Annual Radiological Environmental Operating Report for 2015
ML16138A226
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 05/09/2016
From: Yuen S
Dominion Energy Kewaunee
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML16138A228 List:
References
16-197
Download: ML16138A226 (4)


Text

Dominion Energy Kewaunee, Inc. N490 Hwy 42, Kewaunee, WI 54216 A TIN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 MAY 9 2016-DOMINION ENERGY KEWAUNEE, INC. KEWAUNEE POWER STATION Serial No.16-197 . UC/RR/RO Docket No.: 50-305 License No.: DPR-43 2015 ANNUAL RADIOLOGICAL ENVIRONMENTAL OPERATING REPORT Enclosed is the 2015 Annual Radiological Environmental Operating Report for the Kewaunee Power Station (KPS). This report was prepared by ATI Environmental Inc. and satisfies the requirements of KPS Technical Specification 5.6.1. The results of the 2015 Land Use Census, submitted in accordance with the KPS Radiological Environmental Monitoring Manual, Section 2.2.2/2.3.2, are also included in this report. If you have questions or require additional information, please feel free to contact Mr. Richard Repshas at 920-388-8217.

Sincerely, Stewart J. Yuen

  • Plant Manager, Kewaunee Power Station Commitments made by this letter: NONE cc: Regional Administrator, Region Ill U. S. Nuclear Regulatory Commission 2443 Warrenville Road Suite 210 Lisle, IL 60532-4352 Mr. Ted H. Carter NRC Senior Project Manager U.S. Nuclear Regulatory Commission Two White Flint North, Mail Stop T-8F5 11555 Rockville Pike Rockville, MD 20852-2738 Mr. Bob Busch Wisconsin Department of Health Services Radiation Protection Section 1 West Wilson St. Room B157 P.O. Box 2659 Madison, WI 53701-2659 Ms. Deborah Russo American Nuclear Insurers 95 Glastonbury Blvd. Glastonbury, CT 06033 Serial No.16-197 Page 2 of 2 be with enclosure:

Records Management Records Management be without enclosure:

Licensing File Ms. L. F. Barnett Ms. R. Klearman Mr. B. A. Garber Mr. T. G. Cleary Mr. S. J. Yuen Mr. T. P. Olson Mr. J. D. Helbing Mr. B. J. McMahon Mr. B. G. Presl Mr. C. D. Sly Mr. T. Brunelli Ms. L. M. Cuoco Mr. J. R. Harrell Mr. T. A. Brookmire Mr. J. R. Roth Mr. T. R. Huber Mr. J. M. Hale Mr. B. R. Steckler Mr. D. M. Holschbach CONCURRENCES J. Gadzala J.M. Hale VERIFICATION OF ACCURACY Serial No.16-197 2015 Radiological Environmental Operating Report be: Page 1 of 1 KPS INGW IN/2SE, Corp. Licensing OJRP/20 NAPS, Manager Licensing SPS, Manager Licensing MPS, Licensing KPS, Plant Manager KPS, Technical Support Manager KPS, Manager Maintenance KPS, Manager Nuclear Operations KPS, Manager Nuclear Protection Services IN/2SE, Licensing IN/2NW, Director Nuclear Oversight Tredegar RS-2, Counsel of Record IN/3SW IN/3SW IN/2SE IN/2SE KPS, Manager Radiation Protection and Chemistry KPS, Health Physicist KPS, Chemist t* .-... *'

'*t KPS Correspondence Review and Approval Record ACTION PLAN None CHANGES TO THE USAR, QA TOPICAL REPORT, OR ISFSI FSAR None KPS Correspondence Review & Approval Record

Subject:

2015 Annual Radiological Environmental Operating Report Due to Site PM: 05/05/2016 I Due Date: 05/15/2016 Licensing Contact: RP Repshas I Ext: 8217 Reviewer D Holschhbach Chemistry B Steckler Radiation Protection D Shannon Radiation Protection R Repshas Licensing Signature I Date No Comments Comments D D D D D D D I Rev. No. 0 Comments Resolved D D D D D D D D D D D The subject document requires your review. The venfymg the accuracy and completeness of the correspondence m the reviewer's area of expertise (including consistency with FSAR, P&IDs, procedures).

Each reviewer is expected to assess the entire document for consistency and review the validation package (if applicable) for completeness.

Please review and sign this form and check the appropriate box above. Document any required changes on the document itself and return it to the Licensing contact. It is the responsibility of the technical lead(s) to ensure that the validation package (if applicable) for the subject correspondence is complete and accurate.

Page 1 of 1 5/3/06 S:\KEWAUNEE\4\DATA 1\LICENSING\Admin\Forms\Review

& Approval Record.1 docx.docx Dominion Energy Kewaunee, Inc. N490 Hwy 42, Kewaunee, WI 54216 A TIN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 MAY 9 2016-DOMINION ENERGY KEWAUNEE, INC. KEWAUNEE POWER STATION Serial No.16-197 . UC/RR/RO Docket No.: 50-305 License No.: DPR-43 2015 ANNUAL RADIOLOGICAL ENVIRONMENTAL OPERATING REPORT Enclosed is the 2015 Annual Radiological Environmental Operating Report for the Kewaunee Power Station (KPS). This report was prepared by ATI Environmental Inc. and satisfies the requirements of KPS Technical Specification 5.6.1. The results of the 2015 Land Use Census, submitted in accordance with the KPS Radiological Environmental Monitoring Manual, Section 2.2.2/2.3.2, are also included in this report. If you have questions or require additional information, please feel free to contact Mr. Richard Repshas at 920-388-8217.

Sincerely, Stewart J. Yuen

  • Plant Manager, Kewaunee Power Station Commitments made by this letter: NONE cc: Regional Administrator, Region Ill U. S. Nuclear Regulatory Commission 2443 Warrenville Road Suite 210 Lisle, IL 60532-4352 Mr. Ted H. Carter NRC Senior Project Manager U.S. Nuclear Regulatory Commission Two White Flint North, Mail Stop T-8F5 11555 Rockville Pike Rockville, MD 20852-2738 Mr. Bob Busch Wisconsin Department of Health Services Radiation Protection Section 1 West Wilson St. Room B157 P.O. Box 2659 Madison, WI 53701-2659 Ms. Deborah Russo American Nuclear Insurers 95 Glastonbury Blvd. Glastonbury, CT 06033 Serial No.16-197 Page 2 of 2 be with enclosure:

Records Management Records Management be without enclosure:

Licensing File Ms. L. F. Barnett Ms. R. Klearman Mr. B. A. Garber Mr. T. G. Cleary Mr. S. J. Yuen Mr. T. P. Olson Mr. J. D. Helbing Mr. B. J. McMahon Mr. B. G. Presl Mr. C. D. Sly Mr. T. Brunelli Ms. L. M. Cuoco Mr. J. R. Harrell Mr. T. A. Brookmire Mr. J. R. Roth Mr. T. R. Huber Mr. J. M. Hale Mr. B. R. Steckler Mr. D. M. Holschbach CONCURRENCES J. Gadzala J.M. Hale VERIFICATION OF ACCURACY Serial No.16-197 2015 Radiological Environmental Operating Report be: Page 1 of 1 KPS INGW IN/2SE, Corp. Licensing OJRP/20 NAPS, Manager Licensing SPS, Manager Licensing MPS, Licensing KPS, Plant Manager KPS, Technical Support Manager KPS, Manager Maintenance KPS, Manager Nuclear Operations KPS, Manager Nuclear Protection Services IN/2SE, Licensing IN/2NW, Director Nuclear Oversight Tredegar RS-2, Counsel of Record IN/3SW IN/3SW IN/2SE IN/2SE KPS, Manager Radiation Protection and Chemistry KPS, Health Physicist KPS, Chemist t* .-... *'

'*t KPS Correspondence Review and Approval Record ACTION PLAN None CHANGES TO THE USAR, QA TOPICAL REPORT, OR ISFSI FSAR None KPS Correspondence Review & Approval Record

Subject:

2015 Annual Radiological Environmental Operating Report Due to Site PM: 05/05/2016 I Due Date: 05/15/2016 Licensing Contact: RP Repshas I Ext: 8217 Reviewer D Holschhbach Chemistry B Steckler Radiation Protection D Shannon Radiation Protection R Repshas Licensing Signature I Date No Comments Comments D D D D D D D I Rev. No. 0 Comments Resolved D D D D D D D D D D D The subject document requires your review. The venfymg the accuracy and completeness of the correspondence m the reviewer's area of expertise (including consistency with FSAR, P&IDs, procedures).

Each reviewer is expected to assess the entire document for consistency and review the validation package (if applicable) for completeness.

Please review and sign this form and check the appropriate box above. Document any required changes on the document itself and return it to the Licensing contact. It is the responsibility of the technical lead(s) to ensure that the validation package (if applicable) for the subject correspondence is complete and accurate.

Page 1 of 1 5/3/06 S:\KEWAUNEE\4\DATA 1\LICENSING\Admin\Forms\Review

& Approval Record.1 docx.docx