B0212020-06-23023 June 2020 NRC Pre-Submittal Meeting Byron Unit 2 One-Time Deferral of Reactor Pressure Vessel Head Penetration Nozzle (Rpvhpn) Inspections ML20163A6542020-06-18018 June 2020 2020 NRC Annual Assessment Webinar Presentation - Pennsylvania and Maryland Facilities (Beaver Valley, Calvert Cliffs, Limerick, Peach Bottom, Susquehanna) ML20163A6552020-06-16016 June 2020 6-16-20 Byron Unit 2 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections ML20169A5592020-06-16016 June 2020 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections (Rev 1) ML20168A3192020-06-15015 June 2020 Joint Annual Assessment Meeting for Pa/Md Power Plants - Webinar Presentation ML20050H0232020-02-20020 February 2020 Presentation Slides for Meeting to Discuss Environmental Regulatory Approach to TMI-2 Decommissioning ML19308B9262019-11-0505 November 2019 ACRS Plant License Renewal Subcommittee - Peach Bottom Atomic Power Station Units 2 and 3 Subsequent License Renewal Safety Evaluation Report (SER) with Confirmatory Item ML19256E3522019-09-12012 September 2019 Slides - Peach Bottom SLRA Dseis Public Meeting - Sep 12 2019 ML19256E3852019-09-12012 September 2019 SLR Dseis Public Meeting Sept 12 2019 - Scott Portzline - Former Three Mile Island Alert Presentation ML19157A0542019-06-0606 June 2019 Joint Annual Assessment Meeting (Webinar) for Pennsylvania Power Plants - NRC Presentation Slides ML18347B3142018-12-19019 December 2018 Bwrvip/Asme Relief Request Discussion December 19, 2018 ML18334A2162018-11-30030 November 2018 Presentation Slides: Exelon BWR MSIV (Boiling-Water Reactor - Main Steam Isolation Valve) Leakage Optimization for NRC Pre-Submittal Meeting of December 6, 2018 ML18319A1272018-11-19019 November 2018 Slides for 11/19/18 Public Meeting - Exelon Fleet LAR for Common Language for TS 5.7 High Radiation Areas ML18275A3712018-09-25025 September 2018 Subsequent License Renewal Environmental Scoping Meeting 9-25-18 ML18141A3072018-05-21021 May 2018 18 - SLR Status ML18054B3592018-02-27027 February 2018 Slide: NRC Pre-Submittal Meeting for Exelon Fleet LAR to Relocate TS Unit Staff Qualification ANSI Requirements to the QATR, February 27, 2018, Profile Info: Submitted by Frank Mascitelli ML18017A1172018-01-18018 January 2018 NRC PBAPS SLRA Pre-Submittal Meeting Jan 2018 PM Copy ML17320A2002017-11-15015 November 2017 Insights from Implementing FLEX in the Peach Bottom Seismic PRA Model ML17257A1612017-09-19019 September 2017 September 19, 2017 Pre-application Public Meeting Presentation on Peach Bottom Subsequent License Renewal Application ML16106A2792016-04-15015 April 2016 Meeting Slides for License Amendment Request for Measurement Uncertainty Recapture Uprate NRC Pre-Submittal Meeting April 26, 2016 ML16077A1562016-03-22022 March 2016 Fleet: Pre-application Teleconference with Exelon to Discuss a Potential License Amendment Request Regarding Operating Training Standards ML16070A1152016-03-11011 March 2016 Efforts to Improve Rulemaking Tracking and Reporting 2024-07-22 |
Text
Failures of the SOARCA Draft Report Peach Bottom, Delta PA 2/22/2012
Scott D. Portzline Three Mile Island Alert Security Consultant ADAMS ML12062A076 or www.efmr.org/files/2012/SOARCA 22-2012.pdf (Original high quality file )
Summary 1.The SOARCA conclusions as represented by the NRC Office of Public Relations are misleading.
2.The NRC has not clearly emphasized that SOARCA limited its simulations to a select group of scenarios.
3.SOARCA does not include many aspects of nuclear accidents which would severely alter the outcomes and conclusions.
Summary 4.The MELCOR software has numerous shortcomings and SOARCA should caution its readers that divergent results can easily be created.
5.The NRC has not attempted to correct these misconceptions in the media.
6.The NRC has a history of questionable or faulty probabilistic risk assessments.
7.There has never been a timely evacuation order at any of the world's nuclear accidents.
No Timely Evacuations There has never been a timely evacuation or a timely evacuation order issued at any of the world's nuclear accidents.
100% failure rate.
The evacuation projections are purely wishful thinking-ignores known scientific data of real world nuclear evacuations.
Therefore: SOARCA is not based on reality.
Three Mile Island
- Windscale
- Fukushima Real-World None of these real
-world nuclear accidents, prior to its occurrence, would have been predicted, or simulated by the MELCOR software utilized by SOARCA. Three Mile Island
- Windscale
- Fukushima
Plume Projections Many Emergency Operations Centers employ plume projection software programs which cannot calculate for multiple source term accidents.