Category:Acceptance Review Letter
MONTHYEARML24026A2802024-01-25025 January 2024 Acceptance Review for Virgil C. Summer Relief Requests RR-5-V1, RR-5-V2, and RR-5-V3 (EPIDs L-2023-LLR-0067, L-2023-LLR-0068, and L-2023-LLR-0069) (Email) ML15062A4642015-03-12012 March 2015 Acceptance Review ML15044A0882015-02-24024 February 2015 Acceptance Review Concerning Alternative Request ML15007A4002015-01-21021 January 2015 Acceptance Review Regarding Amendment Request for Approval of Revision to the Radiation Emergency Plan ML14322A2602014-12-0101 December 2014 Acceptance Review Concerning Amendment Request for Approval of Revision to the Radiation Emergency Plan ML14248A4322014-09-18018 September 2014 Acceptance Review ML14126A1882014-05-14014 May 2014 Acceptance Review Concerning Amendment Request to Revise Emergency Action Levels to a Scheme Based on NEI 99-01, Revision 6 (TAC No. MF3927)(RC-14-0032) ML14107A3612014-04-23023 April 2014 Acceptance Review Concerning Amendment Request for Approval of Revision to the Radiation Emergency Plan (TAC No. MF3830)(RC-14-0039) ML14079A6142014-03-24024 March 2014 Acceptance Review Concerning Alternative Request RR-4-05 Alternative Weld Repair for Reactor Vessel Upper Head Penetrations R-4-04 ML13177A0782013-07-0808 July 2013 Acceptance Review Concerning Relief from Limited Pressurizer Surge Nozzle-to-Vessel Examination (TAC No. MF1848)(RC-13-0068) ML13123A1302013-05-13013 May 2013 Acceptance Review Concerning Changes to Snubber Surveillance Requirements (TAC No. MF1385) (RC-13-0037) ML13112A1852013-04-29029 April 2013 Acceptance Review Concerning Changes to Snubber Surveillance Requirements (TAC MF1383) (RC-12-0048) ML11096A0692011-04-0606 April 2011 Email Acceptance Review for March 18 Application 2024-01-25
[Table view] Category:Code Relief or Alternative
MONTHYEARML24250A0782024-10-22022 October 2024 Relief Request RR-5-V1 Regarding Service Water Return Header Check Valves ML24255A3152024-10-22022 October 2024 Relief Request RR-5-V2 Regarding Pressure Isolation Valves ML24256A2322024-10-22022 October 2024 Relief Request RR-5-P1 Charging/Safety Injection Pumps ML24026A2802024-01-25025 January 2024 Acceptance Review for Virgil C. Summer Relief Requests RR-5-V1, RR-5-V2, and RR-5-V3 (EPIDs L-2023-LLR-0067, L-2023-LLR-0068, and L-2023-LLR-0069) (Email) ML23244A2352023-09-18018 September 2023 – Request to Use a Subsequent Edition of the ASME Code, Section XI ML23062A7292023-03-31031 March 2023 Deferral of Pressurizer and Steam Generator Weld Examinations ML20248H3782020-12-0202 December 2020 Alternative Requests RR 4-19 and RR-4-21 Related to the In-Service Testing Program (Epids L-2020-LLR-0077 and L-2020-LLR-0078) ML19242E0272019-09-0606 September 2019 Relief Request (RR-4-22) for Use of ASME Code Case N-513-4 ML19140A4732019-06-0404 June 2019 Relief Request (RR-4-23) to Utilize Code Case N-513-4 ML19003A1882019-01-18018 January 2019 Relief Request (RR-4-16) for Use of ASME Code Case N-513-4 and NRC Generic Letter 90-05 ML19091A0582019-01-10010 January 2019 Draft Application Related to April 4, 2019, Pre-Application Public Meeting for Two Proposed Relief Request ML18345A0602018-12-17017 December 2018 Relief Request Regarding Use of a Performance Based Testing Frequency for Pressure Isolation Valves (RR-4-14) ML18296A1112018-11-0808 November 2018 Relief Request (RR-4-15) for Use of ASME Code Case N-513-4 RC-18-0070, (Vcsns), Unit 1 - Relief Request RR-4-14, Use of a Performance Based Testing Frequency for Pressure Isolation Valves as an Alternative to the Requirements of the American Society of Mechanical Engineers Code for ...2018-10-0808 October 2018 (Vcsns), Unit 1 - Relief Request RR-4-14, Use of a Performance Based Testing Frequency for Pressure Isolation Valves as an Alternative to the Requirements of the American Society of Mechanical Engineers Code for ... RC-18-0118, (Vcsns), Unit 1 - Relief Request RR-4-18, Request for a Temporary Non-Code Repair of a Service Water System Flange2018-09-14014 September 2018 (Vcsns), Unit 1 - Relief Request RR-4-18, Request for a Temporary Non-Code Repair of a Service Water System Flange RC-18-0105, (Vcsns), Unit 1 - Relief Request RR-4-17, Request to Utilize Code Case N-513-3 'Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1' for a Service Water ..2018-08-14014 August 2018 (Vcsns), Unit 1 - Relief Request RR-4-17, Request to Utilize Code Case N-513-3 'Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1' for a Service Water .. ML18186A5882018-07-19019 July 2018 Relief Request (RR-4-13) for Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds. ML17031A0152017-02-0909 February 2017 Relief from the Requirements of the ASME Code Regarding Service Water System Piping ML16161A0452016-07-0101 July 2016 Relief from the Requirements of the ASME Code ML16124A8972016-05-0606 May 2016 Relief from the Requirements of the ASME Code ML15176A3152015-08-12012 August 2015 Alternative Request Regarding Snubbers ML15007A1612015-01-0909 January 2015 Alternative Request During the Fourth Ten-Year Inservice Inspection Interval ML14079A6142014-03-24024 March 2014 Acceptance Review Concerning Alternative Request RR-4-05 Alternative Weld Repair for Reactor Vessel Upper Head Penetrations R-4-04 ML13301A7672013-11-0505 November 2013 Relief Request (RR-4-01, RR-4-02, RR-4-03) for Third and Fourth Ten- Year Inservice Inspection Interval (TAC Nos. MF1900, 1901, 1902) ML13177A0782013-07-0808 July 2013 Acceptance Review Concerning Relief from Limited Pressurizer Surge Nozzle-to-Vessel Examination (TAC No. MF1848)(RC-13-0068) ML13101A3332013-04-19019 April 2013 Alternative RR-III-09 Alternative Weld Repair for Reactor Vessel Head Penetration (TAC No. ME9851) (RC-12-0165) RC-12-0179, Relief Request RR-III-09 Request for Information Fatigue Crack Growth and Transients2012-11-16016 November 2012 Relief Request RR-III-09 Request for Information Fatigue Crack Growth and Transients RC-12-0165, Relief Request RR-III-09 Alternative Weld Repair for Reactor Vessel Head Penetration2012-10-30030 October 2012 Relief Request RR-III-09 Alternative Weld Repair for Reactor Vessel Head Penetration ML12289A0502012-10-17017 October 2012 Alternative RR-III-08 for Third 10-Year Inservice Inspection Interval ML0630705402006-11-21021 November 2006 Relief Requests RR-111-03 and RR-111-04, Relief from Certain Examination Qualification Requirements of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code., RC-06-0117, Relief, Request to Use Alternatives to ASME Code Requirements in VCSNS Third Inservice Inspection Interval (RR-III-03, RR-III-04)2006-06-20020 June 2006 Relief, Request to Use Alternatives to ASME Code Requirements in VCSNS Third Inservice Inspection Interval (RR-III-03, RR-III-04) ML0601004482006-01-20020 January 2006 Relief, Second 10-year Inservice Inspection, Requests for Relief RR-II-9, RR-II-10, & RR-II-12 ML0523006162005-09-0606 September 2005 Relief Request, RI-ISI Program ML0512901982005-05-10010 May 2005 Relief, Relief Request No. RR-III-01 Snubber Visual Examination and Functional Testing RC-04-0148, Request to Use Alternatives to ASME Code Requirements in Plant Third Inservice Inspection Interval (RR-111-01, RR-111-02)2004-09-0808 September 2004 Request to Use Alternatives to ASME Code Requirements in Plant Third Inservice Inspection Interval (RR-111-01, RR-111-02) ML0410503842004-04-0707 April 2004 Request to Use Alternative to ASME Code Requirements in VCSNS Third Inservice Inspection Interval ML0404203862004-02-11011 February 2004 2/11/04, Virgil C. Summer Nuclear Station, Bwn, Relief Request RR-11-16 Regarding Reduced Ultrasonic Testing, TAC No. MC0108 RC-03-0234, Submittal of Information Requested by NRC for Evaluation of Request to Use Alternatives to ASME Boiler and Pressure Vessel Code, Section XI RR-II-18 (0-C-03-0262)2003-11-13013 November 2003 Submittal of Information Requested by NRC for Evaluation of Request to Use Alternatives to ASME Boiler and Pressure Vessel Code, Section XI RR-II-18 (0-C-03-0262) ML0330101602003-10-23023 October 2003 Response to Request for Additional Information Regarding Request to Use Alternatives to ASME Boiler and Pressure Vessel Code, Section XI, Relief Request RR-II-11,RR-II-12(0-C-02-3202) RC-03-0223, Response to Request for Additional Information Regarding Request to Use Alternatives to ASME Boiler and Pressure Vessel Code, Section XI, Relief Request RR-II-15, RR-II-18 (0-C-03-0262)2003-10-23023 October 2003 Response to Request for Additional Information Regarding Request to Use Alternatives to ASME Boiler and Pressure Vessel Code, Section XI, Relief Request RR-II-15, RR-II-18 (0-C-03-0262) RC-03-0196, Resubmittal of Request to Use Alternatives to ASME Boiler and Pressure Vessel Code, Section XI (C-03-0262), RR-II-15, RR-II-16, RR-II-17, RR-II-192003-09-16016 September 2003 Resubmittal of Request to Use Alternatives to ASME Boiler and Pressure Vessel Code, Section XI (C-03-0262), RR-II-15, RR-II-16, RR-II-17, RR-II-19 RC-03-0191, Withdrawal of Request for Relief (0-C-02-3202) (RR-II-09, RR-II-10, RR-II-11, and RR-II-12) Request to Use Alternatives to ASME Boiler and Pressure Vessel Code, Section XI2003-09-11011 September 2003 Withdrawal of Request for Relief (0-C-02-3202) (RR-II-09, RR-II-10, RR-II-11, and RR-II-12) Request to Use Alternatives to ASME Boiler and Pressure Vessel Code, Section XI RC-03-0142, Request for Use Alternatives to ASME Boiler & Pressure Vessel Code, Section XI, RR-II-15, RR-11-15, RR-II-17, RR-II-18, RR-II-19, RR-II-20 and RR-II-212003-07-11011 July 2003 Request for Use Alternatives to ASME Boiler & Pressure Vessel Code, Section XI, RR-II-15, RR-11-15, RR-II-17, RR-II-18, RR-II-19, RR-II-20 and RR-II-21 ML0317402382003-06-13013 June 2003 Response to Request for Additional Information Regarding Request to Use Alternatives to ASME Boiler and Pressure Vessel Code, Section XI, Relief Request RR-II-13 (0-C-03-0883) 2024-10-22
[Table view] Category:Letter
MONTHYEARML24278A2832024-11-0707 November 2024 Letter to E. Carr Environmental Impact Statement Scoping Summary Report for Virgil C. Summer Nuclear Station Unit 1 IR 05000395/20240032024-11-0606 November 2024 – Integrated Inspection Report 05000395/2024003 ML24305A1302024-10-31031 October 2024 Submittal of 30 Day Report Per 10 CFR 26.719(c) Blind Performance Testing ML24308A0052024-10-28028 October 2024 10-28-24 NRC V.C. Summer Nuclear Station SLR Cherokee Nation Letter to USNRC ML24308A0062024-10-25025 October 2024 Subsequent License Renewal Application Area of Potential Effect (Ape) Clarification Fairfield County, South Carolina SHPO Project No. 22-EJ0147 ML24302A1442024-10-24024 October 2024 Update to Subsequent License Renewal Application (SLRA) Supplement 4 and Requested Information Formation in Response to Limited Aging Management Audit ML24256A2322024-10-22022 October 2024 Relief Request RR-5-P1 Charging/Safety Injection Pumps ML24255A3152024-10-22022 October 2024 Relief Request RR-5-V2 Regarding Pressure Isolation Valves ML24250A0782024-10-22022 October 2024 Relief Request RR-5-V1 Regarding Service Water Return Header Check Valves 05000395/LER-2024-002, Loss of Control Room Emergency Filtration System2024-10-15015 October 2024 Loss of Control Room Emergency Filtration System ML24290A1052024-10-0707 October 2024 Core Operating Limits Report VCSNS Unit 1 Cycle 29, Revision 0 IR 05000395/20244042024-09-26026 September 2024 Cyber Security Inspection Report 05000395-2024404 - Public ML24274A1942024-09-26026 September 2024 (Vcsns), Unit 1 Subsequent License Renewal Application (SLRA) First 10 CFR 54.21(b) Annual Amendment ML24221A2112024-09-23023 September 2024 Clarification Regarding Area of Potential Effect for the Subsequent Operating License Renewal for Virgil C. Summer Nuclear Station Fairfield County, South Carolina (SHPO Project Number: 22-EJ0147) (Docket Number: 50-395) ML24267A0552024-09-23023 September 2024 Clarification Regarding Area of Potential Effect for the Subsequent Operating License Renewal for Virgil C. Summer Nuclear Station Fairfield County, South Carolina (SHPO Project Number: 22-EJ0147) (Docket Number: 50-395) ML24267A0642024-09-23023 September 2024 Clarification Regarding Area of Potential Effect for the Subsequent Operating License Renewal for Virgil C. Summer Nuclear Station Fairfield County, South Carolina (SHPO Project Number: 22-EJ0147) (Docket Number: 50-395) ML24267A0592024-09-23023 September 2024 Clarification Regarding Area of Potential Effect for the Subsequent Operating License Renewal for Virgil C. Summer Nuclear Station Fairfield County, South Carolina (SHPO Project Number: 22-EJ0147) (Docket Number: 50-395) ML24267A0542024-09-23023 September 2024 Clarification Regarding Area of Potential Effect for the Subsequent Operating License Renewal for Virgil C. Summer Nuclear Station Fairfield County, South Carolina (SHPO Project Number: 22-EJ0147) (Docket Number: 50-395) IR 05000395/20244022024-09-10010 September 2024 Security Baseline Inspection Report 05000395/2024402 IR 05000395/20240052024-08-22022 August 2024 Updated Inspection Plan for Virgil C. Summer Nuclear Station - Report 05000395/2024005 ML24190A4012024-08-19019 August 2024 Request for Withholding Information from Public Disclosure Regarding the Subsequent License Renewal Application - Dominion Energy Letter Dated May 30, 2024 IR 05000395/20240022024-08-12012 August 2024 Integrated Inspection Report 05000395/2024002 ML24180A0062024-08-0505 August 2024 Issuance of Amendment No. 227 to Modify Technical Specification 3.8.3.1 to Increase Completion Time for 120-Volt A.C. Vital Busses ML24218A3002024-08-0101 August 2024 Environmental Review Response to NRC Requests for Additional Information and Response to NRC Requests for Confirmation of Information Set 1 ML24158A3882024-07-31031 July 2024 Issuance of Amendment No. 226 to Change Emergency Plan Staff Augmentation Times and Relocate Emergency Operations Facility ML24162A3292024-07-0505 July 2024 Letter to E Carr - V.C. Summer Unit 1 - Summary of the May 2024 Audit Regarding the Environmental Review of the Subsequent License Renewal Application ML24177A1382024-06-25025 June 2024 Aging Management Audit Report- VC Summer, Unit 1 - Subsequent License Renewal Application ML24178A1192024-06-25025 June 2024 Update to License Amendment Request- Inverter Allowed Outage Time (AOT) Extension ML24185A1902024-06-25025 June 2024 Submittal of Updated Final Safety Analysis Report, Revision 24 ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24171A0152024-06-17017 June 2024 Update to Subsequent License Renewal Application (SLRA) Response to NRC Request for Additional Information Set 2 Safety Review ML24157A3352024-06-0606 June 2024 – Notification of an NRC Cybersecurity Baseline Inspection (NRC Inspection Report 05000395-2024404 and Request for Information ML24155A2042024-05-31031 May 2024 Proposed Alternative Request RR-24-123, Containment Unbonded Post-Tensioning System Inservice Inspection Requirements ML24155A1462024-05-30030 May 2024 Update to Subsequent License Renewal Application (SLRA) -Response to NRC Request for Additional Information Set 1 Response to NRC Request for Confirmation of Information Set 1 and Supplement 3 ML24143A1792024-05-22022 May 2024 Special Report 2024-001-01 for Virgil C. Summer Nuclear Station (Vcsns), Unit 1, Waste Gas System Inoperability ML24141A2822024-05-20020 May 2024 (Vcsns), Unit 1 - License Amendment Request - Emergency Response Organization (ERO) Augmentation Time Change, Emergency Operations Facility Relocation and Other Emergency Plan Changes IR 05000395/20240012024-05-10010 May 2024 Integrated Inspection Report 05000395/2024001 ML24129A2002024-05-0606 May 2024 Update to Subsequent License Renewal Application, Supplement 2 IR 05000395/20240402024-05-0101 May 2024 95001 Supplemental Inspection Report 05000395/2024040 and Follow-Up Assessment Letter ML24121A1002024-04-29029 April 2024 Response to Request for Additional Information Regarding Alternative Request RR-5-V2 ML24120A2072024-04-29029 April 2024 Submittal of Annual Radiological Environmental Operating Report ML24116A2052024-04-23023 April 2024 Annual Radioactive Effluent Release Report ML24109A1792024-04-19019 April 2024 Aging Management Audit Plan Regarding the Subsequent License Renewal Application Review ML24108A0392024-04-18018 April 2024 Letter to E Carr-V.C. Summer Unit 1- Regulatory Audit Regarding the Environmental Review of the Subsequent License Renewal Application ML24108A0672024-04-17017 April 2024 Submittal of Summary for Condition of the Service Water Intake Structure Provided in Accordance with License Condition 2.C.5.d 05000395/LER-2024-001, (Vcsns), Unit 1, Automatic Actuation of B Emergency Diesel Generator2024-04-17017 April 2024 (Vcsns), Unit 1, Automatic Actuation of B Emergency Diesel Generator ML24100A7312024-04-0909 April 2024 Personnel Exposure and Monitoring Annual Report ML24095A2072024-04-0101 April 2024 Update to Subsequent License Renewal Application (SLRA) Supplement 1 ML24087A2182024-03-26026 March 2024 (Vcsns), Unit 1 - License Amendment Request - Emergency Response Organization (ERO) Augmentation Time Change, Emergency Operations Facility Relocation and Other Emergency Plan Changes - Response to Request. 2024-09-26
[Table view] |