Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Appendix 5B, Figures
ML18192A921
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 12/31/2017
From:
Duke Energy Carolinas
To:
Office of Nuclear Reactor Regulation
Shared Package
ML18192A809 List:
References
ONS 2018-026
Download: ML18192A921 (40)


Text

Oconee Nuclear Station UFSAR Appendix 5B. Figures Appendix 5B. Figures

Oconee Nuclear Station UFSAR Figure 5-1 (Page 1 of 1)

Figure 5-1. Reactor Coolant System (Unit 1)

(31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 5-2 (Page 1 of 1)

Figure 5-2. Reactor Coolant System (Units 2 & 3)

(31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 5-3 (Page 1 of 1)

Figure 5-3. Reactor Coolant System, Arrangement Plan (Unit 1)

(31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 5-4 (Page 1 of 1)

Figure 5-4. Reactor Coolant System, Arrangement Elevation (Unit 1)

(31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 5-5 (Page 1 of 1)

Figure 5-5. Reactor Coolant System, Arrangement Plan (Unit 2)

(31 DEC 2004)

Oconee Nuclear Station UFSAR Figure 5-6 (Page 1 of 1)

Figure 5-6. Reactor Coolant System, Arrangement Elevation (Unit 2)

(31 DEC 2017)

Oconee Nuclear Station UFSAR Figure 5-7 (Page 1 of 1)

Figure 5-7. Reactor Coolant System, Arrangement Plan (Unit 3)

(31 DEC 2004)

Oconee Nuclear Station UFSAR Figure 5-8 (Page 1 of 1)

Figure 5-8. Reactor Coolant System, Arrangement Elevation (Unit 3)

(31 DEC 2004)

Oconee Nuclear Station UFSAR Figure 5-9 (Page 1 of 1)

Figure 5-9. Reactor and Steam Temperatures versus Reactor Power.(Replacement Steam Generator)

(31 DEC 2004)

Oconee Nuclear Station UFSAR Figure 5-10 (Page 1 of 1)

Figure 5-10. Points of Stress Analysis for Reactor Vessel (31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 5-11 (Page 1 of 1)

Figure 5-11. Location of Replacement Steam Generator Weld (31 DEC 2004)

Oconee Nuclear Station UFSAR Figure 5-12 (Page 1 of 1)

Figure 5-12. Deleted Per 1991 Update (31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 5-13 (Page 1 of 1)

Figure 5-13. Deleted Per 1991 Update (31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 5-14 (Page 1 of 1)

Figure 5-14. Reactor Vessel Outline (Unit 1). (Shown with original reactor vessel head)

(31 DEC 2003)

Oconee Nuclear Station UFSAR Figure 5-15 (Page 1 of 1)

Figure 5-15. Reactor Vessel Outline (Unit 2). (Shown with original reactor vessel head)

(31 DEC 2003)

Oconee Nuclear Station UFSAR Figure 5-16 (Page 1 of 1)

Figure 5-16. Reactor Vessel Outline (Unit 3). (Shown with original reactor vessel head)

(31 DEC 2003)

Oconee Nuclear Station UFSAR Figure 5-17 (Page 1 of 1)

Figure 5-17. Reactor Coolant Controlled Leakage Pump (Unit 1)

(31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 5-18 (Page 1 of 1)

Figure 5-18. Reactor Coolant Punp Estimated Performance Characteristic (Unit 1)

(31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 5-19 (Page 1 of 1)

Figure 5-19. Reactor Coolant Pump (Units 2, 3)

(31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 5-20 (Page 1 of 1)

Figure 5-20. Reactor Coolant Pump Estimated Performance Characteristic (Units 2, 3)

(31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 5-21 (Page 1 of 4 Figure 5-21. Flow Diagram of Bingham Reactor Coolant Pump-Piping Diagram (31 DEC 2004)

Oconee Nuclear Station UFSAR Figure 5-21 (Page 2 of 4 (31 DEC 2004)

Oconee Nuclear Station UFSAR Figure 5-21 (Page 3 of 4 (31 DEC 2004)

Oconee Nuclear Station UFSAR Figure 5-21 (Page 4 of 4 (31 DEC 2004)

Oconee Nuclear Station UFSAR Figure 5-22 (Page 1 of 4)

Figure 5-22. Flow Diagram of Bingham Reactor Coolant Pump-Piping Diagram (31 DEC 2004)

Oconee Nuclear Station UFSAR Figure 5-22 (Page 2 of 4)

(31 DEC 2004)

Oconee Nuclear Station UFSAR Figure 5-22 (Page 3 of 4)

(31 DEC 2004)

Oconee Nuclear Station UFSAR Figure 5-22 (Page 4 of 4)

(31 DEC 2004)

Oconee Nuclear Station UFSAR Figure 5-23 (Page 1 of 1)

Figure 5-23. Code Allowables and Reinforcing Limits Nozzles and Bowls (31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 5-24 (Page 1 of 1)

Figure 5-24. Code Allowables, Cover (31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 5-25 (Page 1 of 1)

Figure 5-25. Steam Generator Outline (31 DEC 2004)

Oconee Nuclear Station UFSAR Figure 5-26 (Page 1 of 1)

Figure 5-26. Deleted Per 2004 Update (31 DEC 2004)

Oconee Nuclear Station UFSAR Figure 5-27 (Page 1 of 1)

Figure 5-27. Turbine Generator Speed Response Following Load Rejection (31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 5-28 (Page 1 of 1)

Figure 5-28. Pressurizer Outline (31 DEC 2000)

Oconee Nuclear Station UFSAR Figure 5-29 (Page 1 of 1)

Figure 5-29. Reactor Coolant System Arrangement Elevation (Typical)

(31 DEC 2008)

Oconee Nuclear Station UFSAR Figure 5-30 (Page 1 of 1)

Figure 5-30. Reactor Coolant System Arrangement - Plan (Typical)

(31 DEC 2003)

Oconee Nuclear Station UFSAR Figure 5-31 (Page 1 of 1)

Figure 5-31. Jet Impingement Load on the Replacement Steam Generator (31 DEC 2003)

Oconee Nuclear Station UFSAR Figure 5-32 (Page 1 of 1)

Figure 5-32. Deleted Per 2003 Update (31 DEC 2003)

Oconee Nuclear Station UFSAR Figure 5-33 (Page 1 of 1)

Figure 5-33. Replacement Reactor Vessel Closure Head Outline (31 DEC 2003)