ML18100A899

From kanterella
Revision as of 12:44, 17 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
LER 94-001-00:on 940115,TS 3.0.3 Entries Occurred Due to Deenergizing Analog Rod Position Indication Sys for All Control Rods.Module 2SB4 & Span of Module Adjusted,Channel Check Performed & TS 3.0.3 exited.W/940210 Ltr
ML18100A899
Person / Time
Site: Salem PSEG icon.png
Issue date: 02/10/1994
From: Hagan J, Pastva M
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LER-94-001-01, LER-94-1-1, NUDOCS 9403030068
Download: ML18100A899 (5)


Text

Public Service, Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038 Salem Generating Station u. s. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Dear Sir:

SALEM GENERATING STATION LICENSE NO. DPR-75 DOCKET NO. 50-311 UNIT NO. 2 LICENSEE EVENT REPORT 94-001-00 February 10, 1994 This Licensee Event Report is being submitted pursuant to the requirements of Code of Federal Regulation lOCFR50.73(a)

(2) (i) (B). Issuance of this report is required within thirty (30) days of event discovery.

MJPJ:pc Distribution 2200;)0 9403030068 940210 :DR ADOCK PDR Sincerely yours, t \\ 95-2189 REV 7-92 NRC FORM 366 (5*92) . NUCLEAR REGULATORY COMMISSION

!APPROVED BY OMB NO. 3150-0104 EXPIRES 5/31 /95 LICENSEE EVENT REPORT (LER) !See reverse for required number of digits/characters for each block) ESTIMATED BURDEN PER RESPONSE TO COMPLY WITH THIS INFORMATION COLLECTION REQUEST: 50.0 HRS. FORWARD COMMENTS REGARDING BURDEN ESTIMATE TO THE INFORMATION AND RECORDS MANAGEMENT BRANCH (MNBB 7714), U.S. NUCLEAR REGULATORY COMMISSION, WASHINGTON, DC 20555-0001, AND TO THE PAPERWORK REDUCTION PROJECT (3150-0104), OFFICE OF MANAGEMENT AND BUDGET, WASHINGTON, DC 20503. FACILITY NAME (1) DOCKET NUMBER (2) PAGE (3) Salem Generating Station -Unit 2 05000 311 1 OF 04 TITLE (4) TS 3.0.3 Entry: Inoperability of ARPI System to Support Maintenance Troubleshooting.

EVENT DATE (5) LER NUMBER (6 REPORT NUMBER (7) OTHER FACILITIES INVOLVED (8) FACILITY NAME DOCKET NUMBER MONTH DAY YEAR YEAR SEQUENTIAL NUMBER 05000 REVISION YEAR MONTH DAY NUMBER FACILITY NAME DOCKET NUMBER 01 15 94 001 00 02 10 94 05000 OPERATING THIS REPORT IS SUBMITTED PURSUANT TO THE REQUIREMENTS OF 10 CFR t: (Check one or more (11) MODE (9) 1 20.402(b) 20.405(c) 50.73(a)(2)(iv) 73.71 (b) POWER 20.405(a)(1

)(i) 50.36(c)(1) 50.73(a)(2)(v) 73.71 (c) LEVEL (10) 100 20.405(a)(1

)(ii) 50.36(c)(2) 50.73(a)(2)(vii)

OTHER ***************:*!****

.. -;:: :**. :.: . :*** 20.405(a)

(1) (iii) x 50.73(a)(2)(i) 50.73(a)(2)(viii)(A) (Specify in Abstract below and in Text, NRC 20.405(a)(1

)(iv) 50.73(a)(2)(ii) 50.73(a)(2)(viii)(B)

Form 366A) 20.405(a)(1

)(v) 50. 73(a)(2)(iii)

50. 73(a)(2)(x) . LICENSEE CONTACT FOR THIS LER (12) NAME TELEPHONE NUMBER (Include Area Code) M. J. Pastva, Jr. -LER Coordinator (609) 339-5165 COMPLETE ONE LINE FOR EACH COMPONENT FAILURE DESCRIBED IN THIS REPORT (13) CAUSE SYSTEM COMPONENT MANUFACTURER REPORTABLE TO NPRDS SUPPLEMENTAL REPORT EXPECTED (14) I YES NO (If yes, complete EXPECTED SUBMISSION DATE) X CAUSE ABSTRACT (Limit to 1400 spaces, i.e., approximately 15 single-spaced typewritten lines) (16) SYSTEM COMPONENT MANUFACTURER 11EPORTABLE TO NPRDS EXPECTED MONTH DAY YEAR SUBMISSION DATE (15) Two intentional Technical Specification (TS) 3.0.3 entries occurred on 1/15/94 (from 0045 to 0047 hours5.439815e-4 days <br />0.0131 hours <br />7.771164e-5 weeks <br />1.78835e-5 months <br />, and from 0056 to 0059 hours6.828704e-4 days <br />0.0164 hours <br />9.755291e-5 weeks <br />2.24495e-5 months <br />) due to deenergizing the Analog Rod Position Indication (ARPI) System for all control rods. These events occurred due to removil'ig the 115-volt alternating current (AC) power supply fuses to the ARPI System primary and auxiliary 13-volt direct current negative and positive power supplies.

This was done to support correction 9f ARPI indicator drift for rod 2SB4. Rod positions, as compared to the rod group demand indicator, were correct prior to fuse removal and following fuse The root cause of these events is ARPI System design that resulted in the conservative approach requiring the TS 3.0.3 entries to avoid possible equipment damage during repair of the 2SB4 indication drift. Adjustments were made to the 2SB4 signal conditioning module and the module span, based on redeveloped secondary voltage value to the module. 'A channel check demonstrated ARPI operability, and TS 3.0.3 was exited. PSE&G will continue participation in the industry Rod control User's Group and will utilize User's Group and vendor recommendations regarding ARPI System drift. NRC FORM 366 15-92)

  • LICENSEE EVENT REPORT (LER) TEXT CONTINUATION Salem Generating station Unit 2 DOCKET NUMBER 5000311 PLANT AND SYSTEM IDENTIFICATION:

Westinghouse

-Pressurized Water Reactor LER NUMBER 94-001-00 PAGE 2 of 4 Energy Industry Identification System (EIIS) codes are identified in the text as {xx} IDENTIFICATION OF OCCURRENCE:

Technical Specification

{TS) 3.0.3 entries; Inoperability of Analog Rod Position Indication (ARPI) System to Support Maintenance Troubleshooting Event Date: 1/15/94 Report Date: 2/10/94 This report was initiated by Incident Report No.94-017. CONDITIONS PRIOR TO OCCURRENCE:

Mode 1 Reactor Power 100% -Unit Load 1180 MWe DESCRIPTION OF OCCURRENCE:

Two intentional TS 3.0.3 entries occurred on January 15, 1994 (from 0045 to 0047 hours5.439815e-4 days <br />0.0131 hours <br />7.771164e-5 weeks <br />1.78835e-5 months <br />, and from 005'6 to 0059 hours6.828704e-4 days <br />0.0164 hours <br />9.755291e-5 weeks <br />2.24495e-5 months <br />) due to deenergizing the ARPI system {AA} for all control rods. These events occurred due to removing the 115-volt alternating current {AC) power supply fuses to the primary and auxiliary 13-volt direct current negative and positive power supplies for the ARP! System. This was done, as a conservative measure, to support correction of ARP! indication drift affecting rod 2SB4. Rod positions, as compared to the rod group demand indicator, were correct prior to fuse removal and following fuse reinstallation.

ANALYSIS OF OCCURRENCE:

ARP! operability is required to determine individual control rod position and ensure compliance with control rod alignment and insertion limits assumed in the accident analyses.

ARP! provides actual rod position to the following locations:

the Control Board dual channel position indicator modules (supplied by Dixon), the Safety Parameter Display System {SPDS), the main process.P250 and .locally via the digital multimeter (DMM). TS 3.1.3.2.1 addresses the operability requirement of the "Reactivity Control System's" position indicating systems. The indicators are determined operable by verifying that the rod position indication

  • LICENSEE EVENT REPORT (LER) TEXT CONTINUATION Salem Generating Station Unit 2 DOCKET NUMBER 5000311 ANALYSIS OF OCCURRENCE: (cont'd) LER NUMBER 94-001-00 PAGE 3 of 4 system agrees within twelve (12) steps of the group demand counters.

If more than one ARPI per bank is inoperable, the Limiting Condition For Operation and associated ACTION requirements of TS 3.1.3.2.1 are not met and TS 3.0.3 therefore applies. *Two intentional TS 3. o_. 3 entries occurred to support correction of instrument drift affecting the ARP! of control rod 2SB4. The 115-volt alternating current power supply fuses (total of four) to the primary and auxiliary 13-volt direct current negative and positive power supply for the ARP! system were removed. This was done, as a conservative measure, to eliminate potential electrical shorting of the 2SB4 ARP! signal conditioning module and damage to the 13-volt de power supplies.

Rod positions, as compared to the rod group demand indicator, were correct prior to fuse removal and following fuse reinstallation.

Adjustments were made to the 2SB4 signal conditioning module and the module span, based on redeveloped secondary AC voltage value to the module. A channel check demonstrated ARP! operability, and TS 3.0.3 was exited. APPARENT CAUSE OF OCCURRENCE:

The cause of these events is "Design, Manufacturing, Construction/Installation", as classified in Appendix B of NUREG-1022.

Design of the ARPI System necessitated the TS 3.0.3 entries to avoid possible equipment damage during repair of the 2SB4 indication drift. PREVIOUS OCCURRENCES:

Prior events, requiring TS entry due to ARPI design concerns, have occurred on both Salem Units, as reported in LERs 272/93-007-00, 272/94-001-00, 311/92-016-00, and 311/93-010-00.

As a result of these events (those occurring prior to 1994), System Engineering has developed an ARP! trending data base to identify problem electronic modules. In addition, the industry Rod Control User's Group has recognized an industry-wide problem with ARP! System drift. Recommendations from this group and from the vendors will be used to develop appropriate action. SAFETY SIGNIFICANCE:

These events did not affect the health and safety of the public and are reportable to the NRC pursuant to Code.of Federal Regulations lOCFR 50. 73 (a) (2) (i) (B). Removing the subject fuses deenergized ARPI and resulted in no control rod position indication at the Control Room control rod console.

  • ,.
  • LICENSEE EVENT REPORT (LER) TEXT CONTINUATION Salem Generating Station Unit 2 SAFETY SIGNIFICANCE: (cont'd) DOCKET NUMBER 5000311 LER 94-001-00 PAGE 4 of 4 However, fuse removal did not affect operability of control rod overhead annunciators and RP3 "Rod Bottom" indication.

Had a Reactor trip occurred while the fuses were removed, performing the 2SB4 troubleshooting and repair, could have reinstalled the fuses to restore the ARPI System. As such, the removal of the fuses would not have significantly affected the Control Operators' response to a trip.

  • In response to any known or suspected complete/partial loss of ARPI, the Control Operator will notify Reactor Engineering and the Maintenance Controls Department, in accordance with procedure Sl.OP-AB.ROD-OU04(Q), "ROD POSITION INDICATION FAILURE", to ensure that shutdown margin is maintained and to investigate and correct the cause of the problem. In addition, Reactor Operators utilize alternate monitoring systems; i.e. Nuclear Instrumentation, Reactor Power Range channels, and Intermediate and Source Range channels to confirm a Reactor trip coincident with unavailability of the ARPI. CORRECTIVE ACTION: The 2SB4 module and the span of the modul.e were adjusted, a channel check was performed which demonstrated the ARPI operability, and TS 3.0.3 was exited. PSE&G will continue participation in the industry Rod Control User's Group and will utilize User's Group and vendor recommendations regarding ARPI system drift. MJPJ:pc SORC Mtg.94-014