ML18192A907
From kanterella
Revision as of 05:51, 25 April 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
ML18192A907 | |
Person / Time | |
---|---|
Site: | Oconee |
Issue date: | 12/31/2017 |
From: | Duke Energy Carolinas |
To: | Office of Nuclear Reactor Regulation |
Shared Package | |
ML18192A809 | List:
|
References | |
ONS 2018-026 | |
Download: ML18192A907 (60) | |
Similar Documents at Oconee | |
---|---|
Category:Drawing
MONTHYEARML22124A2052022-05-0404 May 2022
[Table view]Summary of May 4, 2022, Clarification Call with Duke Energy Carolinas, LLC, Application to Revise TS 3.7.7, Low Pressure Service Water (LPSW) System ML20189A0912020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 8, Appendix 8B, Figures ML20189A0882020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 7, Appendix 7B, Figures ML20189A0852020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 6, Appendix 6B, Figures, (Redacted Version) ML20189A0822020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 5, Appendix 5B, Figures ML20189A0792020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 4, Appendix 4B, Figures ML20189A0762020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3B, Figures ML20189A0732020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B, Figures ML20189A0702020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 1, Appendix 1B, Figures, (Redacted Version) ONS-2018-038, Independent Spent Fuel Storage Installation, Appendix B. Figures, UFSAR, Rev. 272018-06-29029 June 2018 Independent Spent Fuel Storage Installation, Appendix B. Figures, UFSAR, Rev. 27 ML18192A9722017-12-31031 December 2017 Revision 27 to Updated Final Safety Analysis Report, Chapter 13, Appendix 13B, Figures ML18192A8942017-12-31031 December 2017 Revision 27 to Updated Final Safety Analysis Report, Chapter 1, Appendix 1B, Figures (Redacted) ML18192A9012017-12-31031 December 2017 Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B, Figures ML18192A9072017-12-31031 December 2017 Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3B, Figures ML18192A9152017-12-31031 December 2017 Revision 27 to Updated Final Safety Analysis Report, Chapter 4, Appendix 4B, Figures ML18192A9482017-12-31031 December 2017 Revision 27 to Updated Final Safety Analysis Report, Chapter 9B, Figures (Redacted) ML18192A9542017-12-31031 December 2017 Revision 27 to Updated Final Safety Analysis Report, Chapter 10, Appendix 10B, Figures ML18192A9622017-12-31031 December 2017 Revision 27 to Updated Final Safety Analysis Report, Chapter 11, Appendix 11B, Figures ML17003A1222017-01-0303 January 2017 Drawing No. PO-107B-3, Rev. 10, Diagrammatic Layout of Liquid Waste Disposal System (Miscellaneous Waste Portion). ONS-2017-048, Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 15, Appendix 15B, Figures 15-1 Through 15-2322016-12-31031 December 2016 Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 15, Appendix 15B, Figures 15-1 Through 15-232 ML17234A1242016-12-31031 December 2016 Revision 26 to Updated Final Safety Analysis Report, Chapter 11, Appendix 11B, Figures 11-1 Through 11-6 ML17234A1202016-12-31031 December 2016 Revision 26 to Updated Final Safety Analysis Report, Chapter 10, Appendix 10B, Figures 10-1 Through 10-9 ML17234A1142016-12-31031 December 2016 Revision 26 to Updated Final Safety Analysis Report, Chapter 8, Appendix 8B, Figures 8-1 Through 8-9 ONS-2017-048, Redacted - Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 9, Appendix 9B, Figures 9-1 Through 9-46 Redacted2016-12-31031 December 2016 Redacted - Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 9, Appendix 9B, Figures 9-1 Through 9-46 Redacted ML17234A1292016-12-31031 December 2016 Revision 26 to Updated Final Safety Analysis Report, Chapter 13, Appendix 13B, Figures 13-1 Through 13-8 ML17234A1352016-12-31031 December 2016 Revision 26 to Updated Final Safety Analysis Report, Chapter 15, Appendix 15B, Figures 15-1 Through 15-232 ML17361A4102016-12-31031 December 2016 Redacted - Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 9, Appendix 9B, Figures 9-1 Through 9-46 Redacted ONS-2017-048, Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 13, Appendix 13B, Figures 13-1 Through 13-82016-12-31031 December 2016 Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 13, Appendix 13B, Figures 13-1 Through 13-8 ONS-2017-048, Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 11, Appendix 11B, Figures 11-1 Through 11-62016-12-31031 December 2016 Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 11, Appendix 11B, Figures 11-1 Through 11-6 ONS-2017-048, Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 10, Appendix 10B, Figures 10-1 Through 10-92016-12-31031 December 2016 Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 10, Appendix 10B, Figures 10-1 Through 10-9 ONS-2017-048, Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 8, Appendix 8B, Figures 8-1 Through 8-92016-12-31031 December 2016 Oconee Nuclear Station, Units 1, 2 & 3, Revision 26 to Updated Final Safety Analysis Report, Chapter 8, Appendix 8B, Figures 8-1 Through 8-9 ML1101806672011-01-0505 January 2011 Enclosure 2 (Part 2) - Major Projects Slides ML0900203552008-12-22022 December 2008 Proposed License Amendment Request to Revise Current Licensing Basis for HELB Events Outside of the Containment Building Unit 2; License Amendment Request No. 2008-006 ML0900203582008-12-22022 December 2008 Figures 5.1-9, Moisture Separator Reheater Drain System Though 5.1-12, Steam Seal Header System. ML0900203562008-12-22022 December 2008 Figures 5.1-3, Extraction Steam System Through 5.1-8, Main Steam System. ML0908907922008-04-29029 April 2008 Drawing OFD-124A-3.1, Rev 33, Flow Diagram of Low Pressure Service Water System Turbine Bldg (Low Pressure Service Water Pumps). ML0811600942008-04-21021 April 2008 Transmittal of Revision 1 to Request for Relief No. 04-ON-012 Third Ten Year Inservice Inspection Interval ML0908907842005-11-0707 November 2005 Drawing OFD-133A-2.1, Rev 26, Flow Diagram of Condenser Circulation Water System (CCW Intake Pumps Discharge). ML1019602852005-10-0101 October 2005 Monitoring Well Locations ML0908907932005-06-16016 June 2005 Drawing OFD-133A-1.1, Rev 28, Flow Diagram of Condenser Circulation Water System (CCW Intake Pumps Discharge). 2022-05-04 Category:Updated Final Safety Analysis Report (UFSAR) MONTHYEARML24179A1102024-06-27027 June 2024
[Table view]Submittal of Updated Final Safety Analysis Report Revision 30, Technical Specifications Bases Revisions, Selected Licensee Commitment Revisions, 10 CFR 50.59 Evaluation Summary Report, and 10 CFR 54.37 Update, and Notification RA-24-0141, Updated Final Safety Analysis Report Revision 302023-12-31031 December 2023 Updated Final Safety Analysis Report Revision 30 RA-22-0121, Submittal of Updated Final Safety Analysis Report (UFSAR) Revision 29, Technical Specifications Bases Revisions, Selected Licensee Commitment Revisions, 10 CFR 50.59 Evaluation Summary Report, and 10 CFR 54.37 Update, and Notification of2022-06-29029 June 2022 Submittal of Updated Final Safety Analysis Report (UFSAR) Revision 29, Technical Specifications Bases Revisions, Selected Licensee Commitment Revisions, 10 CFR 50.59 Evaluation Summary Report, and 10 CFR 54.37 Update, and Notification of Co ML20189A0942020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 9, Appendix 9B. Figures, (Redacted Version) ML20189A0802020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML20189A0922020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems ML20189A1112020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 16, Selected Licensee Commitments ML20189A1132020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 18, Aging Management Programs and Activities ML20189A1102020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 15, Appendix 15B, Figures ML20189A0812020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 5, Appendix 5A, Tables ML20189A1042020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 13, Appendix 13A. Tables ML20189A1022020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 12, Appendix 12A. Tables ML20189A1052020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 13, Appendix 13B, Figures ML20189A1032020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations ML20189A0992020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 11, Appendix 11A. Tables ML20189A0982020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML20189A1002020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 11, Appendix 11B. Figures ML20189A0692020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 1, Appendix 1A, Tables ML20189A0882020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 7, Appendix 7B, Figures ML20189A1062020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 14, Initial Tests and Operation ML20189A0872020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 7, Appendix 7A, Tables ML20189A0832020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safeguards ML20189A0822020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 5, Appendix 5B, Figures ML20189A0852020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 6, Appendix 6B, Figures, (Redacted Version) ML20189A0842020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 6, Appendix 6A, Tables ML20189A0762020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3B, Figures ML20189A0722020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2A, Tables ML20189A0912020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 8, Appendix 8B, Figures ML20189A0682020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant RA-20-0136, 8 to Updated Final Safety Analysis Report, Chapter 18, Appendix 18A. Tables2020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 18, Appendix 18A. Tables ML20189A0892020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 8, Electric Power ML20181A1182020-06-29029 June 2020 Submittal of Revision 28 to Updated Final Safety Analysis Report, Technical Specifications Bases Revisions, Selected Licensee Commitment Revisions and 10CFR50.59 Evaluation Summary Report ML20189A0702020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 1, Appendix 1B, Figures, (Redacted Version) ML20189A1012020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection ML20189A0772020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 4, Reactor ML20189A0742020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems ML20189A0752020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3A, Tables ML20189A1082020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses ML20189A0862020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control ML20189A0732020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B, Figures ML20189A0932020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 9, Appendix 9A. Tables ML20189A1092020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 15, Appendix 15A. Tables ML20189A0952020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML20189A1122020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance ML20189A0972020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 10, Appendix 10B. Figures ML20189A0962020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 10, Appendix 10A, Tables ML20189A1072020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 14, Appendix 14A, Tables ML20189A0792020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 4, Appendix 4B, Figures ML20189A0902020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 8, Appendix 8A, Tables ML20189A0782020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 4, Appendix 4A, Tables 2024-06-27 |
Text
~~~!#%'(#%%%
~~~!#%'(#'%
~~~!#$&&%
~ "$%&&&()&&*
~ "$%&&'()&
~ "$$#&
~ "#$%&$$'
~ "#$%&$$'
~ !#%&$&$$) *~ "
~ $&&%~!~
~~ #$$&'$($*((+-!
~!~
~~ "$&'(**)++
~~ "$&'(**)++
~ !#%'()++*,,-$%.%&/.%.0%2%-
~ !#%'()++*
~ "#$""#%"
~ "#$""#%"
~ "#$""#%"
~ "#%&'
~~
~
~"#$#%
~~~!"#$%&'!%&
~~~!"#%&
~~~!"#%&
~ "#%&
~ !!!#$&&&$
~ !!!
~ !!!
~ !!!
~ "#%%%#
~
~
'~
(~
~
~ "#$&'"&&&
~ "#%%%"%%%
~
~ #$'((
~"""
~~~!"#$%'()'
~~~!"$
~~~!"%&&&'(
~ "#&(')*
~ "#$$%$$($
~ #$$%
~ !!!#$&'
~ !!!
~ !!!
~ !!!
~ #$%&
~ !!!#%#
&!"#%#
&"#%#
& "#%#
- %#
&&"#%#
- %#
&$"#%#
&'"#%#
&("#%#
- %#
- %#
- %#
~ "#&#'&""+,"'
~ !!#$#
- $#
- $#
- $#
~ !!!#$#&'&
~ !!!%&(&)*,%*-&~*,%
~ !!!$&'$(')*,
~ #$$&(
Retrieved from "https://kanterella.com/w/index.php?title=ML18192A907&oldid=1498474"