ML22144A025

From kanterella
Jump to navigation Jump to search
2022-05-DRAFT Outline Comments
ML22144A025
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 05/12/2022
From: Heather Gepford
NRC/RGN-IV/DORS/OB
To:
Arizona Public Service Co
References
Download: ML22144A025 (1)


Text

Attachment 6 OBDI 202 - IOLE Process Rev 3 PROPOSED OUTLINE COMMENTS Facility:

Palo Verde First Exam Date:

5/2/22 Written Exam Outline Comment Resolution 1 NRC Generated Administrative JPM Outline Comment Resolution 1 Dont believe it is, but does A5 give away S1, or vice versa?

Does not.

Control Room / In-Plant System JPM Outline Comment Resolution 1

I thought we talked during the kickoff call regarding an alternate path JPM in-plan that the Upgrades would have to perform. Is there any way to alter P1 or P3 to alternate path?

Will replace P2 with an alternate path.

Simulator Scenario Outline Comments Comment Resolution 1

Scenario 2, CT2. Is it possible that any or all of the RCPs could auto trip in less than 30 minutes? If so, that needs to considered as part of the measurable performance indicator.

No auto trips on the RCPs.

2 In the narrative for scenarios 3 and 4, please identify the contingency EOPs to be exercised.

Will add.