ML17252A508
ML17252A508 | |
Person / Time | |
---|---|
Site: | Dresden |
Issue date: | 08/06/1974 |
From: | Stephenson B Commonwealth Edison Co |
To: | James Keppler US Atomic Energy Commission (AEC) |
References | |
Download: ML17252A508 (3) | |
Similar Documents at Dresden | |
---|---|
Category:Letter
MONTHYEARML24303A0712024-11-0404 November 2024
[Table view]Letter to K. Meshigaud, Chairperson Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1422024-11-0101 November 2024 Letter to V. Jefferson, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1442024-11-0101 November 2024 Letter to V. Kitcheyna, Chairwoman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0152024-11-0101 November 2024 Letter to C. Harper, Chief Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0492024-11-0101 November 2024 Letter G. Kakkak, Chairwoman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0302024-11-0101 November 2024 Letter to D.G. Lankford, Chief Request to Initiate Section 106 Consultation for SLR of DNP Station RS-24-104, Nuclear Radiological Emergency Plan Document Revision2024-11-0101 November 2024 Nuclear Radiological Emergency Plan Document Revision ML24303A0272024-11-0101 November 2024 Letter to D. Rios, Chairperson Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0512024-11-0101 November 2024 Letter to J. Barrett, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station IR 05000237/20254012024-11-0101 November 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000237/2025401 05000249/2025401 ML24303A0172024-11-0101 November 2024 Letter to B. Peters, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0472024-11-0101 November 2024 Letter to G. Cheatham, Chairwoman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1462024-11-0101 November 2024 Letter to W. Gravelle, Chairperson Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0132024-11-0101 November 2024 Letter to B. Barnes, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1342024-11-0101 November 2024 Letter to T. Carnes, Chairperson Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1172024-11-0101 November 2024 Letter to R. Yob, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24291A0252024-11-0101 November 2024 Letter to R. Blanchard Tribal Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0692024-11-0101 November 2024 Letter to J.A. Crawford, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1352024-11-0101 November 2024 Letter to T. Rhodd, Chairperson Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0642024-11-0101 November 2024 Letter to J. Rupnick, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0432024-11-0101 November 2024 Letter to E. Elizondo, Sr. Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0892024-11-0101 November 2024 Letter to M. J. Wesaw, Chair Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0602024-11-0101 November 2024 Letter to J. R. Shotton, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0992024-11-0101 November 2024 Lett to R. Carter, Principal Chief Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0532024-11-0101 November 2024 Letter to J. Greendeer, President Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1102024-11-0101 November 2024 Letter to R. Gasco, Chairperson Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0202024-11-0101 November 2024 Letter to C. Chavers, Chairwoman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0552024-11-0101 November 2024 Letter to J. Keys, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0242024-11-0101 November 2024 Letter to D. Kaskaske, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24291A0272024-10-31031 October 2024 NRC Letter to C. Mayer Illinois SHPO Request to Initiate Section 106 Consultation for Subsequent License Renewal of Units 2 and 3 ML24291A0202024-10-31031 October 2024 NRC Letter to J. Loichinger Achp Request for Comments Concerning the Environmental Review of DNPS Units 2 and 3 Subsequent License Renewal Application IR 05000237/20240032024-10-29029 October 2024 Integrated Inspection Report 05000237/2024003 and 05000249/2024003 RS-24-103, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2024-10-21021 October 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors RS-24-102, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, and TSTF-5912024-10-21021 October 2024 Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, and TSTF-591 RS-24-080, Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in .2024-10-16016 October 2024 Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in . RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24225A2132024-09-26026 September 2024 Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval ML24253A0942024-09-23023 September 2024 License Renewal Regulatory Audit Regarding the Environmental Review of the License Renewal Application (EPID L-2024-Sle-0002) (Docket Numbers: 50-237 and 50-249) SVPLTR 24-0030, ISFSI Annual Effluent Release Report2024-09-20020 September 2024 ISFSI Annual Effluent Release Report ML24270A0332024-09-20020 September 2024 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report IR 05000237/20244022024-09-19019 September 2024 – Security Baseline Inspection Report 05000237/2024402 and 05000249/2024402 - (Public) ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24260A2152024-09-16016 September 2024 Confirmation of Initial License Examination ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000237/20230052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Dresden Nuclear Power Station, Units 2 and 3 (Report 05000237/2023005; 05000249/2024005) ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000237/20240022024-08-14014 August 2024 Integrated Inspection Report 05000237/2024002 and 05000249/2024002 ML24215A2912024-08-14014 August 2024 Request for Withholding Information from Public Disclosure Alternative Schedule to Complete Decommissioning Beyond 60-Years of Permanent Cessation of Operations 2024-09-06 Category:Note to File incl Telcon Record MONTHYEARML17252B4162017-09-0909 September 2017
[Table view]Letter Confirming a Conversation Concerning the Report of an Empty Spent Fuel Shipping Cask Which Had Some Areas of Removable Surface Contamination ML17252B4142017-09-0909 September 2017 Letter Confirming a Conversation Concerning the Failure of HPCI Valve Mo 2-2301-8 During a Maintenance Outage and the Discovery of a Broken Stem ML0528500652005-10-24024 October 2005 Minutes of Conference Call Regarding Dresden MSSV Setpoint Tolerance (Response to License Condition 4 from July 30, 2004 Amendment) ML0331002702002-08-19019 August 2002 Note to Telephone Conversation - Robert O'Connell - NMSS-2002-A-0002 ML0331002432002-08-0707 August 2002 Note to Telephone Conversation - Robert O'Connell - NMSS-2002-A-0002 ML0331001982002-05-0808 May 2002 Noie to Telephone Conversation - Robert O'Connell - NMSS-2002-A-0002 ML0331001842002-05-0707 May 2002 Note to Telephone Conversation - Robert O'Connell - NMSS-2002-A-0002 ML0331001972002-05-0707 May 2002 Note to Telephone Conversation - Robert O'Connell - NMSS-2002-A-0002 ML0331001732002-04-25025 April 2002 Note to Telephone Conversation - Robert O'Connell - NMSS 2002-A-0002 ML17252B4171976-12-0606 December 1976 Letter Confirming a 12/06/1976 Conversation Concerning the Receipt of an Empty Spent Fuel Shipping Cask Which Had Some Areas of Removeable Surface Contamination ML17252B4181976-12-0303 December 1976 Letter Confirming a Conversation Concerning Information Received That Indicates the R.W.M. Should Remain in Service or a Qualified Person Must Verify All Control Rod Movement Through 20% Power ML17252B4191976-12-0202 December 1976 Letter Confirming a 12/02/1976 Conversation Concerning Receipt of an Empty Spent Fuel Shipping Cask from GE Morris Operation Which Had Some Areas of Removable Surface Contamination ML17252B4571975-11-17017 November 1975 Letter Confirming a Conversation Concerning Quarterly Closure Timing of IC Main Steam Isolation Valve in Which the Closure Time Was Found at 2.7 Seconds ML17252B4581975-11-0404 November 1975 Letter Confirming a Conversation Concerning Discovery of High Level in the Torus While Running a HPCI Surveillance Check ML17252A4461975-07-31031 July 1975 Incident Notification Concerning Location of Broken Tack Welds on Jet Pump Restrainer Clamp Bolt Keepers During Tv Camera Examination of Unit 3 Jet Pumps - Dresden Unit 3 ML17252A9121975-04-25025 April 1975 Letter Confirming a 04/25/1975 Conversation Concerning Excessive Leakage Through Torus to Drywell Vacuum Breaker 3-1601-32B During Refuel Outage Local Leak Testing - Dresden Unit 3 ML17252A9131975-04-23023 April 1975 Letter Confirming a 04/23/1975 Conversation Concerning Failure of Feedwater Check Valves, 3-220-58A and 62A, and 3A Feedwater Line to Pass Local Leak Rate Test During Refuel Outage Surveillance - Dresden Unit 3 ML17252A7871975-03-19019 March 1975 Note to Confirm a Conversation Concerning Routine Main Steamline High Radiation Monitor Surveillance in Which the a and B Monitors Were Found to Have Set Points in Excess of Technical Specification Values - Dresden Unit 3 ML17252A7891975-03-19019 March 1975 Note to Confirm a Conversation Concerning Routine Main Steamline High Radiation Monitor Surveillance in Which the a and B Monitors Were Found to Have Set Points Exceeding the Techspec Value of 3 Times Background - Dresden Unit 3 ML17252A8241975-02-18018 February 1975 Note to Confirm a Conversation Concerning Discovery of a Leaking Containment Inerting Isolation Valve A03-1601-21 During Local Leak Rate Testing - Dresden Unit 3 ML17252A8251975-02-18018 February 1975 Note Confirming a Conversation Concerning Failure of Bergen Patterson Piping Restraint Number 19 on the Unit 3 HPCI Main Steam Line in the Dry-Well - Dresden Unit 3 ML17252B0291975-02-10010 February 1975 Letter Confirming a 02/10/1975 Conversation Concerning a Leak in a 3/4 Inch Vent Line at Weld on 3C Reactor Feed Pump Casing - Dresden Unit 3 ML17252A8231975-02-10010 February 1975 Note to Confirm a Conversation Concerning a Leak in a 3/4 Inch Vent Line at a Well on 3C Reactor Feed Pump Casing - Dresden Unit 3 ML17252A8371975-01-0707 January 1975 Note Confirming a Conversation Concerning a Xenon Transient Experienced on Unit 3 During a Control Rod Pattern Alteration - Dresden Unit 3 ML17252B0281975-01-0606 January 1975 Letter Confirming a 01/06/1975 Conversation Concerning Excess Chloride Content in Reactor Coolant Water During an Extended Reactor Cleanup System Maintenance Outage - Dresden Unit 3 ML17252A8321975-01-0606 January 1975 Note to Confirm a Conversation Concerning Excess Chloride Content in Unit 3 Reactor Coolant Water During a Extended Reactor Cleanup System Maintenance Outage - Dresden Unit 3 ML17252A4841974-12-0606 December 1974 Letter Confirming a 12/02/1974 Conversation Concerning the Discovery of Minor Leaks on the Minimum Flow Lines for 3A and 3B Reactor Feed Pumps - Dresden Unit 3 ML17252A4911974-10-23023 October 1974 Letter Confirming a 08/28/1974 Conversation Concerning a Failure to Maintain the 3A Core Spray Discharge Header in a Filled Condition - Dresden Unit 3 ML17252A4951974-10-0404 October 1974 Letter Confirming a 10/04/1974 Conversation Concerning the Discovery of DPI83-2352 with a Setpoint Greater than the Technical Specification ML17252A4971974-09-30030 September 1974 Letter Confirming a 09/30/1974 Conversation Concerning Discovery of Lits 3-263-72A and the Set Points Exceeding Technical Specifications ML17252A5001974-09-24024 September 1974 Letter Confirming a 09/24/1974 Conversation Concerning a Through Wall Crack Discovered on Torus Purge Inlet Line 3-8506-18 - Dresden Unit 3 ML17252A5011974-09-24024 September 1974 Letter Confirming a 09/21/1974 Conversation Concerning a Minor Leak from Feed Water Pressure Tap 3241-12A - Dresden Unit 3 ML17252A5051974-09-0909 September 1974 Letter Confirming a 09/09/1974 Conversation Concerning Failure of E Tip Valve to Close - Dresden Unit 3 ML17252B0311974-08-28028 August 1974 Letter Confirming a 08/23/1974 Conversation Concerning a Failure to Maintain the 3A Core Spray Discharge Header in a Filled Condition as Required by Technical Specifications - Dresden Unit 3 ML17252A5071974-08-14014 August 1974 Letter Confirming a 08/08/1974 Conversation Concerning a Failure of the Solenoid Operated Isolation Valve Associated with the 3B Traversing Encore Probe to Close - Dresden Unit 3 ML17252A5081974-08-0606 August 1974 Letter Confirming a 07/26/1974 Conversation Concerning Failure of the Seat Material of the Air Operated Primary Containment Isolation Valve A03-1601-22 - Dresden Unit 3 ML17252A5111974-07-29029 July 1974 Letter Confirming a 07/29/1974 Conversation Concerning Failure of the Seat Material of Air Operated Isolation Valve AO-3-1601-21 - Dresden Unit 3 ML17252A5121974-07-29029 July 1974 Letter Confirming a 07/26/1974 Conversation Concerning the Failure of the Seat Material of Air Operated Primary Containment Valve A03-1601-22 - Dresden Unit 3 ML17252A5151974-07-23023 July 1974 Letter Confirming a 07/19/1974 Conversation Concerning the Discovery of HPCI High Steam Flow Isolation Switch DPIS 3-2352 to Be Out of Flex - Dresden Unit 3 ML17252A5161974-07-19019 July 1974 Letter Confirming a 07/19/1974 Conversation Concerning Discovery of HPCI High Steam Flow Isolation Switch DPIS 3-2352 to Be Out of Flex - Dresden Unit 3 ML17252A5171974-07-16016 July 1974 Letter Confirming a 07/16/1974 Conversation Concerning the Failure to Reach the Required Containment Oxygen Concentration of 4 Percent within 24 Hours of Placing Mode Switch in Run Position - Dresden Unit 3 ML17252A5271974-07-0505 July 1974 Letter Confirming a 05/24/1974 Conversation Concerning the Discovery of a Set Point Drift of L.I.T.S. 3-263-72A Beyond the Technical Specification - Dresden Unit 3 ML17252A5261974-06-24024 June 1974 Letter Confirming a 06/24/1974 Conversation Concerning a Failure of the Air Supply to the Feed Water Regulating Valve on 06/23/1974 - Dresden Unit 3 ML17252A5291974-06-24024 June 1974 Letter Confirming a 06/24/1974 Conversation Concerning a Failure of the Air Supply to the Feed Water Regulating Valve on 06/23/1974 - Dresden Unit 3 ML17252A5251974-06-17017 June 1974 Letter Confirming a 06/17/1974 Conversation Concerning the Failure of Main Steam Drain Valve M03-220-2 to Operate Properly on 05/22/1974 - Dresden Unit 3 ML17252A5361974-06-17017 June 1974 Letter Confirming a 06/17/1974 Conversation Concerning a Failure of Main Steam Valve M03-220-2 to Operate on 05/22/1974 - Dresden Unit 3 ML17252A5241974-06-12012 June 1974 Letter Confirming a 06/12/1974 Conversation Concerning the Discovery of 2 Reactor High Pressure Scram Switches (PS-3-263-55A and C) with Set Points Above the Technical Specification Limit - Dresden Unit 3 ML17252A5231974-06-11011 June 1974 Letter Confirming a 06/11/1974 Conversation Concerning a Small Leak in Line 3-3037B - Dresden Unit 3 ML17252A5401974-06-11011 June 1974 Letter Confirming a 06/11/1974 Conversation Concerning a Small Leak in Line 3-3037B - Dresden Unit 3 ML17252B0321974-06-10010 June 1974 Letter Confirming a 06/10/1974 Conversation Concerning a Failure of a Three Quarter Inch Nipple on Reactor Feed Pump Dispatch Line 3-3201-24 - Dresden Unit 3 2017-09-09 Category:Verbal Comm MONTHYEARML17252B4162017-09-0909 September 2017
[Table view]Letter Confirming a Conversation Concerning the Report of an Empty Spent Fuel Shipping Cask Which Had Some Areas of Removable Surface Contamination ML17252B4142017-09-0909 September 2017 Letter Confirming a Conversation Concerning the Failure of HPCI Valve Mo 2-2301-8 During a Maintenance Outage and the Discovery of a Broken Stem ML0528500652005-10-24024 October 2005 Minutes of Conference Call Regarding Dresden MSSV Setpoint Tolerance (Response to License Condition 4 from July 30, 2004 Amendment) ML0331002702002-08-19019 August 2002 Note to Telephone Conversation - Robert O'Connell - NMSS-2002-A-0002 ML0331002432002-08-0707 August 2002 Note to Telephone Conversation - Robert O'Connell - NMSS-2002-A-0002 ML0331001982002-05-0808 May 2002 Noie to Telephone Conversation - Robert O'Connell - NMSS-2002-A-0002 ML0331001842002-05-0707 May 2002 Note to Telephone Conversation - Robert O'Connell - NMSS-2002-A-0002 ML0331001972002-05-0707 May 2002 Note to Telephone Conversation - Robert O'Connell - NMSS-2002-A-0002 ML0331001732002-04-25025 April 2002 Note to Telephone Conversation - Robert O'Connell - NMSS 2002-A-0002 ML17252B4171976-12-0606 December 1976 Letter Confirming a 12/06/1976 Conversation Concerning the Receipt of an Empty Spent Fuel Shipping Cask Which Had Some Areas of Removeable Surface Contamination ML17252B4181976-12-0303 December 1976 Letter Confirming a Conversation Concerning Information Received That Indicates the R.W.M. Should Remain in Service or a Qualified Person Must Verify All Control Rod Movement Through 20% Power ML17252B4191976-12-0202 December 1976 Letter Confirming a 12/02/1976 Conversation Concerning Receipt of an Empty Spent Fuel Shipping Cask from GE Morris Operation Which Had Some Areas of Removable Surface Contamination ML17252B4571975-11-17017 November 1975 Letter Confirming a Conversation Concerning Quarterly Closure Timing of IC Main Steam Isolation Valve in Which the Closure Time Was Found at 2.7 Seconds ML17252B4581975-11-0404 November 1975 Letter Confirming a Conversation Concerning Discovery of High Level in the Torus While Running a HPCI Surveillance Check ML17252A4461975-07-31031 July 1975 Incident Notification Concerning Location of Broken Tack Welds on Jet Pump Restrainer Clamp Bolt Keepers During Tv Camera Examination of Unit 3 Jet Pumps - Dresden Unit 3 ML17252A9121975-04-25025 April 1975 Letter Confirming a 04/25/1975 Conversation Concerning Excessive Leakage Through Torus to Drywell Vacuum Breaker 3-1601-32B During Refuel Outage Local Leak Testing - Dresden Unit 3 ML17252A9131975-04-23023 April 1975 Letter Confirming a 04/23/1975 Conversation Concerning Failure of Feedwater Check Valves, 3-220-58A and 62A, and 3A Feedwater Line to Pass Local Leak Rate Test During Refuel Outage Surveillance - Dresden Unit 3 ML17252A7871975-03-19019 March 1975 Note to Confirm a Conversation Concerning Routine Main Steamline High Radiation Monitor Surveillance in Which the a and B Monitors Were Found to Have Set Points in Excess of Technical Specification Values - Dresden Unit 3 ML17252A7891975-03-19019 March 1975 Note to Confirm a Conversation Concerning Routine Main Steamline High Radiation Monitor Surveillance in Which the a and B Monitors Were Found to Have Set Points Exceeding the Techspec Value of 3 Times Background - Dresden Unit 3 ML17252A8241975-02-18018 February 1975 Note to Confirm a Conversation Concerning Discovery of a Leaking Containment Inerting Isolation Valve A03-1601-21 During Local Leak Rate Testing - Dresden Unit 3 ML17252A8251975-02-18018 February 1975 Note Confirming a Conversation Concerning Failure of Bergen Patterson Piping Restraint Number 19 on the Unit 3 HPCI Main Steam Line in the Dry-Well - Dresden Unit 3 ML17252B0291975-02-10010 February 1975 Letter Confirming a 02/10/1975 Conversation Concerning a Leak in a 3/4 Inch Vent Line at Weld on 3C Reactor Feed Pump Casing - Dresden Unit 3 ML17252A8231975-02-10010 February 1975 Note to Confirm a Conversation Concerning a Leak in a 3/4 Inch Vent Line at a Well on 3C Reactor Feed Pump Casing - Dresden Unit 3 ML17252A8371975-01-0707 January 1975 Note Confirming a Conversation Concerning a Xenon Transient Experienced on Unit 3 During a Control Rod Pattern Alteration - Dresden Unit 3 ML17252B0281975-01-0606 January 1975 Letter Confirming a 01/06/1975 Conversation Concerning Excess Chloride Content in Reactor Coolant Water During an Extended Reactor Cleanup System Maintenance Outage - Dresden Unit 3 ML17252A8321975-01-0606 January 1975 Note to Confirm a Conversation Concerning Excess Chloride Content in Unit 3 Reactor Coolant Water During a Extended Reactor Cleanup System Maintenance Outage - Dresden Unit 3 ML17252A4841974-12-0606 December 1974 Letter Confirming a 12/02/1974 Conversation Concerning the Discovery of Minor Leaks on the Minimum Flow Lines for 3A and 3B Reactor Feed Pumps - Dresden Unit 3 ML17252A4911974-10-23023 October 1974 Letter Confirming a 08/28/1974 Conversation Concerning a Failure to Maintain the 3A Core Spray Discharge Header in a Filled Condition - Dresden Unit 3 ML17252A4951974-10-0404 October 1974 Letter Confirming a 10/04/1974 Conversation Concerning the Discovery of DPI83-2352 with a Setpoint Greater than the Technical Specification ML17252A4971974-09-30030 September 1974 Letter Confirming a 09/30/1974 Conversation Concerning Discovery of Lits 3-263-72A and the Set Points Exceeding Technical Specifications ML17252A5001974-09-24024 September 1974 Letter Confirming a 09/24/1974 Conversation Concerning a Through Wall Crack Discovered on Torus Purge Inlet Line 3-8506-18 - Dresden Unit 3 ML17252A5011974-09-24024 September 1974 Letter Confirming a 09/21/1974 Conversation Concerning a Minor Leak from Feed Water Pressure Tap 3241-12A - Dresden Unit 3 ML17252A5051974-09-0909 September 1974 Letter Confirming a 09/09/1974 Conversation Concerning Failure of E Tip Valve to Close - Dresden Unit 3 ML17252B0311974-08-28028 August 1974 Letter Confirming a 08/23/1974 Conversation Concerning a Failure to Maintain the 3A Core Spray Discharge Header in a Filled Condition as Required by Technical Specifications - Dresden Unit 3 ML17252A5071974-08-14014 August 1974 Letter Confirming a 08/08/1974 Conversation Concerning a Failure of the Solenoid Operated Isolation Valve Associated with the 3B Traversing Encore Probe to Close - Dresden Unit 3 ML17252A5081974-08-0606 August 1974 Letter Confirming a 07/26/1974 Conversation Concerning Failure of the Seat Material of the Air Operated Primary Containment Isolation Valve A03-1601-22 - Dresden Unit 3 ML17252A5111974-07-29029 July 1974 Letter Confirming a 07/29/1974 Conversation Concerning Failure of the Seat Material of Air Operated Isolation Valve AO-3-1601-21 - Dresden Unit 3 ML17252A5121974-07-29029 July 1974 Letter Confirming a 07/26/1974 Conversation Concerning the Failure of the Seat Material of Air Operated Primary Containment Valve A03-1601-22 - Dresden Unit 3 ML17252A5151974-07-23023 July 1974 Letter Confirming a 07/19/1974 Conversation Concerning the Discovery of HPCI High Steam Flow Isolation Switch DPIS 3-2352 to Be Out of Flex - Dresden Unit 3 ML17252A5161974-07-19019 July 1974 Letter Confirming a 07/19/1974 Conversation Concerning Discovery of HPCI High Steam Flow Isolation Switch DPIS 3-2352 to Be Out of Flex - Dresden Unit 3 ML17252A5171974-07-16016 July 1974 Letter Confirming a 07/16/1974 Conversation Concerning the Failure to Reach the Required Containment Oxygen Concentration of 4 Percent within 24 Hours of Placing Mode Switch in Run Position - Dresden Unit 3 ML17252A5271974-07-0505 July 1974 Letter Confirming a 05/24/1974 Conversation Concerning the Discovery of a Set Point Drift of L.I.T.S. 3-263-72A Beyond the Technical Specification - Dresden Unit 3 ML17252A5261974-06-24024 June 1974 Letter Confirming a 06/24/1974 Conversation Concerning a Failure of the Air Supply to the Feed Water Regulating Valve on 06/23/1974 - Dresden Unit 3 ML17252A5291974-06-24024 June 1974 Letter Confirming a 06/24/1974 Conversation Concerning a Failure of the Air Supply to the Feed Water Regulating Valve on 06/23/1974 - Dresden Unit 3 ML17252A5251974-06-17017 June 1974 Letter Confirming a 06/17/1974 Conversation Concerning the Failure of Main Steam Drain Valve M03-220-2 to Operate Properly on 05/22/1974 - Dresden Unit 3 ML17252A5361974-06-17017 June 1974 Letter Confirming a 06/17/1974 Conversation Concerning a Failure of Main Steam Valve M03-220-2 to Operate on 05/22/1974 - Dresden Unit 3 ML17252A5241974-06-12012 June 1974 Letter Confirming a 06/12/1974 Conversation Concerning the Discovery of 2 Reactor High Pressure Scram Switches (PS-3-263-55A and C) with Set Points Above the Technical Specification Limit - Dresden Unit 3 ML17252A5231974-06-11011 June 1974 Letter Confirming a 06/11/1974 Conversation Concerning a Small Leak in Line 3-3037B - Dresden Unit 3 ML17252A5401974-06-11011 June 1974 Letter Confirming a 06/11/1974 Conversation Concerning a Small Leak in Line 3-3037B - Dresden Unit 3 ML17252B0321974-06-10010 June 1974 Letter Confirming a 06/10/1974 Conversation Concerning a Failure of a Three Quarter Inch Nipple on Reactor Feed Pump Dispatch Line 3-3201-24 - Dresden Unit 3 2017-09-09 |
Text
UNITED STATES ATOMIC ENERGY COMMISSION DIRECTORATE OF REGULATORY OPERATIONS REGION Ill 799 ROOSEVELT ROAD GLEN ELLYN, ILLINOIS 60137 ------------* ----*--TEL.EPHONE
_______ (312).858-28&0-
-*----A. RO Inspect-ion Report No. Transmittal Date Distribution:
RO Chief, FS&EB RO:HQ (5) DR Central Files Regulatory Standards (3) Licensing (13) RO Files Distribution:
RO Chief, FS&EB RO:HQ (4) L:D/D for Fuels & Materials DR Central Files .RO Files B. RO Inquiry Report No. -
- c. Transmittal Date Distribution:
RO Chief, FS&EB RO:HQ (5) DR Central Files Regulatory Standards (3) Licensing (13) RO Files Incident Notification From: Transmittal Date Distribution:
RO Chief, FS&EB RO:HQ (4) Licensing (4) pR Central File§ RO Fil,es Distribution:
RO Chief, FS&EB RO:HQ DR Central Files RO Files Commonwealth Edison Co. Docket No. 50-249 (Licensee
& Docket No. (or License No.) August 6, 1974 Distribution:
RO Chief, FS&EB RO :HQ* (4) L:D/D for Fuels & Materials DR Central Files RO Files . (
c*-. ____
_ YEE4_62-'
y*.044299C20-7->-f!0--0'7-126/1-4--18-34
* ------* c* ICS IPMVEID 04277 TOVE MORR IS IL 9507@420P
- REGIONAL DIRECTOR * * . . . TEL:E0ru.b1S (OTHER YONEY . DIR ECTOR A TE OF REGULA TORY.
req1.rnsted?
__
REGION .3 WUX . Sl'.:CTION SECT,wN ebr. & NameJ-o"l . lt . ..3 lf/,2 .
4.:: (o 0 . ,__us ATOMIC ENERGY 11.x1. Tiir:edld To -(fl:; B.1_.....,fu,....i_----*
799 ROOSEVELT RD be or fihd ,r)"v\e'.:..;
i) GLEN ELLYN IL W tii5).
to deliver (Indio.ate DA or BY) , ,;
...... _.;,_ __
SUBJECT DPR-25 DRESDEN NUCLEAR POWER UNION 3 THIS WILL CONFIRM A CONVERSTATION WITH F.
OF YOUR OFFICE THIS DATE CONCERNING THE FAILURE OF THE SEAT rATERIAL OF AN AIR OPERATED PRIMARY ISOLATION VALVE. THE OTHER VALVE IN LINE WITH THIS VALVE HAS BEEN PLACED * * ( sF.1201 ,,ti.6 lHE ISOLATED CONDITION IN ACCORDANCE WITH SEC.TION 3.7.D.2 ****---*-*, C. .. (_ .... , .. ,. l._ c c (., c c c -.. **. [-.... *-_.. ! .. , * '"; ('\ ** v* ,:_,_b OF THE SPECIFICATION.
PREPARATIONS ARE_ NOW UNDER WAY TO THE TIGHTNESS OF fHE VALUVES WHICH PROVIDE THE PRESSURE BOUNDARY IN THIS LINE B B STPHENSON SUPERINTENDENT DRESDEN NUCLLEAR POWER STATION COMMONWELATH CO RRl MORR IS ILLINOIS NNNN JUL 3 1 : 974 . . .... *, ... ---*-.I *
- a @I
- a c .i' . ;J. ,., Ei1 ft
( (*-c c ..-****. i.
799 ROOSEVELT
- rn 'GLEN IL 6013T SU3JECT POWER STATION UN1T 3. THIS WILL CONFIJH-
- . ti" WJJK:F:. MA .. W..RA.,, O.f YO..UR OFFICE AT 1445 HOURS 'THIS' DATE CONSERNING A FAILURE OF THE SEAT .; r. MATERIAL OF AIR OPPERATED VALVE A0-3-1601-21.
THIS --VAL VE: *WHICH IS VJ SERIES WITH THE PREVIOUSLY REPORTED A0-3-160122 VALVE WAS DISCOVERED TO HAVE SEAT DEGREDATION BY , i *-L 0 CAL LEAK RATE TESTING AT 2300 '-!OURS JULY 26, A
- .. SHUTDOWN WAS COMMENCE:D AND THE REACTOR !1iAS IN COLD
- AT 0900 JULY,* 27., 1974 .* 'AD.DITION.l\L DETAILS IN THE FORM OF A TEN (_ SF-1201 (R5-69) ( c ( c .. :-. *:*:::.
.. :: .. -:*-:*::::=.-
.. :. . .. --....... DAY LETTER EE FORTHCOMING B E STEP4ENSON DRESDEN NUCLEAR POWER STATION COMMONWEATH EDISON COMPANY R R #l MORRIS ILL 60450 *.' JUL 3 1 SF-1201 (R5-69) .. .. -..: ' ....... ,-tt: @I.. .. ..... .