Provides Clarification for Several Statements Made in NRC Insp Rept 50-244/97-12 Dtd 980209
ML17265A248
Person / Time
Site: Ginna Constellation icon.png
Issue date: 04/24/1998
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To: Vissing G
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
50-244-97-12, NUDOCS 9805060235
Download: ML17265A248 (4)


See also: IR 05000244/1997012

Text

CATEGORY j.REGULATORY

INFORMATION

DISTRIBUTION

SYSTEM (RIDS)05060235 DOC.DATE: 98/04/24 NOTARIZED:

NO DOCKET¹ert Emmet Ginna Nuclear Plant Unit 1 Rochester G 05000244 ACCESSION NBR:98 FACIL:50-244

Rob AUTH.NICE.AUTHOR AFFILIATION

~~MECREDY,R.C.

Rochester Gas&Electric Corp.RECIP.NAME

RECIPIENT AFFILIATION

VISSING,G.S.

DISTRIBUTION

CODE: IEOID COPIES RECEIVED:LTR

\ENCL Z SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice

of Violation Response SUBJECT: Provides clarification

for several statements

made in NRC insp rept 50-244/97-12'td

980209.NOTES:License

Exp date in accordance

with 10CFR2,2.109(9/19/72).

05000244 E RECIPIENT ID CODE/NAME PD1-1 PD INTERNAL: AEOD/SPD/RAB

DEDRO NRR/DRCH/HHFB

NRR/DRPM/PERB

OE DIR RGN1 FILE 01 COPIES LTTR ENCL RECIPIENT ZD CODE/NAME VISSZNG,G.

NRR/DRPM/PECB

NUDOCS-ABSTRACT

OGC/HDS3 COPIES LTTR ENCL 0 EXTERNAL: LITCO BRYCE,J H NRC PDR NOAC NUDOCS FULLTEXT D 0 N NOTE TO ALL"RIDS" RECIPIENTS

PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION

REMOVED FROM DISTRIBUTION

LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 17 ENCL

April 24, 1998 U.S.Nuclear Regulatory

Commission

Document Control Desk Attn: Guy S.Vissing Project Directorate

I-1 Washington, D.C.20555 Subject: Ref.(1)(2)(3)(4)Clarification

of Statements

Made in NRC Inspection

Report 50-244/97-12, dated February 9, 1998 NRC Integrated

Inspection

Report 50-244/97-12

and Notice of Violation, dated February 9, 1998 Letter from R.E.Smith, RGEE, to NRC, Subject: Response to NRC Request for Information

Pursuant to 10CFR50.54(f)

Regarding Adeqacy and Availability

of Design Information

R.E.Ginna Nuclear Power Plant, dated February 7, 1997 Letter from R.C.Mecredy, RG&E, to G.S.Vissing, NRC,.Subject: Update to Response to NRC Request for Information

Pursuant to 10CFR50.54(f)

Regarding Adequacy and Availability

of Design Basis Information

R.E.Ginna Nuclear Power Plant, dated September 30, 1997 Letter from'.C.Mecredy, RG6E, to NRC, Subject: Submittal of Security Plan revision M, dated July 24, 1997 Dear Mr.Vissing: This letter is to provide clarification

for several statements

made in NRC Inspection

Report 50-244/97-12.

1)Statement:

Section E1.3'D v page 14 states"The UFSAR verfication

project was scheduled to proceed in parallel with the validation

of all other design basis source documents so that an electronic

link of these yource documents to a living UFSAR could be accomplished

by October 1998 for use during the DBD project." Clarification:

The UFSAR verification

project and design basis documentation

project are not proceeding

in parallel.This was explained in our letter dated September 30, 1997 (Reference

3).The UFSAR verfication

and design basis documentation

projects use some of the same resources;

therefore, it was decided to concentrate

on the UFSAR verification

project until 9805060235

980424'DR ADQCK 05000244 8 PDR

April 24, 1998 page 2 October 18, 1998 and then shift additional

resources to the design basis documentation

project.The links from the UFSAR to the source documents will not be completed until December 2001 as explained in Reference 3.'2)Statement:

Section E1.3 L'n D i n Ba'v'age 14 states"With the completion

of the service water safety system functional

inspection (SSFI)and the NRC design team inspection

of Ginna, RG&E noted in the updated response letter of September 30, 1997, that they had completed the commitment

to perform two SSFIs in 1997.RG&E indicated that they would perform a SSFI of the AFW system in 1998." 3)Clarification:

RG&E has determined

we, should concentrate

the majority of our resources on the Design Basis Documentation (DBD)and UFSAR verification

projects described above, as well's closeout.of Motor-Operated

Valve (GL89-10)and Service Water (GL89,-13)

issues.Therefore, RG&E is not currently intending to perform an AFW system SSFI in 1998.Statement:

Section ES F 1 V'n-2 Ev T m HQV-4~1 , page 17 states"The inspector noted that the licensee work in compiling a document of all variables used in the UFSAR Accident Analysis chapter was partially complete and was scheduled for completion

by March 1, 1998, according to'OS598 in the licensee's

Commitment

and Action Tracking System (CATS)..." Clarification:

The scope of the compilation

of the major variables used in the UFSAR Accident Analysis chapter has been expanded to include additional

items, such as accident and analysis assumptions, valve stroke times and setpoints.

This effort is currently scheduled to be completed by June 30, 1998.Statement:

Section E8.2 v I 04~S rv'm R imiz'r W page 18 states"In addition to issues related to heat exchanger performance

testing and revision of the SWSROP, comments were made regards.ng

the need to update the SW system hydraulic flow model since it under predicted flows in some cases.The licensee indicated that this work was being done in-house and was scheduled for completion

by the end of January 1998." Clarification:

Additional

testing has been performed to better predict flows to the CRFC motor coolers.With the inclusion of this data, the SW system Hydraulic model is expected to be refined by June 16, 1998.

April 24, 1998 Page 3 5)Statement:

Section S3 u'fe ua d P ur s page 23 states"The inspectors

verified that selected changes to the Plan associated

with the vehicle barrier system (VBS), as implemented, did not decrease the effectiveness

of the Plan.Discussions

with the licensee indicated that the plan was currently being reviewed and a plan revision would be submitted in accordance

with the provisions

of 10CFR 50.54(p)in the near future." Clarification:

RGRE submitted a Security Plan revision M on July 24, 1997 (Refe'rence

4)which provided enhancement

to the VBS.Also, RGGE submitted Security Plan revision N on January 15, 1998 although this revision was not related to the VBS.Very truly yours, Robert C.Mecredy GJWE498 xc: Mr.Guy S.Vissing (Mail Stop 14B2)Senior Project Manager Project Directorate

I-1 Washington, D.C.20555 Mr.Hubert J.Miller U.S.Nuclear Regulatory

Commission

Regional Administrator, Region I 475 Allendale Road King of Prussia, PA 19406 Ginna Senior Resident Inspector