ML19135A335

From kanterella
Revision as of 23:33, 28 May 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
(PVNGS) Units 1, 2, and 3 - Response to Regulatory Issue Summary (RIS) 2019-02, Preparation and Scheduling of Operator Licensing Examinations
ML19135A335
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 05/15/2019
From: Kura M E
Arizona Public Service Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
102-07918-MEK/MMD, RIS 2019-002
Download: ML19135A335 (3)


Text

~)aps 102-07918-MEK/MMD May 15, 2019 ATIN: Document Control Desk U. S. Nuclear Regu l atory Commission Washington, DC 20555-0001

Dear Sir:

Subject:

Palo Verde Nuclear Generating Station (PVNGS) Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 RIS 2019-02 Palo Verde Nuclear Generating Station P.O. Bo x 52034 P t1oen i x, A Z 850 72 M ail Statio n 76 3 6 Tel: 6 23*3 93-5 379 Response to Regulatory Issue Summary (RIS) 2019-02, Preparation and Scheduling of Operator Licensing Examinations This letter provides Arizona Public Service Company's voluntary response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations.

Enclosed with this l etter is NRC Form 536, which provides the proposed schedule of operator licensing examinations at PVNGS for calendar years 2021 through 2024. No commitments are being made to the NRC by this letter. If you have any questions or req u ire additional information, please contact J;=ired J. Shaver, Nuclear Trainihg Section Leader, at (623) 393-4519.

Matthew E. Kura Department Leader, Regulatory Affairs, Compliance MEK/MMD

Enclosure:

NRC Form 536, Operator Licensing Examination Data cc: G. E. Werner K. D. Clayton J. A. Bridges C. A. Peabody NRC Region IV, Chief, Operations Branch NRC Region IV, Chief Examiner NRC Region IV, Licensing Assistant, Operations Bran c h NRC Senior Resident Inspector for PVNGS A member of S T ARS Alliance LLC Callaway* Diablo Canyon* Palo Verde* Wolf Creek Enclosure NRC Form 536 Operator Licensing Examination Data NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB: NO. 3160-0131 EXPIRES: 11/30/2020 (11-2017)

~,.RAIO<,-<<'.

-~P -f"' Estimated burden per response to comply with this voluntary Information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This :/'~o.., OPERA TOR LICENSING information collection Is used to plan budgets and resources for operator examinations.

Send :. oomments regarding burden estimate to the Information Services Branch (T-2 F43), U.S. Nuclear . EXAMINATION DATA O ~~IIIIIIC--

'IJ/' Regulato,y Commission, Washington, DC20555-0001, or by e-mail ID lnfooollects.Resource@nrc.gov, ~'+-:;'~ '+o# and to the Desk Officer, Office of Information and Regulato,y Affairs, NEOB-10202, (3150-0131), Office .........

of Management and Budget Washington, DC 20503. If a means used to Impose an information oollection does not display a currenUy valid 0MB oontrol number, the NRC may not conduct or sponsor, and a person Is not required to respond to, the Information oollection.

FACILITY NRC REGION Palo Verde Nuclear Generating Station l1v I 50-528, 50-529, 50-530 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2021 CY 2022 CY 2023 cy2024 -----ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED EXAMINATIONS

8. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2021 CY2022 CY2023 CY2024 ----NUMBER OF REACTOR 10 IO IO IO OPERATORS NUMBER OF SENIOR REACTOR 1 1 1 1 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 5 5 5 5 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR OPERATORS

-LIMITED PROPOSED DATES PRIMARY DATE 04/26/2021 05/02/2022 05/01/2023 04/29/2024 AL TERNA TE DATE 05/24/2021 04/04/2022 04/03/2023 04/01/2024 NRC FORM 536 (11-2017)