J_~DUKE * . J. Ed Burchfield, Jr.

Vice President

"'e' ENERGY . Oconee Nuclear Station Duke Energy ON01VP I 7800 Rochester Hwy Seneca, SC 29672 ONS 2018-026 o: 864.873.3478 f: 864.873.5791 Ed.Burchfield@duke-energy.com Security-Related Information -Withhold from public I disclosure under 10 CFR 2.390 June 29, 2018 10 CFR 50.71(e)

A TIN: Document Control Desk 10 CFR 50.59(d)

U. S. Nuclear Regulatory Commission 10 CFR 54.37(b) 11555 Rockville Pike Rockville, MD 20852-2746

Subject:

Duke Energy Carolinas, LLC Oconee Nuclear Station, Units 1, 2, and 3 Docket Numbers 50-269, 50-270, and 50-287 Updated Final Safety Analysis Report, Revision 27 Pursuant to 10 CFR 50.71(e), and in accordance with 10 CFR 50.4, Duke Energy Carolinas, LLC (Duke Energy) hereby submits the Oconee Nuclear Station Updated Final Safety Analysis Report (UFSAR), Revision 27. The effective date of the UFSAR revision is December 31, 2017, as indicated at the bottom of each page. Changes made in Revision 27 are indicated by side bars.

The Oconee UFSAR, Revision 27, is being provided in a non-redacted version (for NRC internal use: and a redacted version (for NRC public use). The two compact disks (CDs) enclosed are labelled accordingly. Duke Energy has marked the appropriate information in the redacted version as "Security-Related Information Withheld Under 10 CFR 2.390" using the criteria provided by the NRC in SECY-04-191. The contents are in Adobe.Acrobat Portable Document Format (pdf).

As required by NRC guidance for electronic submissions, Attachment 1 provides a listing of the document components that comprise the enclosed CDs. Attachment 2 provides the List of Effective Pages (LOEP) for Tables and Figures. Attachment 3 provides insertion instructions for those receiving hardcopy distribution. Attachment 4 provides a listing of items removed in the 2017 UFSAR update. Attachment 5 provides the report of changes, tests, and experiments performed pursuant 10 CFR 50.59( d).

In addition, 10 CFR 54.37(b) requires that after the renewed license is issued, the UFSAR update must include any systems, structures, and components (SSCs) newly identified that would have been subject to an aging management review or evaluation of time-limited aging analysis in accordance with 10 CFR 54.21. The UFSAR update must describe how the effects

  • of aging are managed such that the intended function(s) in 10 CFR 54.4(b) will be effectively maintained during the period of extended operation. A review was performed to determine

ONS 2018-026 Document Control Desk June 29, 2018 Page 2 whether any newly-identified SSCs existed in support of submitting UFSAR Revision 27. As a result of this review, there are no newly identified SSCs for which aging management reviews or time-limited aging analyses would apply.

This submittal document contains no new or revised regulatory commitments. If you have any questions regarding the submittal, please contact Chris Wasik, Regulatory Affairs Manager, at (864) 873-5789.

I declare under penalty of perjury that the foregoing is true and correct. Executed on June 29, 2018.

Sincerely,

>E.) ~

J. Ed Burchfield, Jr.

Vice President Oconee Nuclear Station Attachments:

1. Document Components on CD
2. List of Effective Pages (LOEP) for Tables and Figures
3. Update Insertion Instructions (for hardcopy distribution only)
4. List of Removed Items
5. 10 CFR 50.59 Summary Report

Enclosures:

1. CD containing Non-Redacted Version of Oconee Nuclear Station Updated Final Safety Analysis Report, 2017 Update - Rev 27
2. CD containing Redacted Version of Oconee Nuclear Station Updated Final Safety Analysis Report, 2017 Update - Rev 27

r ONS 2018-026 Document Contro.l Desk June 29, 2018 Page 3 xc (with attachments):

Ms. Catherine Haney, Administrator, Region II (CD)

U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 Ms. Audrey Klett, Project Manager (CD)

(by electronic mail only)

Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-8G9A 11555 Rockville Pike Rockville, Maryland 20852 Mr. Eddy Crowe (hard copy)

NRC Senior Resident Inspector Oconee Nuclear Station

ONS 2018-026 Document Control Desk June 29, 2018 Attachment 1 Document Components on CD

Oconee Nuclear Station Document Components on CD File Name File Size (KB) 000 ONS UFSAR Title Page 40 001 ONS UFSAR Rev 27 Ch 01 TXT 265 002 ONS UFSAR Rev 27 Ch 01 Tables 120 003 ONS UFSAR Rev 27 Ch 01 Figures 3,963 004 ONS UFSAR Rev 27 Ch 02 TXT 804 005 ONS UFSAR Rev 27 Ch 02 Tables 4,190 006 ONS UFSAR Rev 27 Ch 02 Figures 6,601 007 ONS UFSAR Rev 27 Ch 03 TXT 1,977 008 ONS UFSAR Rev 27 Ch 03 Tables 1,643 009 ONS UFSAR Rev 27 Ch 03 Figures 5,874 010 ONS UFSAR Rev 27 Ch 04 TXT 817 011 ONS UFSAR Rev 27 Ch 04 Tables 943 012 ONS UFSAR Rev 27 Ch 04 Figures 1,093 013 ONS UFSAR Rev 27 Ch 05 TXT 849 014 ONS UFSAR Rev 27 Ch 05 Tables 1,292 015 ONS UFSAR Rev 27 Ch 05 Figures 3,941 016 ONS UFSAR Rev 27 Ch 06 TXT 733 017 ONS UFSAR Rev 27 Ch 06 Tables 1,902 018 ONS UFSAR Rev 27 Ch 06 Figures 4,951 019 ONS UFSAR Rev 27 Ch 07 TXT 1,308 020 ONS UFSAR Rev 27 Ch 07 Tables 271 021 ONSUFSARRev27Ch07Fiqures 8,392 022 ONS UFSAR Rev 27 Ch 08 TXT 445 023 ONS UFSAR Rev 27 Ch 08 Tables 337 024 ONS UFSAR Rev 27 Ch 08 Figures 1,439 025 ONS UFSAR Rev 27 Ch 09 TXT 1,241 026 ONS UFSAR Rev 27 Ch 09 Tables 1,075 027 ONS UFSAR Rev 27 Ch 09 Figures 7,084 028 ONS UFSAR Rev 27 Ch 10 TXT 483 029 ONS UFSAR Rev 27 Ch 10 Tables 100 030 ONS UFSAR Rev 27 Ch 10 Figures 8,006 031 ONS UFSAR Rev 27 Ch 11 TXT 630 032 ONS UFSAR Rev 27 Ch 11 Tables 469 033 ONS UFSAR Rev 27 Ch 11 Fiqures 239 034 ONS UFSAR Rev 27 Ch 12 TXT 337 035 ONS UFSAR Rev 27 Ch 12 Tables 211 036 ONS UFSAR Rev 27 Ch 13 TXT 489 037 ONS UFSAR Rev 27 Ch 13 Tables 77 038 ONS UFSAR Rev 27 Ch 13 Figures 362 039 ONS UFSAR Rev 27 Ch 14 TXT 353 040 ONS UFSAR Rev 27 Ch 14 Tables 133 041 ONS UFSAR Rev 27 Ch 15 TXT 1,497 042 ONS UFSAR Rev 27 Ch 15 Tables 2,148 043 ONS UFSAR Rev 27 Ch 15 Fiqures 5,666 044 ONS UFSAR Rev 27 Ch 16 TXT 84 045 ONS UFSAR Rev 27 Ch 17 TXT 78 046 ONS UFSAR Rev 27 Ch 18 TXT 671 047 ONS UFSAR Rev 27 Ch 18 Tables 79 Attachment 1 - Page 1 of 1

ONS 2018-026 Document Control Desk June 29, 2018 Attachment 2 List of Effective Pages

Oconee Nuclear Station Updated Final Safety Analysis Report 2017 List of Effective Pages Page Effective Date Chapter 1 1-i 31 DEC 2017 1-ii 31 DEC 2017 1-iii 31 DEC 2017 1.0-1 31 DEC 2017 1.0-2 31 DEC 2017 1.1-1 31 DEC 2017 1.1-2 31 DEC 2017.

1.2-1 31 DEC 2017 1.2-2 31 DEC 2017 1.2-3 31 DEC 2017 1.2-4 31 DEC 2017 1.3-1 31 DEC 2017 1.3-2 31 DEC 2017 1.4-1 31 DEC 2017 1.4-2 31 DEC 2017 Chapter 1 Tables rrable 1-1 (Paqe 1 of2) 31 DEC 2000 rrable 1-1 (Page 2 of 2) 31 DEC 2000 rrable 1-2 (Page 1 of 1) 31 DEC 2000

!Table 1-3 (Page 1 of 1) 31 DEC 2000 Chapter 1 Figures Figure 1-1 (Page 1 of 1) 31 DEC 2000 Figure 1-2 (Page 1 of 1 ) 31 DEC 2000 Figure 1-3 (Page 1 of 1) 31 DEC 2000 Figure 1-4 (Page 1 of 1) 31 DEC 2000 Figure 1-5 (Page 1 of 1) 31 DEC 2004 Figure 1-6 (Page 1 of 1) 31 DEC 2000 Figure 1-7 (Page 1 of 1) 31 DEC 2007 Figure 1-8 (Page 1 of 1) 31 DEC 2017 Figure 1-9 (Page 1 of 1 ) 31 DEC 2000 Chapter 2 2-i 31 DEC 2017 2-ii 31 DEC 2017 2-iii 31 DEC 2017 2-iv 31 DEC 2017 2-v 31 DEC 2017

!2-vi 31 DEC 2017 2-vii 31 DEC 2017 Attachment 2 - Page 1 of 55

Oconee Nuclear Station Updated Final Safety Analysis Report 2017 List of Effective Pages Page Effective Date 2-viii 31 DEC 2017 2-ix 31 DEC 2017 12-x 31 DEC 2017 12-xi 31 DEC 2017 12-xii 31 DEC 2017 2.0-1 31 DEC 2017 12.0-2 31 DEC 2017 12.1-1 31 DEC 2017 2.1-2 31 DEC 2017 2.1-3 31 DEC 2017 12.1-4 31 DEC 2017 12.2-1 31 DEC 2017 12.2-2 31 DEC 2017 12.3-1 31 DEC 2017 12.3-2 31 DEC 2017 2.3-3 31 DEC 2017 12.3-4 31 DEC 2017 12.3-5 31 DEC 2017 2.3-6 31 DEC 2017 2.3-7 31 DEC 2017 2.3-8 31 DEC 2017 12.3-9 31 DEC 2017 12.3-10 31 DEC 2017 12.3-11 31 DEC 2017 12.3-12 31 DEC 2017 2.3-13 31 DEC 2017 2.3-14 31 DEC 2017 12.3-15 31 DEC 2017 2.3-16 31 DEC 2017 2.3-17 31 DEC 2017 2.3-18 31 DEC 2017 2.3-19 31 DEC 2017 2.3-20 31 DEC 2017 2.3-21 31 DEC 2017 2.3-22 31 DEC 2017 2.3-23 31 DEC 2017 2.3-24 31 DEC 2017 2.4-1 31 DEC 2017 2.4-2 31 DEC 2017 2.4-3 31 DEC 2017 2.4-4 31 DEC 2017 12.4-5 31 DEC 2017 Attachment 2 - Page 2 of 55

Oconee Nuclear Station Updated Final Safety Analysis Report 2017 List of Effective Pages Page Effective Date 2.4-6 31 DEC 2017 l2.4-7 31 DEC 2017 2.4-8 31 DEC 2017 12.4-9 31 DEC 2017 2.4-10 31 DEC 2017 2.5-1 31 DEC 2017 2.5-2 31 DEC 2017 2.5-3 31 DEC 2017 2.5-4 31 DEC 2017 l2.5-5 31 DEC 2017 2.5-6 31 DEC 2017 2.5-7 31 DEC 2017 12.5-8 31 DEC 2017 2.5-9 31 DEC 2017 2.5-10 31 DEC 2017 2.5-11 31 DEC 2017 2.5-12 31 DEC 2017 12.5-13 31 DEC 2017 12.5-14 31 DEC 2017 2.5-15 31 DEC 2017 2.5-16 31 DEC 2017 12.5-17 31 DEC 2017 12.5-18 31 DEC 2017 Chapter 2 Tables rrable 2-1 (Page 1 of 1) 31 DEC 2000 Table 2-2 (Page 1 of 1) 31 DEC 2000 Table 2-3 (Page 1 of 1) 31 DEC 2000 Table 2-4 (Page 1 of 1) 31 DEC 2000 Table 2-5 (Page 1 of 1) 31 DEC 2000 Table 2-6 (Page 1 of 1) 31 DEC 2000 Table 2-7 (Paqe 1 of 1) 31 DEC 2008 Table 2-8 (Page 1 of 1) 31 DEC 2008 Table 2-9 (Paqe 1 of 1) 31 DEC 2008 Table 2-10 (Paqe 1 of 1) 31 DEC 2008 Table 2-11 (Page 1 of 1) 31 DEC 2008 Table 2-12 (Page 1 of 1) 31 DEC 2008 Table 2-13 (Page 1 of 1) 31 DEC 2008 Table 2-14 (Page 1 of 1) 31 DEC 2008 Table 2-15 (Page 1 of 1) 31 DEC 2008 Table 2-16 (Page 1 of 1) 31 DEC 2008 Table 2-17 (Page 1 of 1) 31 DEC 2008 Attachment 2 - Page 3 of 55

Oconee Nuclear Station Updated Final Safety Analysis Report 2017 List of Effective Pages Page Effective Date ITable 2-18 (Paqe 1 of 1) 31 DEC 2008 ITable 2-19 (Paqe 1 of 1) 31 DEC 2008 ITable 2-20 (Paqe 1 of 1) 31 DEC 2008 ITable 2-21 (Page 1 of 1) 31 DEC 2008 ITable 2-22 (Page 1 of 1) 31 DEC 2008 ITable 2-23 (Page 1 of 1) 31 DEC 2008 ITable 2-24 (Paqe 1 of 8) 31 DEC 2008 ITable 2-24 (Page 2 of 8) 31 DEC 2008 ITable 2-24 (Page 3 of 8) 31 DEC 2008 ITable 2-24 (Page 4 of 8) 31 DEC 2008 ITable 2-24 (Page 5 of 8) 31 DEC 2008 ITable 2-24 (Paqe 6 of 8) 31 DEC 2008 ITable 2-24 (Paqe 7 of 8) 31 DEC 2008

!Table 2-24 (Paqe 8 of 8) 31 DEC 2008 ITable 2-25 (Page 1 of 8) 31 DEC 2008 ITable 2-25 (Page 2 of 8) 31 DEC 2008 ITable 2-25 (Paqe 3 of 8) 31 DEC 2008 ITable 2-25 (Page 4 of 8) 31 DEC 2008 ITable 2-25 (Page 5 of 8) 31 DEC 2008 Table 2-25 (Page 6 of 8) 31 DEC 2008 Table 2-25 (Page 7 of 8) 31 DEC 2008 Table 2-25 (Page 8 of 8) 31 DEC 2008 Table 2-26 (Paqe 1 of 6) 31 DEC 2008 Table 2-26 (Paqe 2 of 6) 31 DEC 2008 Table 2-26 (Page 3 of 6) 31 DEC 2008 Table 2-26 (Paqe 4 of 6) 31 DEC 2008 ITable 2-26 (Paqe 5 of 6) 31 DEC 2008 ITable 2-26 (Paqe 6 of 6) 31 DEC 2008 ITable 2-27 (Paqe 1 of 14) 31 DEC 2008 ITable 2-27 (Paqe 2 of 14) 31 DEC 2008 ITable 2-27 (Paqe 3 of 14) 31 DEC 2008

!Table 2-27 (Page 4 of 14) 31 DEC 2008 ITable 2-27 (Page 5 of 14) 31 DEC 2008 Table 2-27 (Page 6 of 14) 31 DEC 2008 ITable 2-27 (Page 7 of 14) 31 DEC 2008 ITable 2-27 (Page 8 of 14) 31 DEC 2008 ITable 2-27 (Paqe 9 of 14) 31 DEC 2008 ITable 2-27 (Paqe 1O of 14) 31 DEC 2008 ITable 2-27 (Page 11 of 14) 31 DEC 2008

!Table 2-27 (Page 12 of 14) 31 DEC 2008 IT able 2-27 (Page 13 of 14) 31 DEC 2008 ITable 2-27 (Paqe 14 of 14) 31 DEC 2008 Attachment 2 - Page 4 of 55

Oconee Nuclear Station Updated Final Safety Analysis Report 2017 List of Effective Pages Page Effective Date Table 2-28 (Paqe 1 of 1) 31 DEC 2008 Table 2-29 (Page 1 of 1) 31 DEC 2008 Table 2-30 (Page 1 of 2) 31 DEC 2008 Table 2-30 (Page 2 of 2) 31 DEC 2008 Table 2-31 (Page 1 of 2) 31 DEC 2008 Table 2-31 (Page 2 of 2) 31 DEC 2008 Table 2-32 (Page 1 of 1) 31 DEC 2008 Table 2-33 (Page 1 of 2) 31 DEC 2008 Table 2-33 (Page 2 of 2) 31 DEC 2008 Table 2-34 (Page 1 of 1) 31 DEC 2008 Table 2-35 (Paqe 1 of 1) 31 DEC 2008 Table 2-36 (Page 1 of 1) 31 DEC 2008 Table 2-37 (Page 1 of 2) 31 DEC 2008 Table 2-37 (PaQe 2 of 2) 31 DEC 2008 Table 2-38 (Page 1 of 1) 31 DEC 2008 Table 2-39 (Page 1 of 4) 31 DEC 2008 Table 2-39 (Page 2 of 4) 31 DEC 2008 Table 2-39 (Page 3 of 4) 31 DEC 2008 Table 2-39 (Page 4 of 4) 31 DEC 2008 Table 2 2-43 (Page 1 of 1) 31 DEC 2008 Table 2-44 (Page 1 of 1) 31 DEC 2008 Table 2 2-92 (Page 1 of 3) 31 DEC 2008 Table 2 2-92 (Paqe 2 of 3) 31 DEC 2008 Table 2 2-92 (Paqe 3 of 3) 31 DEC 2008 Table 2-93 (Paqe 1 of 1) 31 DEC 2000 Table 2-94 (Paqe 1 of 6) 31 DEC 2000 Table 2-94 (Page 2 of 6) 31 DEC 2000 Table 2-94 (PaQe 3 of 6) 31 DEC 2000 Table 2-94 (Page 4 of 6) 31 DEC 2000 Table 2-94 (Page 5 of 6) 31 DEC 2000 Table 2-94 (Page 6 of 6) 31 DEC 2000 Table 2-95 (Page 1 of 1) 31 DEC 2000 Table 2-96 (Page 1 of 1) 31 DEC 2000 Chapter 2 Figures Figure 2-1 (Page 1 of 1) 31 DEC 2000 Figure 2-2 (Page 1 of 1) 31 DEC 2000 FiQure 2-3 (Paqe 1 of 1) 31 DEC 2000 Fiqure 2-4 (PaQe 1 of 1) 31 DEC 2000 Figure 2-5 (Page 1 of 1) 31 DEC 2011 Figure 2-6 (Page 1 of 1)

  • 31 DEC 2000 Figure 2-7 (Page 1 of 1) 31 DEC 2008 Attachment 2 - Page 5 of 55

Oconee Nuclear Station Updated Final Safety Analysis Report 2017 List of Effective Pages Page Effective Date Figure 2-8 (Page 1 of 1) 31 DEC 2008 Figure 2-9 (Page 1 of 1) 31 DEC 2008 Figure 2-1 O (Page 1 of 1) 31 DEC 2008 Figure 2-11 (Page 1 of 2) 31 DEC 2008 Figure 2-11 (Page 2 of 2) 31 DEC 2008 Figure 2-12 (Page 1 of 2) 31 DEC 2008 Figure 2-12 (Page 2 of 2) 31 DEC 2008 Figure 2-13 (Page 1 of 1 ) 31 DEC 2008 Figure 2-14 (Paqe 1 of 1) 31 DEC 2008

  • Figure 2-15 (Page 1 of 1) 31 DEC 2008 Figure 2-16 (Page 1 of 1) 31 DEC 2008 Figure 2-17 (Page 1 of 1) 31 DEC 2008 Figure 2-18 (Page 1 of 1) 31 DEC 2008 Figure 2-19 (Page 1 of 1) 31 DEC 2008 Figure 2-20 (Page 1 of 1) 31 DEC 2008 Figure 2-21 (Page 1 of 1) 31 DEC 2008 Figure 2-22 (Page 1 of 1) 31 DEC 2008 Figure 2-23 (Page 1 of 1) 31 DEC 2008 Figure 2-24 (Page 1 of 1) 31 DEC 2008 Figure 2-25 (Page 1 of 1 ) 31 DEC 2008 Figure 2-26 (Page 1 of 1) 31 DEC 2008 Figure 2-27 (Page 1 of 1) 31 DEC 2008 Figure 2-28 (Page 1 of 1) 31 DEC 2008 Fiqure 2-29 (Page 1 of 1) 31 DEC 2008 Figure 2-30 (Page 1 of 1) 31 DEC 2008 Figure 2-31 (Page 1 of 1) 31 DEC 2008 FiQure 2-32 (Page 1 of 1) 31 DEC 2008 Figure 2-33 (Page 1 of 1) 31 DEC 2008 Figure 2-34 (Page 1 of 1) 31 DEC 2008 Figure 2 2-36 (Page 1 of 1) 31 DEC 2008 Figure 2-37 (Page 1 of 1) 31 DEC 2008 Figure 2-38 (Page 1 of 1) 31 DEC 2008 Figure 2-39 (Page 1 of 1) 31 DEC 2000 Figure 2-40 (Page 1 of 1) 31 DEC 2000 Figure 2-41 (Page 1 of 1) 31 DEC 2000 Figure 2-42 (Page 1 of 1) 31 DEC 2000 Figure 2-43 (Page 1 of 1) 31 DEC 2000 Figure 2-44 (Page 1 of 1) 31 DEC 2000 Figure 2-45 (Page 1 of 1) 31 DEC 2000 Figure 2-46 (Page 1 of 1) 31 DEC 2000 Figure 2-47 (Page 1 of 1) 31 DEC 2000 Figure 2-48 (Page 1 of 1 ) 31 DEC 2000 Attachment 2 - Page 6 of 55

Oconee Nuclear Station Updated Final Safety Analysis Report 2017 List of Effective Pages Page Effective Date Figure 2-49 (Page 1 of 1) 31 DEC 2000 Figure 2-50 (Page 1 of 1) 31 DEC 2000 Figure 2-51 (Paqe 1 of 1) 31 DEC 2000 Fiqure 2-52 (Page 1 of 1) 31 DEC 2000 Figure 2-53 (Page 1 of 1) 31 DEC 2000 Figure 2-54 (Page 1 of 1) 31 DEC 2000 Figure 2-55 (Page 1 of 1) 31 DEC 2000 Figure 2-56 (Page 1 of 1) 31 DEC 2000 Figure- 2-57 (Page 1 of 1) 31 DEC 2000 Figure 2-58 (Page 1 of 1) 31 DEC 2000 Figure 2-59 (Page 1 of 1) 31 DEC 2000 Figure 2-60 (Page 1 of 1) 31 DEC 2000 Figure 2-61 (Page 1 of 1) 31 DEC 2000 Figure 2-62 (Page 1 of 1) 31 DEC 2000 Figure 2-63 (Page 1 of 1) 31 DEC 2000 Figure 2-64 (Page 1 of 1) 31 DEC 2000 Figure 2-65 (Page 1 of 1) 31 DEC 2000 Figure 2-66 (Page 1 of 1) 31 DEC 2000 Figure 2-67 (Page 1 of 1) 31 DEC 2000 Figure 2-68 (Page 1 of 1) 31 DEC 2000 Figure 2-69 (Page 1 of 1) 31 DEC 2000 Figure 2-70 (Page 1 of 1 ) 31 DEC 2000 Figure 2-71 (Page 1 of 1) 31 DEC 2000 Figure 2-72 (Page 1 of 1) 31 DEC 2000 Figure 2-73 (Page 1 of 1) 31 DEC 2000 Figure 2-7 4 (Paqe 1 of 1) 31 DEC 2000 Figure 2-75 (Page 1 of 1) 31 DEC 2000 Figure 2-76 (Paqe 1 of 1) 31 DEC 2000 Figure 2-77 (Page 1 of 1) 31 DEC 2000 Figure 2-78 (Page 1 of 1) 31 DEC 2000 Figure 2-79 (Page 1 of 1) 31 DEC 2000 Figure 2-80 (Page 1 of 1) 31 DEC 2000 Figure 2-81 (Paqe 1 of 1) 31 DEC 2000 Figure 2-82 (Page 1 of 1) 31 DEC 2000 Figure 2-83 (Page 1 of 1) 31 DEC 2000 Figure 2-84 (Page 1 of 1) 31 DEC 2000 Figure 2-85 (Page 1 of 1 ) 31 DEC 2000 Fiqure 2-86 (Page 1 of 1) 31 DEC 2000 Figure 2-87 (Page 1 of 1) 31 DEC 2000 Figure 2-88 (Page 1 of 1 ) 31 DEC 2000 Figure 2-89 (Page 1 of 1 ) 31 DEC 2000 Figure 2-90 (Page 1 of 1) 31 DEC 2000 Attachment 2 - Page 7 of 55

Oconee Nuclear Station Updated Final Safety Analysis Report 2017 List of Effective Pages Page Effective Date Fiqure 2-91 (Paqe 1 of 1) 31 DEC 2000 Figure 2-92 (Page 1 of 1) 31 DEC 2000 Figure 2-93 (Page 1 of 1) 31 DEC 2000 Figure 2-94 (Paqe 1 of 1) 31 DEC 2000 Figure 2-95 (Page 1 of 1) 31 DEC 2000 Figure 2-96 (Page 1 of 1) 31 DEC 2000 Figure 2-97 (Page 1 of 1) 31 DEC 2000 Figure 2-98 (Page 1 of 1) 31 DEC 2000 Figure 2-99 (Page 1 of 1) 31 DEC 2000 Figure 2-100 (Page 1 of 1) 31 DEC 2000 Figure 2-101 (Page 1 of 1) 31 DEC 2000 Figure 2-102 (Page 1 of 1) 31 DEC 2000 Figure 2-103 (Page 1 of 1) 31 DEC 2000 Figure 2-104 (Page 1 of 1) 31 DEC 2000 Figure 2-105 (Page 1 of 1) 31 DEC 2000 Figure 2-106 (Page 1 of 1) 31 DEC 2000 Figure 2-107 (Page 1 of 1) 31 DEC 2000 Fiqure 2-108 (Page 1 of 1) 31 DEC 2000 Figure 2-109 (Page 1 of 1) 31 DEC 2000 Figure 2-110 (Page 1 of 1) 31 DEC 2000 Figure 2-111 (Page 1 of 1) 31 DEC 2000 Figure 2-112 (Page 1 of 1) 31 DEC 2000 Fiqure 2-113 (Paqe 1 of 1) 31 DEC 2000 Figure 2-114 (Page 1 of 1) 31 DEC 2000 Figure 2-115 (Page 1 of 1) 31 DEC 2000 Figure 2-116 (Page 1 of 1) 31 DEC 2000 Figure 2-117 (Page 1 of 1) 31 DEC 2000 Figure 2-118 (Page 1 of 1) 31 DEC 2000 Chapter 3 3-i 31 DEC 2017 3-ii 31 DEC 2017 3-iii 31 DEC 2017 3-iv 31 DEC 2017 3-v 31 DEC 2017 3-vi 31 DEC 2017 3-vii 31 DEC 2017 3-viii 31 DEC 2017 3-ix 31 DEC 2017 3-x 31 DEC 2017 3-xi 31 DEC 2017 3-xii 31 DEC 2017 Attachment 2 - Page 8 of 55

  • Oconee Nuclear Station Updated Final Safety Analysis Report 2017 List of Effective Pages Page Effective Date 3.0-1 31 DEC 2017 3.0-2 31 DEC 2017 3.1-1 31 DEC 2017 3.1-2 31 DEC 2017 3.1-3 31 DEC 2017 3.1-4 31 DEC 2017 3.1-5 31 DEC 2017 3.1-6 31 DEC 2017 3.1-7 31 DEC 2017 3.1-8 31 DEC 2017 3.1-9 31 DEC 2017 3.1-10 31 DEC 2017 3.1-11 31 DEC 2017 3.1-12 31 DEC 2017 3.1-13 31 DEC 2017 3.1-14 31 DEC 2017 3.1-15 31 DEC 2017 3.1-16 31 DEC 2017 3.1-17 31 DEC 2017 3.1-18 31 DEC 2017 3.1-19 31 DEC 2017 3.1-20 31 DEC 2017 3.1-21 31 DEC 2017 3.1-22 31 DEC 2017 3.1-23 31 DEC 2017 3.1-24 31 DEC 2017 3.1-25 31 DEC 2017 3.1-26 31 DEC 2017 3.1-27 31 DEC 2017 3.1-28 31 DEC 2017 3.1-29 31 DEC 2017 3.1-30 31 DEC 2017 3.1-31 31 DEC 2017 3.1-32 31 DEC 2017 3.1-33 31 DEC 2017 3.1-34 31 DEC 2017 3.2-1 31 DEC 2017 3.2-2 31 DEC 2017 3.2-3 31 DEC 2017 3.2-4 31 DEC 2017 3.2-5 31 DEC 2017 3.2-6 31 DEC 2017 Attachment 2 - Page 9 of 55

Oconee Nuclear Station Updated Final Safety Analysis Report 2017 List of Effective Pages Page Effective Date 3.2-7 31 DEC 2017 3.2-8 31 DEC 2017 3.3-1 31 DEC 2017 3.3-2 31 DEC 2017 3.4-1 31 DEC 2017 3.4-2 31 DEC 2017 3.4-3 31 DEC 2017 3.4-4 31 DEC 2017 3.5-1 31 DEC 2017 3.5-2 31 DEC 2017 3.5-3 31 DEC 2017 3.5-4 31 DEC 2017 3.5-5 31 DEC 2017 3.5-6 31 DEC 2017 3.5-7 31 DEC 2017 3.5-8 31 DEC 2017 3.6-1 31 DEC 2017 3.6-2 31 DEC 2017 3.7-1 31 DEC 2017 3.7-2 31 DEC 2017 3.7-3 31 DEC 2017 3.7-4 31 DEC 2017 3.7-5 31 DEC 2017 3.7-6 31 DEC 2017 3.7-7 31 DEC 2017 3.7-8 31 DEC 2017 3.7-9 31 DEC 2017 3.7-10 31 DEC 2017 3.7-11 31 DEC 2017 3.7-12 31 DEC 2017 3.7-13 31 DEC 2017 3.7-14 31 DEC 2017 3.7-15 31 DEC 2017 3.7-16 31 DEC 2017 3.8-1 31 DEC 2017 3.8-2 31 DEC 2017 3.8-3 31 DEC 2017 3.8-4 31 DEC 2017 3.8-5 31 DEC 2017 3.8-6 31 DEC 2017 3.8-7 31 DEC 2017 3.8-8 31 DEC 2017 Attachment 2 - Page 10 of 55

Oconee Nuclear Station Updated Final Safety Analysis Report 2017 List of Effective Pages Page Effective Date 3.8-9 31 DEC 2017 3.8-10 31 DEC 2017 3.8-11 31 DEC 2017 3.8~12 31 DEC 2017 3.8-13 31 DEC 2017 3.8-14 31 DEC 2017 3.8-15 31 DEC 2017 3.8-16 31 DEC 2017 3.8-17 31 DEC 2017 3.8-18 31 DEC 2017 3.8-19 31 DEC 2017 3.8-20 31 DEC 2017 3.8-21 31 DEC 2017 3.8-22 31 DEC 2017 3.8-23 31 DEC 2017 3.8-24 31 DEC 2017 3.8-25 31 DEC 2017 3.8-26 31 DEC 2017 3.8-27 31 DEC 2017 3.8-28 31 DEC 2017 3.8-29 31 DEC 2017 3.8-30 31 DEC 2017 3.8-31 31 DEC 2017 3.8-32 31 DEC 2017 3.8-33 31 DEC 2017 3.8-34 31 DEC 2017 3.8-35 31 DEC 2017 3.8-36 31 DEC 2017 3.8-37 31 DEC 2017 3.8-38 31 DEC 2017 3.8-39 31 DEC 2017 3.8-40 31 DEC 2017 3.8-41 31 DEC 2017 3.8-42 31 DEC 2017 3.8-43 31 DEC 2017 3.8-44 31 DEC 2017 3.8-45 31 DEC 2017 3.8-46 31 DEC 2017 3.8-47 31 DEC 2017 3.8-48 31 DEC 2017 3.8-49 31 DEC 2017 3.8-50 31 DEC 2017 Attachment 2 - Page 11 of 55

Oconee Nuclear Station Updated Final Safety Analysis Report 2017 List of Effective Pages Page Effective Date 3.8-51 31 DEC 2017 3.8-52 31 DEC 2017 3.8-53 31 DEC 2017 3.8-54 31 DEC 2017 3.8-55 31 DEC 2017 3.8-56 31 DEC 2017 3.8-57 31 DEC 2017 3.8-58 31 DEC 2017 3.8-59 31 DEC 2017 3.8-60 31 DEC 2017 3.8-61 31 DEC 2017 3.8-62 31 DEC 2017 3.8-63 31 DEC 2017 3.8-64 31 DEC 2017 3.8-65 31 DEC 2017 3.8-66 31 DEC 2017 3.8-67 31 DEC 2017 3.8-68 31 DEC 2017 3.8-69 31 DEC 2017 3.8-70 31 DEC 2017 3.8-71 31 DEC 2017 3.8-72 31 DEC 2017 3.8-73 31 DEC 2017 3.8-74 31 DEC 2017 3.8-75 31 DEC 2017 3.8-76 31 DEC 2017 3.9-1 31 DEC 2017 3.9-2 31 DEC 2017 3.9-3 31 DEC 2017 3.9-4 31 DEC 2017 3.9-5 31 DEC 2017 3.9-6 31 DEC 2017 3.9-7 31 DEC 2017 3.9-8 31 DEC 2017 3.9-9 31 DEC 2017 3.9-10 31 DEC 2017 3.9-11 31 DEC 2017 3.9-12 31 DEC 2017 3.9-13 31 DEC 2017 3.9-14 31 DEC 2017 3.9-15 31 DEC 2017 3.9-16 31 DEC 2017 Attachment 2 - Page 12 of 55

Oconee Nuclear Station Updated Final Safety Analysis Report 2017 List of Effective Pages Page Effective Date 3.9-17 31 DEC 2017 3.9-18 31 DEC 2017 3.9-19 31 DEC 2017 3.9-20 31 DEC 2017 3.9-21 31 DEC 2017 3.9-22 31 DEC 2017 3.9-23 31 DEC 2017 3.9-24 31 DEC 2017 3.9-25 31 DEC 2017 3.9-26 31 DEC 2017 3.9-27 31 DEC 2017 3.9-28 31 DEC 2017 3.10-1 31 DEC 2017 3.10-2 31 DEC 2017 3.11-1 31 DEC 2017 3.11-2 31 DEC 2017 3.12-1 31 DEC 2017 3.12-2 31 DEC 2017 3.13-1 31 DEC 2017 3.13-2 31 DEC 2017 Chapter 3 Tables

!Table 3-1 (PaQe 1 of 1) 31 DEC 2004

!Table 3-2 (PaQe 1 of 6) 31 DEC 2014

!Table 3-2 (Page 2 of 6) 31 DEC 2014 Table 3-2 (Page 3 of 6) 31 DEC 2014 Table 3-2 (Page 4 of 6) 31 DEC 2014 Table 3-2 (Page 5 of 6) 31 DEC 2014 Table 3-2 (Paqe 6 of 6) 31 DEC 2014 Table 3-3 (Page 1 of 1) 31 DEC 2004 Table 3-4 (Page 1 of 1) 31 DEC 2000 Table 3-5 (Paqe 1 of 1) 31 DEC 2014 Table 3-6 (Page 1 of 2) 31 DEC 2003 Table 3-6 (Page 2 of 2) 31 DEC 2003 Table 3-7 (Paqe 1 of 1) 31 DEC 2000 Table 3-8 (Page 1 of 1) 31 DEC 2000 Table 3-9 (Page 1 of 2) 31 DEC 2000 Table 3-9 (Page 2 of 2) 31 DEC 2000 Table 3-10 (Page 1 of 1) 31 DEC 2000 Table 3-11 (Page 1 of 1) 31 DEC 2000 Table 3-12 (Paqe 1 of 5) 31 DEC 2000 Table 3-12 (Page 2 of 5) 31 DEC 2000 Attachment 2 - Page 13 of 55

Oconee Nuclear Station Updated Final Safety Analysis Report 2017 List of Effective Pages Page Effective Date rrable 3-12 (Paqe 3 of 5) 31 DEC 2000 rrable 3-12 (Paqe 4 of 5) 31 DEC 2000 rrable 3-12 (Page 5 of 5) 31 DEC 2000 rrable 3-13 (Page 1 of 1) 31 DEC 2000 ITable 3-14 (Page 1 of 2) 31 DEC 2000 rrable 3-14 (Page 2 of 2) 31 DEC 2000 Table 3-15 (Page 1 of 1) 31 DEC 2000 Table 3-16 (Page 1 of 1) 31 DEC 2003 Table 3-17 (Page 1 of 1) 31 DEC 2000 Table 3-18 (Page 1 of 1) 31 DEC 2003 Table 3-19 (Paqe 1 of 1) 31 DEC 2003 Table 3-20 (Page 1 of 1) 31 DEC 2003 Table 3-21 (Page 1 of 1) 31 DEC 2003 Table 3-22 (Page 1 of 1) 31 DEC 2000 Table 3-23 (Paqe 1 of 1) 31 DEC 2009 Table 3-24 (Paqe 1 of 1) 31 DEC 2000 Table 3-25 (Page 1 of 1) 31 DEC 2000 Table 3-26 (Page 1 of 1) 31 DEC 2000 Table 3 3-67 (Page 1 of 3) 31 DEC 2000 Table 3-27 -*3-67 (Page 2 of 3) 31 DEC 2000 Table 3 3-67 (Page 3 of 3) 31 DEC 2000 Table 3-68 (Page 1 of 8) 31 DEC 2017 Table 3-68 (Paqe 2 of 8) 31 DEC 2017 Table 3-68 (Page 3 of 8) 31 DEC 2017 Table 3-68 (Page 4 of 8) 31 DEC 2017 iTable 3-68 (Paqe 5 of 8) 31 DEC 2017 iTable 3-68 (Page 6 of 8) 31 DEC 2017 iTable 3-68 (Page 7 of 8) 31 DEC 2017 iTable 3-68 (Paqe 8 of 8) 31 DEC 2017 Chapter 3 Figures Figure 3-1 (Page 1 of 1) 31 DEC 2000 Figure 3-2 (Page 1 of 1) 31 DEC 2000 Figure 3-3 (Page 1 of 1) 31 DEC 2000 Fiqure 3-4 (Paqe 1 of 1) 31 DEC 2000 Figure 3-5 (Page 1 of 1) 31 DEC 2000 Figure 3-6 (Page 1 of 1) 31 DEC 2000 Figure 3-7 (Page 1 of 1) 31 DEC 2000 Fiqure 3-8 (Paqe 1 of 1) 31 DEC 2000 Figure 3-9 (Page 1 of 1) 31 DEC 2006 Figure 3-10 (Page 1 of 1) 31 DEC 2006 Figure 3-11 (Page 1 of 1) 31 DEC 2006 Attachment 2 - Page 14 of 55

Oconee Nuclear Station Updated Final Safety Analysis Report 2017 List of Effective Pages Page Effective Date Figure 3-12 (Page 1 of 1) 31 DEC 2006 Figure 3-13 (Page 1 of 1) 31 DEC 2006 Figure 3-14 (Page 1 of 1) 31 DEC 2006 Figure 3-15 (Page 1 of 1) 31 DEC 2006 Figure 3-16 (Page 1 of 1) 31 DEC 2000 Figure 3-17 (Page 1 of 1) 31 DEC 2000 Figure 3-18 (Page 1 of 1) 31 DEC 2000 Figure 3-19 (Page 1 of 3) 31 DEC 2000 Figure 3-19 (Page 2 of 3) 31 DEC 2000 Figure 3-19 (Page 3 of 3) 31 DEC 2000 Figure 3-20 (Page 1 of 1) 31 DEC 2011 Figure 3-21 (Page 1 of 1) 31 DEC 2000 Figure 3-22 (Page 1 of 1) 31 DEC 2000 Figure 3-23 (Page 1 of 1) 31 DEC 2000 Figure 3-24 (Page 1 of 1) 31 DEC 2000 Figure 3-25 (Page 1 of 4) 31 DEC 2000 Figure 3-25 (Page 2 of 4) 31 DEC 2000 Figure 3-25 (Page 3 of 4) 31 DEC 2000 Figure 3-25 (Page 4 of 4) 31 DEC 2000 Figure 3-26 (Page 1 of 6) 31 DEC 2000 Figure 3-26 (Page 2 of 6) 31 DEC 2000 Figure 3-26 (Page 3 of 6) 31 DEC 2000 Figure 3-26 (Page 4 of 6) 31 DEC 2000 Figure 3-26 (Page 5 of 6) 31 DEC 2000 Figure 3-26 (Page 6 of 6) 31 DEC 2000 Figure 3-27 (Page 1 of 1) 31 DEC 2000 Figure 3-28 (Page 1 of 2) 31 DEC 2000 Figure 3-28 (Page 2 of 2) 31 DEC 2000 Figure 3-29 (Page 1 of 1) 31 DEC 2000 Figure 3-30 (Page 1 of 1) 31 DEC 2000 Figure 3-31 (Page 1 of 1) 31 DEC 2000 Figure 3-32 (Page 1 of 1) 31 DEC 2000 Figure 3-33 (Page 1 of 1) 31 DEC 2000 Figure 3-34 (Page 1 of 1) 31 DEC 2000 Figure 3-35 (Page 1 of 1) 31 DEC 2000 Figure 3-36 (Page 1 of 1) 31 DEC 2000 Figure 3-37 (Page 1 of 4) 31 DEC 2000 Figure 3-37 (Page 2 of 4} 31 DEC 2000 Figure 3-37 (Page 3 of 4) 31 DEC 2000 Figure 3-37 (Page 4 of 4) 31 DEC 2000 Figure 3-38 (Page 1 of 1) 31 DEC 2000 Figure 3 3-51 (Page 1 of 1) 31 DEC 2000 Attachment 2 - Page 15 of 55

Oconee Nuclear Station Updated Final Safety Analysis Report 2017 List of Effective Pages Page Effective Date Figure 3-52 (Page 1 of 1) 31 DEC 2003 Figure 3 3-56 (Page 1 of 1) 31 DEC 2003 Fiqure 3-57 (Page 1 of 1 ) 31 DEC 2000 Figure 3-58 (Page 1 of 1) 31 DEC 2000 Figure 3-59 (Page 1 of 1 ) 31 DEC 2000 Figure 3-60 (Page 1 of 1) 31 DEC 2000 Chapter 4 4-i 31 DEC 2017 4-ii 31 DEC 2017 4-iii 31 DEC 2017 4-iv 31 DEC 2017 4-v 31 DEC 2017 4-vi 31 DEC 2017 4-vii 31 DEC 2017 4.0-1 31 DEC 2017 4.0-2 31 DEC 2017 r4.1-1 31 DEC 2017 14.1-2 31 DEC 2017 14.2-1 31 DEC 2017 14.2-2 31 DEC 2017 4.2-3 31 DEC 2017 4.2-4 31 DEC 2017 4.2-5 31 DEC 2017 14.2-6 31 DEC 2017 14.2-7 31 DEC 2017 4.2-8 31 DEC 2017 4.2-9 31 DEC 2017 4.2-10 31 DEC 2017 4.2-11 31 DEC 2017 14.2-12 31 DEC 2017 4.2-13 31 DEC 2017 4.2-14 31 DEC 2017 4.3-1 31 DEC 2017 4.3-2 31 DEC 2017 4.3-3 31 DEC 2017 4.3-4 31 DEC 2017 4.3-5 31 DEC 2017 14.3-6 31 DEC 2017 14.3-7 31 DEC 2017 14.3-8 31 DEC 2017 4.3-9 31 DEC 2017 Attachment 2 - Page 16 of 55

Oconee Nuclear Station Updated Final Safety Analysis Report 2017 List of Effective- Pages Page Effective Date 4.3-10 31 DEC 2017 4.3-11 t31 DEC 2017 4.3-12 31 DEC 2017 4.3-13 31 DEC 2017 4.3-14 31 DEC 2017 4.3-15 31 DEC 2017 4.3-16 31 DEC 2017 4.3-17 31 DEC 2017 4.3-18 31 DEC 2017 4.3-19 31 DEC 2017 4.3-20 31 DEC 2017 4.3-21 31 DEC 2017 4.3-22 31 DEC 2017 4.4-1 31 DEC 2017 4.4-2 31 DEC 2017 4.4-3 31 DEC 2017 4.4-4 31 DEC 2017 4.4-5 31 DEC 2017 14.4-6 31 DEC 2017 14.4-7 31 DEC 2017 4.4-8 31 DEC 2017 4.5-1 31 DEC 2017 14.5-2 31 DEC 2017 14.5-3 31 DEC 2017

!4.5-4 31 DEC 2017 14.5-5 31 DEC 2017 14.5-6 31 DEC 2017 14.5-7 31 DEC 2017 14.5-8 31 DEC 2017 14.5-9 31 DEC 2017 14.5-10 31 DEC 2017 14.5-11 31 DEC 2017 14.5-12 31 DEC 2017 4.5-13 31 DEC 2017 14.5-14 31 DEC 2017 14.5-15 31 DEC 2017 14.5-16 31 DEC 2017 14.5-17 31 DEC 2017 4.5-18 31 DEC 2017 4.5-19 31 DEC 2017 14.5-20 31 DEC 2017 Attachrnent 2 - Page 17 of 55

Oconee Nuclear Station Updated Final Safety Analysis Report 2017 List of Effective Pages Page Effective Date Chapter 4 Tables rTabie 4-1 (Page 1 of 5) 31 DEC 2009 rTable 4-1 (Page 2 of 5) 31 DEC 2009 rrable 4-1 (Page 3 of 5) 31 DEC 2009 rrable 4-1 (Page 4 of 5) 31 DEC 2009 rTable 4-1 (Page 5 of 5) 31 DEC 2009 rrable 4-2 (Paqe 1 of 2) 31 DEC 2009 rrable 4-2 (Page 2 of 2) 31 DEC 2009 rrable 4-3 (Page 1 of 2) 31°- DEC 2012 rTable 4-3 (Page 2 of 2) 31 DEC 2012 rTable 4-4 (Paqe 1 of 1) 31 DEC 2012 rTable 4-5 (Page 1 of 1) 31 DEC 2000

!Table 4-6 (Paqe 1 of 1) 31 DEC 2012 rrable 4-7 (Page 1 of 1) 31 DEC 2009 rrable 4-8 (Page 1 of 1) 31 DEC 2000 rTable 4-9 (Page 1 of 1) 31 DEC 2012 rTable 4-10 (Page 1 of 1) 31 DEC 2012

!Table 4-11 (Page 1 of 1) 31 DEC 2012 rrable 4-12 (Page 1 of 1) 31 DEC 2000 rrable 4-13 (Page 1 of 1) 31 DEC 2000 rrable 4-14 (Page 1 of 1) 31 DEC 2000 rTable 4-15 (Page 1 of 1) 31 DEC 2000 Table 4-16 (Page 1 of 1) 31 DEC 2000 rTable 4-17 (Page 1 of 2) 31 DEC 2000 Table 4-17 (Page 2 of 2) 31 DEC 2000 Table 4-18 (Page 1 of 1) 31 DEC 2000 Table 4-19 (Page 1 of 1) 31 DEC 2000 Table 4-20 (Page 1 of 1) 31 DEC 2012 Table 4-21 (Page 1 of 1) 31 DEC 2000 Table 4-22 (Page 1 of 1) 31 DEC 2013 Table 4-23 (Page 1 of 1) 31 DEC 2009 Table 4-24 (Page 1 of 1) 31 DEC 2013 Chapter 4 Figures Figure 4-1 (Page 1 of 1) 31 DEC 2000 Figure 4 4-3 (Page 1 of 1) 31 DEC 2000 Figure 4-4 (Page 1 of 1) 31 DEC 2000 Figure 4-5 (Page 1 of 1) 31 DEC 2012 Figure 4-6 (Page 1 of 1) 31 DEC 2012 Figure 4-7 (Page 1 of 1) 31 DEC 2000 Figure 4-8 (Page 1 of 1) 31 DEC 2000 Figure 4-9 (Page 1 of 1) 31 DEC 2000

  • Attachment 2 - Page 18 of 55

Oconee Nuclear Station Updated Final Safety Analysis Report 2017 List of Effective Pages Page Effective Date Fiqure 4-10 (Paqe 1 of 1) 31 DEC 2000 Figure 4-11 (Page 1 of 1 ) 31 DEC 2000 Figure 4-12 (Page 1 of 1) 31 DEC 2000 Figure 4-13 (Page 1 of 1) 31 DEC 2000 Figure 4-14 (Page 1 of 1) 31 DEC 2000 Figure 4-15 (Page 1 of 1) 31 DEC 2000 Figure 4-16 (Page 1 of 1) 31 DEC 2000 Figure 4-17 (Page 1 of 1) 31 DEC 2000 Figure 4-18 (Paqe 1 of 1) 31 DEC 2000 Fiqure 4 4-20 (Page 1 of 1) 31 DEC 2000 Fiqure 4-21 (Page 1 of 1) 31 DEC 2000 Fiqure 4-22 (Page 1 of 1) 31 DEC 2000 Figure 4-23 (Page 1 of 1) 31 DEC 2000 Figure 4-24 (Page 1 of 1) 31 DEC 2000 Figure 4-25 (Paqe 1 of 1) 31 DEC 2000 Figure 4-26 (Page 1 of 1) 31 DEC 2000 Figure 4-27 (Page 1 of 1) 31 DEC 2000 Figure 4-28 (Page 1 of 1) 31 DEC 2000 Figure 4-29 (Pa~:ie 1 of 1) . 31 DEC 2000 Figure 4-30 (Page 1 of 1) 31 DEC 2000 Figure 4-31 (Page 1 of 1) 31 DEC 2000 Figure 4-32 (Page 1 of 1) 31 DEC 2000 Figure 4-33 (Page 1 of 1) 31 DEC 2000 Figure 4-34 (Page 1 of 1) 31 DEC 2000 Figure 4 4-36 (Page 1 of 1) 31 DEC 2000 Figure 4-37 (Page 1 of 1) 31 DEC 2000 Figure 4-38 (Page 1 of 1} 31 DEC 2004 Chapter 5 5-i 31 DEC 2017 5-ii 31 DEC 2017 5-iii 31 DEC 2017 5-iv 31 DEC 2017 5-v 31 DEC 2017 5-vi 31 DEC 2017 5-vii 31 DEC 2017 5.0-1

  • 31 DEC 2017 5.0-2 31 DEC 2017 5.1-1 31 DEC 2017 5.1-2 31 DEC 2017 5.1-3 31 DEC 2017 5.1-4 31 DEC 2017 Attachment 2 - Page 19 of 55

Oconee Nuclear Station Updated Final Safety Analysis Report 2017 List of Effective Pages Page Effective Date 5.1-5 31 DEC 2017 5.1-6 31 DEC 2017 5.2-1 31 DEC 2017 5.2-2 31 DEC 2017 5.2-3 31 DEC 2017 5.2-4 31 DEC 2017 5.2-5 31 DEC 2017 5.2-6 31 DEC 2017 5.2-7 31 DEC 2017 5.2-8 31 DEC 2017 5.2-9 31 DEC 2017 5.2-10 31 DEC 2017 5.2-11 31 DEC 2017 5.2-12 31 DEC 2017 5.2-13 31 DEC 2017 5.2-14 31 DEC 2017 5.2-15 31 DEC 2017 5.2-16 31 DEC 2017 5.2-17 31 DEC 2017 5.2-18 31 DEC 2017 5.2-19 31 DEC 2017 5.2-20 31 DEC 2017 5.2-21 31 DEC 2017 5.2-22 31 DEC 2017 5.2-23 31 DEC 2017 5.2-24 31 DEC 2017 5.2-25 31 DEC 2017 5.2-26 31 DEC 2017 5.2-27 31 DEC 2017 5.2-28 31 DEC 2017 5.2-29 31 DEC 2017 5.2-30 31 DEC 2017 5.2-31 31 DEC 2017 5.2-32 31 DEC 2017 5.2-33 31 DEC 2017 5.2-34 31 DEC 2017 5.2-35 31 DEC 2017 5.2-36 31 DEC 2017 5.2-37 31 DEC 2017 5.2-38 31 DEC 2017 5.2-39 31 DEC 2017 5.2-40 31 DEC 2017 Attachment 2 - Page 20 of 55

Oconee Nuclear Station Updated Final Safety Analysis Report 2017 List of Effective Pages Page Effective Date 5.2-41 31 DEC 2017 5.2-42 31 DEC 2017 5.2-43 31 DEC 2017 5.2-44 31 DEC 2017 5.3-1 31 DEC 2017 5.3-2 31 DEC 2017 5.3-3 31 DEC 2017 5.3-4 31 DEC 2017 5.4-1 31 DEC 2017 5.4-2 31 DEC 2017 5.4-3 31 DEC 2017 5.4-4 31 DEC 2017 5.4-5 31 DEC 2017 5.4-6 31 DEC 2017 5.4-7 31 DEC 2017 5.4-8 31 DEC 2017 5.4-9 31 DEC 2017 5.4-10 31 DEC 2017 5.4-11 31 DEC 2017 5.4-12 31 DEC 2017 5.4-13 31 DEC 2017 5.4-14 31 DEC 2017 5.4-15 31 DEC 2017 5.4-16 31 DEC 2017 5.4-17 31 DEC 2017 5.4-18 31 DEC 2017 5.4-19 31 DEC 2017 5.4-20 31 DEC 2017 5.4-21 31 DEC 2017 5.4-22 31 DEC 2017 Chapter 5 Tables Table 5-1 (Paqe 1 of 1) 31 DEC 2000

[Table 5-2 (Page 1 of 3) 31 DEC 2004 Ifable 5-2 (Page 2 of 3) 31 DEC 2004 Table 5-2 (Page 3 of 3) 31 DEC 2004 Ifable 5-3 (Page 1 of 1) 31 DEC-2010 Ifable 5-4 (Page 1 of 1) 31 DEC 2004 Table 5-5 (Paqe 1 of 2) 31 DEC 2014

[Table 5-5 (Page 2 of 2) 31 DEC 2014

[Table 5-6 (Page 1 of 1) 31 DEC 2000 rTable 5-7 (Paqe 1 of 1) 31 DEC 2000 Attachment 2 - Page 21 of 55

Oconee Nuclear Station Updated Final Safety Analysis Report 2017 List of Effective Pages Page Effective Date rrable 5-8 (Page 1 of 1) 31 DEC 2004 rrable 5-9 (Page 1 of 1) 31 DEC 2004 rrable 5-10 (Page 1 of 5) 31 DEC 2004 rrable 5-10 (Page 2 of 5) 31 DEC 2004 rrable 5-10 (Page 3 of 5) 31 DEC 2004 rrable 5-10 (Page 4 of 5) 31 DEC 2004 rrable 5-10 (Paqe 5 of 5) 31 DEC 2004 rrable 5-11 (Paqe 1 of 2) 31 DEC 2003 rrable 5-11 .(Page 2 of 2) 31 DEC 2003 rrable 5-12 (Page 1 of 2) 31 DEC 2003 rrable 5-12 (Page 2 of 2) 31 DEC 2003 rrable 5-13 (Page 1 of 1) 31 DEC 2003 rrable 5-14 (Page 1 of 2) 31 DEC 2000 rrable 5-14 (Page 2 of 2) 31 DEC 2000 rrable 5-15 (Page 1 of 1) 31 DEC 2004 rrable 5-16 (Page 1 of 1) 31 DEC 2011 rrable 5-17 (Page 1 of 1) 31 DEC 2001 rrable 5-18 (Paqe 1 of 3) 31 DEC 2000 rrable 5-18 (Page 2 of 3) 31 DEC 2000 rrable 5-18 (Page 3 of 3) 31 DEC 2000 rrable 5-19 (Paqe 1 of 1) 31 DEC 2000 rrable 5-20 (Page 1 of 3) 31 DEC 2004 rrable 5-20 (Page 2 of 3) 31 DEC 2004 rrable 5-20 (Page 3 of 3) 31 DEC 2004 rrable 5-21 (Page 1 of 2) 31 DEC 2004 rrable 5-21 (Page 2 of 2) 31 DEC 2004 rrable 5-22 (Page 1 of 1) 31 DEC 2006 rrable 5-23 (Page 1 of 3) 31 DEC 2000 rrable 5-23 (Page 2 of 3) 31 DEC 2000 rrable 5-23 (Page 3 of 3) 31 DEC 2000 rrable 5-24 (Page 1 of 2) 31 DEC 2000 Table 5-24 (Page 2 of 2) 31 DEC 2000 Table 5-25 (Page 1 of 1) 31 DEC 2000 Table 5-26 (Page 1 of 2) 31 DEC 2000 Table 5-26 (Page 2 of 2) 31 DEC 2000 Table 5-27 (Page 1 of 2) 31 DEC 2000 Table 5-27 (Page 2 of 2) 31 DEC 2000 Table 5-28 (Page 1 of 1) 31 DEC 2000 Table 5-29 (Page 1 of 1) 31 DEC 2000 Chapter 5 Figures Figure 5-1 (Page 1 of 1) 31 DEC 2000 Attachment 2 - Page 22 of 55

Oconee Nuclear Station Updated Final Safety Analysis Report 2017 List of Effective Pages Page Effective Date Fiqure 5-2 (Paoe 1 of 1) 31 DEC 2000 Fiqure 5-3 (Paoe 1 of 1) 31 DEC 2000 Figure 5-4 (Page 1 of 1) 31 DEC 2000 Figure 5-5 (Page 1 of 1) 31 DEC 2004 Figure 5-6 (Page 1 of 1) 31 DEC 2017 Figure 5-7 (Page 1 of 1) 31 DEC 2004 Fioure 5-8 (Paoe 1 of 1) 31 DEC 2004 Fiqure 5-9 (Paqe 1 of 1) 31 DEC 2004 Figure 5-10 (Page 1- of 1) 31 DEC 2000 Figure 5-11 (Page 1 of 1) 31 DEC 2004 Figure 5-12 (Page 1 of 1 ) 31 DEC 2000 Fiaure 5-13 (Page 1 of 1) 31 DEC 2000 Figure 5-14 (Page 1 of 1) 31 DEC 2003 Fiqure 5-15 (Paoe 1 of 1) 31 DEC 2003 Fiqure 5-16 (Page 1 of 1) 31 DEC 2003 Figure 5-17 (Page 1 of 1) 31 DEC 2000 Figure 5-18 (Paqe 1 of 1) 31 DEC 2000 Fiqure 5-19 (Paqe 1 of 1) 31 DEC 2000 Figure 5-20 (Page 1 of 1) 31 DEC 2000 Fiqure 5-21 (Paqe 1 of 4) 31 DEC 2004 Figure 5-21 (Paqe 2 of 4) 31 DEC 2004 Figure 5-21 (Paqe 3 of 4) 31 DEC 2004 Figure 5-21 (Page 4 of 4) 31 DEC 2004 Figure 5-22 (Page 1 of 4) 31 DEC 2004 Figure 5-22 (Page 2 of 4) 31 DEC 2004 Figure 5-22 (Page 3 of 4) 31 DEC 2004 Figure 5-22 (Page 4 of 4) 31 DEC 2004 Figure 5-23 (Page 1 of 1 ) 31 DEC 2000 Figure 5-24 (Page 1 of 1) 31 DEC 2000 Figure 5-25 (Page 1 of 1) 31 DEC 2004 Figure 5-26 (Page 1 of 1) 31 DEC 2004 Fiaure 5-27 (Paae 1 of 1) 31 DEC 2000 Figure 5-28 (Page 1 of 1 ) 31 DEC 2000 Figure 5-29 (Page 1 of 1) 31 DEC 2008 Figure 5-30 (Page 1 of 1) 31 DEC 2003 Figure 5-31 (Page 1 of 1 ) 31 DEC 2003 Fiqure 5-32 (Page 1 of 1) 31 DEC 2003 Fiqure 5-33 (Page 1 of 1 ) 31 DEC 2003 Chapter 6 6-i 31 DEC 2017 6-ii 31 DEC 2017 Attachment 2 - Page 23 of 55

Oconee Nuclear Station Updated Final Safety Analysis Report 2017 List of Effective Pages Page Effective Date 6-iii 31 DEC 2017 6-iv 31 DEC 2017 6-v 31 DEC 2017 6-vi 31 DEC 2017 6-vii 31 DEC 2017 6-viii 31 DEC 2017 6.0-1 31 DEC 2017 6.0-2 31 DEC 2017 6.1-1 31 DEC 2017 6.1-2 31 DEC 2017 6.1-3 31 DEC 2017 6.1-4 31 DEC 2017 6.1-5 31 DEC 2017 6.1-6 31 DEC 2017 6.2-1 31 DEC 2017 6.2-2 31 DEC 2017 6.2-3 31 DEC 2017 6.2-4 31 DEC 2017 6.2-5 31 DEC 2017 6.2-6 31 DEC 2017 6.2-7 31 DEC 2017 6.2-8 31 DEC 2017 6.2-9 31 DEC 2017 6.2-10 31 DEC 2017 6.2-11 31 DEC 2017 6.2-12 31 DEC 2017 6.2-13 31 DEC 2017 6.2-14 31 DEC 2017 6.2-15 31 DEC 2017 6.2-16 31 DEC 2017 6.2-17 31 DEC 2017 6.2-18 31 DEC 2017 6.2-19 31 DEC 2017 6.2-20 31 DEC 2017 6.2-21 31 DEC 2017 6.2-22 31 DEC 2017 6.2-23 31 DEC 2017 6.2-24 31 DEC 2017 6.3-1 31 DEC 2017 6.3-2 31 DEC 2017 6.3-3 31 DEC 2017 6.3-4 31 DEC 2017 Attachment 2 - Page 24 of 55

Oconee Nuclear Station Updated Final Safety Analysis Report 2017 List of Effective Pages Page Effective Date 6.3-5 31 DEC 2017 6.3-6 31 DEC 2017 6.3-7 31 DEC 2017 6.3-8 31 DEC 2017 6.3-9 31 DEC 2017 6.3-10 31 DEC 2017 6.3-11 31 DEC 2017 6.3-12 31 DEC 2017 6.3-13 31 DEC 2017 6.3-14 31 DEC 2017 6.3-15 31 DEC 2017 6.3-16 31 DEC 2017 6.3-17 31 DEC 2017 6.3-18 31 DEC 2017 6.4-1 31 DEC 2017 6.4-2 31 DEC 2017 6.4-3 31 DEC 2017 6.4-4 31 DEC 2017 6.5-1 31 DEC 2017 6.5-2 31 DEC 2017 6.5-3 31 DEC 2017 6.5-4 31 DEC 2017 6.6-1 31 DEC 2017 6.6-2 31 DEC 2017 Chapter 6 Tables

!Table 6-1 (Page 1 of 1) 31 DEC 2000

!Table 6-2 (Page 1 of 1) 31 DEC 2000

!Table 6-3 (Paqe 1 of 2) 31 DEC 2000 rfable 6-3 (Paqe 2 of 2) 31 DEC 2000

!Table 6-4 (Page 1 of 2) 31 DEC 2016

!Table 6-4 (Page 2 of 2) 31 DEC 2016 ifable 6-5 (Page 1 of 1) 31 DEC 2000

!Table 6-6 (Page 1 of 1) 31 DEC 2000

!Table 6-7 (Page 1 of 7) 31 DEC 2014

!Table 6-7 (Paqe 2 of 7) 31 DEC 2014 ifable 6-7 (Page 3 of 7) 31 DEC 2014

!Table 6-7 (Page 4 of 7) 31 DEC 2014

!Table 6-7 (Paqe 5 of 7) 31 DEC 2014

!Table 6-7 (Paqe 6 of 7) 31 DEC 2014

!Table 6-7 (Page 7 of 7) 31 DEC 2014

!Table 6-8 (Paqe 1 of 2) 31 DEC 2005 Attachment 2 - Page 25 of 55

Oconee Nuclear Station Updated Final Safety Analysis Report 2017 List of Effective Pages Page Effective Date

!Table 6-8 (Paqe 2 of 2) 31 DEC 2005

[Table 6-9 (Page 1 of 1) 31 DEC 2009

!Table 6-1 O (Page 1 of 1) 31 DEC 2000

!Table 6-11 (Page 1 of 2) 31 DEC 2005

!Table 6-11 (Page 2 of 2) 31 DEC 2005

!Table 6-12 (Page 1 of 1) 31 DEC 2000

[Table 6-13 (Page 1 of 1) 31 DEC 2000

!Table 6-14 (Page 1 of 2) 31 DEC 2000

!Table 6-14 (Page 2 of 2) 31 DEC 2000

!Table 6-15 (Page 1 of 1) 31 DEC 2005

[Table 6-16-6-17 (Page 1 of 1) 31 DEC 2000

!Table 6-18 (Page 1 of 1) 31 DEC 2000

!Table 6-19 (Page 1 of 1) 31 DEC 2015 Table 6-20 (Page 1 of 1) 31 DEC 2000

[Table 6-21 (Page 1 of 1) 31 DEC 2003 Table 6-22 (Page 1 of 1) 31 DEC 2017 Table 6-23 (Page 1 of 1) 31 DEC 2013 Table 6-24 (Page 1 of 1) 31 DEC 2017 Table 6-25 (Page 1 of 1) 31 DEC 2017 Table 6-26 (Page 1 of 2) 31 DEC 2013 Table 6-26 (Page 2 of 2) 31 DEC 2013 Table 6-27 (Page 1 of 1) 31 DEC 2008 Table 6-28 (Page 1 of 1) 31 DEC 2000 Table 6-29 (Page 1 of 15) 31 DEC 2003 Table 6-29 (Page 2 of 15) 31 DEC 2003 Table 6-29 (Page 3 of 15) 31 DEC 2003 Table 6-29 (Page 4 of 15) 31 DEC 2003 Table 6-29 (Page 5 of 15) 31 DEC 2003 Table 6-29 (Page 6 of 15) 31 DEC 2003 Table 6-29 (Page 7 of 15) 31 DEC 2003 Table 6-29 (Page 8 of 15) 31 DEC 2003 Table 6-29 (Paqe 9 of 15) 31 DEC 2003 Table 6-29 (Page 10 of 15) 31 DEC 2003 Table 6-29 (Page 11 of 15) 31 DEC 2003 rrable 6-29 (Page 12 of 15) 31 DEC 2003

[Table 6-29 (Page 13 of 15) 31 DEC 2003

!Table 6-29 (Page 14 of 15) 31 DEC 2003 Table 6-29 (Page 15 of 15) 31 DEC 2003

!Table 6-30 (Page 1 of 40) 31 DEC 2003 Table 6-30 (Page 2 of 40) 31 DEC 2003

[Table 6-30 (Page 3 of 40) 31 DEC 2003

!Table 6-30 (Page 4 of 40) 31 DEC 2003 Attachment 2 - Page 26 of 55

Oconee Nuclear Station Updated Final Safety Analysis Report 2017 List of Effective Pages Page Effective Date Table 6-30 (Page 5 of 40) 31 DEC 2003 Table 6-30 (Page 6 of 40) 31 DEC 2003 Table 6-30 (Page 7 of 40) 31 DEC 2003 Table 6-30 (Page 8 of 40) 31 DEC 2003 Table 6-30 (Page 9 of 40) 31 DEC 2003 Table 6-30 (Page 10 of 40) 31 DEC 2003 Table 6-30 (Page 11 of 40) 31 DEC 2003 Table 6-30 (Page 12 of 40) 31- DEC 2003 table 6-30 (Page 13 of 40) 31 DEC 2003 Table 6-30 (Page 14 of 40) 31 DEC 2003 Table 6-30 (Page 15 of 40) 31 DEC 2003 Table 6-30 (Page 16 of 40) 31 DEC 2003 Table 6-30 (Page 17 of 40) 31 DEC 2003 Table 6-30 (Page 18 of 40) 31 DEC 2003 Table 6-30 (Page 19 of 40) 31 DEC 2003 Table 6-30 (Page 20 of 40) 31 DEC 2003 Table 6-30 (Page 21 of 40) 31 DEC 2003 Table 6-30 (Page 22 of 40) 31 DEC 2003 Table 6-30 (Page 23 of 40) 31 DEC 2003 Table 6-30 (Page 24 of 40) 31 DEC 2003 Table 6-30 (Page 25 of 40) 31 DEC 2003 Table 6-30 (Page 26 of 40) 31 DEC 2003 Table 6-30 (Page 27 of 40) 31 DEC 2003 Table 6-30 (Page 28 of 40) 31 DEC 2003 Table 6-30 (Page 29 of 40) 31 DEC 2003 Table 6-30 (Page 30 of 40) 31 DEC 2003 Table 6-30 (Page 31 of 40) 31 DEC 2003 Table 6-30 (Paqe 32 of 40) 31 DEC 2003 Table 6-30 (Page 33 of 40) 31 DEC 2003 Table 6-30 (Page 34 of 40) 31 DEC 2003 Table 6-30 (Page 35 of 40) 31 DEC 2003 Table 6-30 (Page 36 of 40) 31 DEC 2003 Table 6-30 (Page 37 of 40) 31 DEC 2003 rrable 6-30 (Page 38 of 40) 31 DEC 2003 rrable 6-30 (Page 39 of 40) 31 DEC 2003 Table 6-30 (PaQe 40 of 40) 31 DEC 2003 Table 6-31 (Page 1 of 2) 31 DEC 2017 Table 6-31 (Page 2 of 2) 31 DEC 2017 Table 6-32 (Page 1 of 5) 31 DEC 2003 Table 6-32 (Page 2 of 5) 31 DEC 2003 Table 6-32 (Page 3 of 5) 31 DEC 2003 rrable 6-32 (Page 4 of 5) 31 DEC 2003 Attachment 2 - Page 27 of 55

Oconee Nuclear Station Updated Final Safety Analysis Report 2017 List of Effective Pages Page Effective Date Table 6-32 (Page 5 of 5) 31 DEC 2003 Table 6-33 (Page 1 of 1) 31 DEC 2005 Table 6-34 (PaQe 1 of 1) 31 DEC 2008 Table 6-35 (Page 1 of 18) 31 DEC 2003 Table 6-35 (Page 2 of 18) 31 DEC 2003 Table 6-35 (Page 3 of 18) 31 DEC 2003 Table 6-35 (Page 4 of 18) 31 DEC 2003 Table 6-35 (Page 5 of 18) 31 DEC 2003 Table 6-35 (Page 6 of 18) 31 DEC 2003 Table 6-35 (Page 7 of 18) 31 DEC 2003 Ifable 6-35 (Page 8 of 18) 31 DEC 2003

!Table 6-35 (Page 9 of 18) 31 DEC 2003 rrable 6-35 (Page 10 of 18) 31 DEC 2003 rrable 6-35 (Page 11 of 18) 31 DEC 2003 If able 6-35 (Page 12 of 18) 31 DEC 2003 Ifable 6-35 (Page 13 of 18) 31 DEC 2003

!Table 6-35 (Page 14 of 18) 31 DEC 2003 rrable 6-35 (Page 15 of 18) 31 DEC 2003 rrable 6-35 (Page 16 of 18) 31 DEC 2003 rrable 6-35 (Page 17 of 18) 31 DEC 2003

!fable 6-35 (Page 18 of 18) 31 DEC 2003 Chapter 6 Figures Figure 6-1 (Page 1 of 1) 31 DEC 2005 Figure 6-2 (Page 1 of 1) 31 DEC 2002 Figure 6-3 (Page 1 of 1) 31 DEC 2017 Figure 6-4 (Page 1 of 1) 31 DEC 2006 Figure 6-5 (Page 1 of 1) 31 DEC 2000 Figure 6-6 (Page 1 of 1) 31 DEC 2000 Figure 6-7 (Page 1 of 1) 31 DEC 2000 Figure 6-8 (Page 1 of 1) 31 DEC 2000 Figure 6-9 (Page 1 of 3) 31 DEC 2009 Figure 6-9 (Page 2 of 3) 31 DEC 2009 Figure 6-9 (Page 3 of 3) 31 DEC 2009 Figure 6 6-15 (Page 1 of 1) 31 DEC 2000 Figure 6-16 (Page 1 of 1 ) 31 DEC 2000 Figure 6-17 (Page 1 of 1) 31 DEC 2000

  • Figure 6-18 (Page 1 of 1) 31 DEC 2000 Figure 6-19 (Page 1 of 1) 31 DEC 2007 Figure 6-20 (Page 1 of 1) 31 DEC 2000 Figure 6-21 (Page 1 of 1) 31 DEC 2000 Figure 6-22 (Page 1 of 1) 31 DEC 2000 Attachment 2 - Page 28 of 55

Oconee Nuclear Station Updated Final Safety Analysis Report 2017 List of Effective Pages Page Effective Date Figure 6-23 (Page 1 of 1) 31 DEC 2000 Figure 6-24 (Page 1 of 1) 31 DEC 2000 Figure 6-25 (Page 1 of 1) 31 DEC 2000 Figure 6-26 (Page 1 of 1) 31 DEC 2000 Figure 6-27 (Page 1 of 1) 31 DEC 2000 Figure 6-28 (Page 1 of 1) 31 DEC 2003 Figure 6-29 (Page 1 of 1) 31 DEC 2003 Figure 6-30 (Page 1 of 1) 31 DEC 2003 Figure 6-31 (Page 1 of 1) 31 DEC 2003 Figure 6-32 (Page 1 of 1) 31 DEC 2003 Figure 6-33 (Page 1 of 1) 31 DEC 2003 Figure 6-34 (Page 1 of 1) 31 DEC 2003 Figure 6-35 (Page 1 of 1) 31 DEC 2003 Figure 6-36 (Page 1 of 1) 31 DEC 2013 Figure 6-37 (Page 1 of 1) 31 DEC 2013 Figure 6 6-41 (Paqe 1 of 1) 31 DEC 2003 Figure 6-42 (Page 1 of 1) 31 DEC 2008 Figure 6-43 (Page 1 of 1) 31 DEC 2008 Fiqure 6-44 (Page 1 of 1) 31 DEC 2000 Figure 6-45 (Page 1 of 1) 31 DEC 2000 Figure 6-46 (Page 1 of 1) 31 DEC 2000 Figure 6-47 (Page 1 of 1) 31 DEC 2000 Figure 6-48 (Page 1 of 1) 31 DEC 2000 Figure 6-49 (Page 1 of 1) 31 DEC 2003 Figure 6-50 (Page 1 of 1) 31 DEC 2000 Figure 6-51 (Page 1 of 1) 31 DEC 2000 Figure 6-52 (Page 1 of 1) 31 DEC 2000 Figure 6-53 (PaQe 1 of 1) 31 DEC 2000 Chapter 7 7-i 31 DEC 2017 7-ii 31 DEC 2017 7-iii 31 DEC 2017 7-iv 31 DEC 2017 7-v 31 DEC 2017 7-vi 31 DEC 2017 7-vii 31 DEC 2017 7.0-1 31 DEC 2017 7.0-2 31 DEC 2017 7.1-1 31 DEC 2017 7.1-2 31 DEC 2017 7.1-3 31 DEC 2017 Attachment 2 - Page 29 of 55

Oconee Nuclear Station Updated Final Safety Analysis Report 2017 List of Effective Pages Page Effective Date 7.1-4 31 DEC 2017 7.2-1 31 DEC 2017 7.2-2 31 DEC 2017 7.2-3 31 DEC 2017 7.2-4 31 DEC 2017 7.2-5 31 DEC 2017 7.2-6 31 DEC 2017 7.2-7 31 DEC 2017 7.2-8 31 DEC 2017 7.2-9 31 DEC 2017 7.2-10 31 DEC 2017 7.2-11 31 DEC 2017 7.2-12 31 DEC 2017 7.2-13 31 DEC 2017 7.2-14 31 DEC 2017 7.3-1 31 DEC 2017 7.3-2 31 DEC 2017 7.3-3 31 DEC 2017 7.3-4 31 DEC 2017 7.3-5 31 DEC 2017 7.3-6 31 DEC 2017 7.3-7 31 DEC 2017 7.3-8 31 DEC 2017 7.3-9 31 DEC 2017 7.3-10 31 DEC 2017 7.4-1 31 DEC 2017 7.4-2 31 DEC 2017 7.4-3 31 DEC 2017 7.4-4 31 DEC 2017 7.4-5 31 DEC 2017 7.4-6 31 DEC 2017 7.4-7 31 DEC 2017 7.4-8 31 DEC 2017 7.4-9 31 DEC 2017 7.4-10 31 DEC 2017 7.4-11 31 DEC 2017 7.4-12 31 DEC 2017 7.4-13 31 DEC 2017 7.4-14 31 DEC 2017 7.4-15 31 DEC 2017 7.4-16 31 DEC 2017 7.4-17 31 DEC 2017 Attachment 2 - Page 30 of 55

Oconee Nuclear Station Updated Final Safety Analysis Report 2017 List of Effective Pages Page Effective Date 7.4-18 31 DEC 2017 7.5-1 31 DEC 2017 7.5-2 31 DEC 2017 7.5-3 31 DEC 2017 7.5-4 31 DEC 2017 7.5-5 31 DEC 2017 7.5-6 31 DEC 2017 7.5-7 31 DEC 2017 7.5-8 31 DEC 2017 7.5-9 31 DEC 2017 7.5-10 31 DEC 2017 7.5-11 31 DEC 2017 7.5-12 31 DEC 2017 7.5-13 31 DEC 2017 7.5-14 31 DEC 2017 7.5-15 31 DEC 2017 7.5-16 31 DEC 2017 7.5-17 31 DEC 2017 7.5-18 31 DEC 2017 7.5-19 31 DEC 2017 7.5-20 31 DEC 2017 7.5-21 31 DEC 2017 7.5-22 31 DEC 2017 7.5-23 31 DEC 2017 7.5-24 31 DEC 2017 7.5-25 31 DEC 2017 7.5-26 31 DEC 2017 7.5-27 31 DEC 2017 7.5-28 31 DEC 2017 7.6-1 31 DEC 2017 7.6-2 31 DEC 2017 7.6-3 31 DEC 2017 7.6-4 31 DEC 2017 7.6-5 31 DEC 2017 7.6-6 31 DEC 2017 7.6-7 31 DEC 2017 7.6-8 31 DEC 2017 7.6-9 31 DEC 2017 7.6-10 31 DEC 2017 7.6-11 31 DEC 2017 7.6-12 31 DEC 2017 7.6-13 31 DEC 2017 Attachment 2 - Page 31 of 55

Oconee Nuclear Station Updated Final Safety Analysis Report 2017 List of Effective Pages Page Effective Date 7.6-14 31 DEC 2017 7.6-15 31 DEC 2017 7.6-16 31 DEC 2017 7.6-17 31 DEC 2017 7.6-18 31 DEC 2017 7.7-1 31 DEC 2017 7.7-2 31 DEC 2017 7.7-3 31 DEC 2017 7.7-4

  • 31 DEC 2017 7.7-5 31 DEC 2017 7.7-6 31 DEC 2017 7.8-1 31 DEC 2017 7.8-2 31 DEC 2017 7.8-3 31 DEC 2017 7.8-4 31 DEC 2017 7.9-1 31 DEC 2017 7.9-2 31 DEC 2017 7.9-3 31 DEC 2017 7.9-4 31 DEC 2017 7.9-5 31 DEC 2017 7.9-6 31 DEC 2017 7.10-1 31 DEC 2017 7.10-2 31 DEC 2017 7.11-1 31 DEC 2017 7.11-2 31 DEC 2017 Chapter 7 Tables Table 7-1 (Page 1 of 1) 31 DEC 2016 Table 7-2 (Page 1 of 1) 31 DEC 2012 Table 7-3 (Page 1 of 1) 31 DEC 2012 Table 7-4 (Page 1 of 1) 31 DEC 2013 Table 7-5 (Page 1 of 2) 31 DEC 2006 Table 7-5 (Page 2 of 2) 31 DEC 2006 Table 7-6 (Page 1 of 1) 31 DEC 2005 Chapter 7 Figures Figure 7-1 (Page 1 of 16) 31 DEC 2013 Figure 7-1 (Page 2 of 16) 31 DEC 2013 Figure 7-1 (Page 3 of 16) 31 DEC 2013 Figure 7-1 (Page 4 of 16) 31 DEC 2013 Figure 7-1 (Page 5 of 16) 31 DEC 2013 Figure 7-1 (Page 6 of 16) 31 DEC 2013 Attachment 2 - Page 32 of 55

Oconee Nuclear Station Updated Final Safety Analysis Report 2017 List of Effective Pages Page Effective Date Fiqure 7-1 (Page 7 of 16) 31 DEC 2013 Figure 7-1 (Page 8 of 16) 31 DEC 2013 Figure 7-1 (Page 9 of 16) 31 DEC 2013 Figure 7-1 (Page 1O of 16) 31 DEC 2013 Figure 7-1 (Page 11 of 16) 31 DEC 2013 Fiqure 7-1 (Paqe 12 of 16) 31 DEC 2013 Figure 7-1 (Page 13 of 16) 31 DEC 2013 Figure 7-1 (Page 14 of 16) 31 DEC 2013 FiQure 7-1 (PaQe 15 of 16) 31 DEC 2013 Fiqure 7-1 (Paqe 16 of 16) 31 DEC 2013 Figure 7-2 (Page 1 of 1) 31 DEC 2000 Figure 7-3 (Page 1 of 1) 31 DEC 2003 Figure 7-4 (Page 1 of 1) 31 DEC 2012 Figure 7-5 (Page 1 of 8) 31 DEC 2013 Figure 7-5 (Page 2 of 8) 31 DEC 2013 Figure 7-5 (Page 3 of 8) 31 DEC 2013 Figure 7-5 (Page 4 of 8) 31 DEC 2013 Figure 7-5 (Page 5 of 8) 31 DEC 2013 Figure 7-5 (Page 6 of 8) 31 DEC 2013 Figure 7-5 (Page 7 of 8) 31 DEC 2013 Figure 7-5 (Page 8 of 8) 31 DEC 2013 Figure 7-6 (Page 1 of 1) 31 DEC 2013 Figure 7-7 (Page 1 of 1) 31 DEC 2000 Figure 7-8 (Page 1 of 1) 31 DEC 2013 Figure 7-9 (Page 1 of 1) 31 DEC 2011 Figure 7-10 (PaQe 1 of 1) 31 DEC 2013 Figure 7-11 (Page 1 of 1) 31 DEC 2000 Fiqure 7-12 (Paqe 1 of 1) 31 DEC 2009 Fiqure 7-13 (Page 1 of 1) 31 DEC 2009 Figure 7-14 (Page 1 of 1) 31 DEC 2000 Figure 7-15 (Page 1 of 1) 31 DEC 2000 Fiqure 7-16 (Paqe 1 of 1) 31 DEC 2000 Figure 7-17 (Page 1 of 1) 31 DEC 2000 Figure 7-18 (Page 1 of 1 ) 31 DEC 2004 Figure 7-19 (Page 1 of 1) 31 DEC 2000 Figure 7-20 (Page 1 of 1) 31 DEC 2000 Figure 7-21 (Page 1 of 1) 31 DEC 2000 Figure 7 7-25 (Page 1 of 1) 31 DEC 2000 Fiqure 7-26 (Page 1 of 1) 31 DEC 2000 Chapter 8 8-i 31 DEC 2017 Attachment 2 - Page 33 of 55

Oconee Nuclear Station Updated Final Safety Analysis Report 2017 List of Effective Pages Page Effective Date 8-ii 31 DEC 2017 8-iii 31 DEC 2017 8-iv 31 DEC 2017 8.0-1 31 DEC 2017 8.0-2 31 DEC 2017 8.1-1 31 DEC 2017 8.1-2 31 DEC 2017 8.2-1 31 DEC 2017

-8.2-2 31 DEC 2017 8.2-3 31 DEC 2017 8.2-4 31 DEC 2017 8.2-5 31 DEC 2017 8.2-6 31 DEC 2017 8.3-1 31 DEC 2017 8.3-2 31 DEC 2017 8.3-3 31 DEC 2017 8.3-4 31 DEC 2017 8.3-5 31 DEC 2017 8.3-6 31 DEC 2017 8.3-7 31 DEC 2017 8.3-8 31 DEC 2017 8.3-9 31 DEC 2017 8.3-10 31 DEC 2017 8.3-11 31 DEC 2017 8.3-12 31 DEC 2017 8.3-13 31 DEC 2017 8.3-14 31 DEC 2017 8.3-15 31 DEC 2017 8.3-16 31 DEC 2017 8.3-17 31 DEC 2017 8.3-18 31 DEC 2017 8.3-19 31 DEC 2017 8.3-20 31 DEC 2017 8.3-21 31 DEC 2017 8.3-22 31 DEC 2017 8.4-1 31 DEC 2017 8.4-2 31 DEC 2017 Chapter 8 Tables Table 8-1 (Page 1 of 2) 31 DEC 2002 Table 8-1 (Page 2 of 2) 31 DEC 2002

!Table 8-2 (PaQe 1 of 2) 31 DEC 2000 Attachment 2 - Page 34 of 55

Oconee Nuclear Station Updated Final Safety Analysis Report 2017 List of Effective Pages Page Effective Date rrable 8-2 (Page 2 of 2) 31 DEC 2000 rrable 8-3 (Page 1 of 2) 31 DEC 2014 If able 8-3 (Page 2 of 2) 31 DEC 2014 Ifable 8-4 (Page 1 of 2) 31 DEC 2014 rrable 8-4 (Page 2 of 2) 31 DEC 2014 rrabie 8-5 (Page 1 of 4) 31 DEC 2000 rrable 8-5 (Page 2 of 4) 31 DEC 2000 If able 8-5 (Page 3 of 4) 31 DEC 2000 rrable 8~5 (Page 4 of 4) 31 DEC 2000 rrable 8-6 (Page 1 of 1) 31 DEC 2000 lfable 8-7 (Page 1 of 1) 31 DEC 2000 Chapter 8 Figures Figure 8-1 (Page 1 of 1) 31 DEC 2015 Figure 8-2 (Page 1 of 1) 31 DEC 2015 Figure 8-3 (Paqe 1 of 2) 31 DEC 2015 Figure 8-3 (Page 2 of 2) 31 DEC 2015 Figure 8-4 (Page 1 of 3) 31 DEC 2015 Figure 8-4 (Page 2 of 3) 31 DEC 2015 Figure 8-4 (Page 3 of 3) 31 DEC 2015 Figure 8-5 (Page 1 of 1) 31 DEC 2017 Figure 8-6 (Page 1 of 1) 31 DEC 2013 Figure 8-7 (Page 1 of 1) 31 DEC 2006 FiQure 8-8 (PaQe 1 of 1) 31 DEC 2000 Figure 8-9 (Page 1 of 1) 31 DEC 2000 Chapter 9 9-i 31 DEC 2017 9-ii 31 DEC 2017 9-iii 31 DEC 2017 9-iv 31 DEC 2017 9-v 31 DEC 2017 9-vi 31 DEC 2017 9-vii 31 DEC 2017 9-viii 31 DEC 2017 9.0-1 31 DEC 2017 9.0-2 31 DEC 2017 9.1-1 31 DEC 2017 9.1-2 31 DEC 2017 9.1-3 31 DEC 2017 9.1-4 31 DEC 2017 9.1-5 31 DEC 2017 Attachment 2 - Page 35 of 55

Oconee Nuclear Station Updated Final Safety Analysis Report 2017 List of Effective Pages Page Effective Date 9.1-6 31 DEC 2017 9.1-7 31 DEC 2017 9.1-8 31 DEC 2017 9.1-9 31 DEC 2017 9.1-10 31 DEC 2017 9.1-11 31 DEC 2017 9.1-12 31 DEC 2017 9.1-13 31 DEC 2017 9.1-14 31 DEC 2017 9.1-15 31 DEC 2017 9.1-16 31 DEC 2017 9.1-17 31 DEC 2017 9.1-18 31 DEC 2017 9.1-19 31 DEC 2017 9.1-20 31 DEC 2017 9.1-21 31 DEC 2017 9.1-22 31 DEC 2017 9.1-23 31 DEC 2017 9.1-24 31 DEC 2017 9.1-25 31 DEC 2017 9.1-26 31 DEC 2017 9.1-27 31 DEC 2017 9.1-28 31 DEC 2017 9.1-29 31 DEC 2017 9.1-30 31 DEC 2017 9.2-1 31 DEC 2017 9.2-2 31 DEC 2017 9.2-3 31 DEC 2017 9.2-4 31 DEC 2017 9.2-5 31 DEC 2017 9.2-6 31 DEC 2017 9.2-7 31 DEC 2017 9.2-8 31 DEC 2017 9.2-9 31 DEC 2017 9.2-10 31 DEC 2017 9.2-11 31 DEC 2017 9.2-12 31 DEC 2017 9.2-13 31 DEC 2017 9.2-14 31 DEC 2017 9.3-1 . 31 DEC 2017 9.3-2 31 DEC 2017 9.3-3 31 DEC 2017 Attachment Page 36 of 55

  • Oconee Nuclear Station Updated Final Safety Analysis Report 2017 List of Effective Pages Page Effective Date 9.3-4 31 DEC 2017 9.3-5 31 DEC 2017 9.3-6 31 DEC 2017 9.3-7 31 DEC 2017 9.3-8 31 DEC 2017 9.3-9 31 DEC 2017 9.3-10 31 DEC 2017 9.3-11 31 DEC 2017 9.3-12 31 DEC 2017 9.3-13 31 DEC 2017 9.3-14 31 DEC 2017 9.3-15 31 DEC 2017 9.3-16 31 DEC 2017 9.4-1 31 DEC 2017 9.4-2 31 DEC 2017 9.4-3 31 DEC 2017 9.4-4 31 DEC 2017 9.4-5 31 DEC 2017 9.4-6 31 DEC 2017 9.4-7 31 DEC 2017 9.4-8 31 DEC 2017 9.4-9 31 DEC 2017 9.4-10 31 DEC 2017 9.4-11 I 31 DEC 2017 9.4-12 31 DEC 2017 9.4-13 31 DEC 2017 9.4-14 31 DEC 2017 9.5-1 31 DEC 2017 9.5-2 31 DEC 2017 9.5-3 31 DEC 2017 9.5-4 31 DEC 2017 9.5-5 31 DEC 2017 9.5-6 31 DEC 2017 9.6-1 31 DEC 2017 9.6-2 31 DEC 2017 9.6-3 31 DEC 2017 9.6-4 31 DEC 2017 9.6-5 31 DEC 2017 9.6-6 31 DEC 2017 9.6-7 31 DEC 2017 9.6-8 31 DEC 2017 9.6-9 31 DEC 2017 Attachment 2 - Page 37 of 55

Oconee Nuclear Station Updated Final Safety Analysis Report 2017 List of Effective Pages Page Effective Date 9.6-10 31 DEC 2017 9.6-11 31 DEC 2017 9.6-12 31 DEC 2017 9.6-13 31 DEC 2017 9.6-14 31 DEC 2017 9.6-15 31 DEC 2017 9.6-16 31 DEC 2017 9.6-17 31 DEC 2017 9.6-18 31 DEC 2017 9.6-19 31 DEC2017 9.6-20 31 DEC 2017 9.7-1 31 DEC 2017 9.7-2 31 DEC 2017 9.7-3 31 DEC 2017 9.7-4 31 DEC 2017 9.7-5 31 DEC 2017 9.7-6 31 DEC 2017 9.7-7 31 DEC 2017 9.7-8 31 DEC 2017 9.7-9 31 DEC 2017 9.7-10 31 DEC 2017 9.7-11 31 DEC 2017 9.7-12 31 DEC 2017 Chapter 9 Tables rrable 9-1 (Page 1 of 2) 31 DEC 2000 rrable 9-1 (Page 2 of 2) 31 DEC 2000 rrable 9-2 (Page 1 of 2) 31 DEC 2015 Table 9-2 (Page 2 of 2) 31 DEC2015 Table 9-3 (Page 1 of 1) 31 DEC 2000 rrable 9-4 (Page 1 of 2) 31 DEC 2000 Table 9-4 (Page 2 of 2) 31 DEC 2000

!fable 9-5 (Page 1 of 3) 31 DEC 2006 Table 9-5 (Page 2 of 3) 31 DEC 2006 rrable 9-5 (Page 3 of 3) 31 DEC 2006 rrable 9-6 (Page 1 of 1) 31 DEC 2017 Table 9-7 (Page 1 of 2) 31 DEC 2005 Table 9-7 (Page 2 of 2) 31 DEC 2005 Table 9-8 (Page 1 of 1) 31 DEC 2000 Table 9-9 (Page 1 of 2) 31 DEC 2009 Table 9-9 (Page 2 of 2) 31 DEC 2009 Table 9-10 (Page 1 of 2) 31 DEC 2000 Attachment 2 - Page 38 of 55

Oconee Nuclear Station Updated Final Safety Analysis Report 2017 List of Effective Pages Page Effective Date Table 9-10 (Page 2 of 2) 31 DEC 2000 Table 9-11 (Page 1 of 2) 31 DEC 2000 Table 9-11 (Page 2 of 2) 31 DEC 2000 Table 9-12 (Paqe 1 of 1) 31 DEC 2002 Table 9-13 (Paqe 1 of 2) 31 DEC 2000 Table 9-13 (Page 2 of 2) 31 DEC 2000 Table 9-14 (Page 1 of 4) 31 DEC 2010 Table 9-14 (Page 2 of 4) 31 DEC 2010 Table 9-14 (Paqe 3 of 4) 31 DEC 2010 Table 9-14 (Page 4 of 4) 31 DEC 2010 Table 9-15 (Page 1 of 2) 31 DEC 2010 Table 9-15 (Page 2 of 2) 31 DEC 2010 Table 9-16 (Page 1 of 1) 31 DEC 2011 Table 9-17 (Paqe 1 of 1) 31 DEC 2000 Table 9-18 (Paqe 1 of 1) 31 DEC 2000 Table 9-19 (Page 1 of 1) 31 DEC 2000 Table 9-20 (Page 1 of 1) 31 DEC 2015 Chapter 9 Figures Fiqure 9-1 (Page 1 of 1) 31 DEC 2000 Fiqure 9-2 (Page 1 of 1) 31 DEC 2000 Figure 9-3 (Page 1 of 1) 31 DEC 2000 Figure 9-4 (Paqe 1 of 1) 31 DEC 2000 Figure 9-5 (Page 1 of 1) 31 DEC 2017 Fiqure 9-6 (Paqe 1 of 1) 31 DEC 2000 Figure 9-7 (Page 1 of 2) 31 DEC 2017 Fiqure 9-7 (Page 2 of 2) 31 DEC 2017 Figure 9-8 (Page 1 of 1) 31 DEC 2000 Figure 9-9 (Page 1 of 1) 31 DEC 2000 Figure 9-10 (Page 1 of 1) 31 DEC 2016 Figure 9-11 (Page 1 of 1) 31 DEC 2017 FiQure 9-12 (Paqe 1 of 1) 31 DEC 2015 FiQure 9-13 (Paqe 1 of 1) 31 DEC 2000 Figure 9-14 (Page 1 of 1) 31 DEC 2000 Fiqure 9-15 (Paqe 1 of 1) 31 DEC 2003 Figure 9-16 (Page 1 of 1) 31 DEC 2007 Figure 9-17 (Page 1 of 1 ) 31 DEC 2015 Figure 9-18 (Paqe 1 of 1) 31 DEC 2017 Figure 9-19 (Page 1 of 1 ) 31 DEC 2004 Figure 9-20 (Page 1 of 1 ) 31 DEC 2004 Figure 9-21 (Page 1 of 1) 31 DEC 2001 Figure 9-22 (Page 1 of 1) 31 DEC 2000 Attachment 2 - Page 39 of 55

Oconee Nuclear Station Updated Final Safety Analysis Report 2017 List of Effective Pages Page Effective Date Fiqure 9-23 (Paqe 1 of 1 ) 31 DEC 2000 Figure 9-24 (Page 1 of 1) 31 DEC 2016 Figure 9-25 (Page 1 of 1) 31 DEC 2000 Fiqure 9-26 (PaQe 1 of 1) 31 DEC 2000 Figure 9-27 (Page 1 of 1) 31 DEC 2011 Figure 9-28 (Page 1 of 1) 31 DEC 2001 Figure 9-29 (Page 1 of 1) 31 DEC 2000 Figure 9-30 (Page 1 of 1) 31 DEC 2013 Fiqure 9-31 (Paqe 1 of 1) 31 DEC 2013*.

Figure 9-32 (Page 1 of 1 ) 31 DEC 2013 Figure 9-33 (Page 1 of 1) 31 DEC 2013 Figure 9-34 (Page 1 of 1) 31 DEC 2013 Figure 9-35 (Page 1 of 1) 31 DEC 2000 Fiqure 9-36 (PaQe 1 of 1) 31 DEC 2013 Fiqure 9-37 (Page 1 of 1) 31 DEC 2013 Fiqure 9-38 (Page 1 of 1) 31 DEC 2013 Figure 9-39 (Page 1 of 1) 31 DEC 2000 Figure 9-40 (Page 1 of 1) 31 DEC 2013 Figure 9-41 (Page 1 of 1) 31 DEC 2000 Figure 9-42 (Page 1 of 1) 31 DEC 2000 Figure 9-43 (Page 1 of 1 ) 31 DEC 2000 Fiqure 9-44 (Paqe 1 of 1) 31 DEC 2015 Figure 9-45 (Page 1 of 1) 31 DEC 2015 Fiqure 9-46 (Page 1 of 1 ) 31 DEC 2015 Chapter 10 10-i 31 DEC 2017 10-ii 31 DEC 2017 10-iii 31 DEC 2017 10-iv 31 DEC 2017 10.0-1 31 DEC 2017 10.0-2 31 DEC 2017 10.1-1 31 DEC 2017 10.1-2 31 DEC 2017 10.2-1 31 DEC 2017 10.2-2 31 DEC 2017 10.2-3 31- DEC 2017 10.2-4 31 DEC 2017 10.3-1 31 DEC 2017 10.3-2 31 DEC 2017 10.3-3 31 DEC 2017 10.3-4 31 DEC 2017 Attachment 2 - Page 40 of 55

Oconee Nuclear Station Updated Final Safety Analysis Report 2017 List of Effective Pages Page Effective Date 10.3-5 31 DEC 2017 10.3-6 31 DEC 2017 10.4-1 31 DEC 2017 10.4-2 31 DEC 2017 10.4-3 31 DEC 2017 10.4-4 31 DEC 2017 10.4-5 31 DEC 2017 10.4-6 31 DEC 2017 10.4-7 31 DEC 2011-10.4-8 31 DEC 2017 10.4-9 31 DEC 2017 10.4-10 31 DEC 2017 10.4-11 31 DEC 2017 10.4-12 31 DEC 2017 10.4-13 31 DEC 2017 10.4-14 31 DEC 2017 10.4-15 31 DEC 2017 10.4-16 31 DEC 2017 10.4-17 31 DEC 2017 10.4-18 31 DEC 2017 10.4-19 31 DEC 2017 10.4-20 31 DEC 2017 10.4-21 31 DEC 2017 10.4-22 31 DEC 2017 10.4-23 31 DEC 2017 10.4-24 31 DEC 2017 Chapter 10 Tables Table 10-1 (Paqe 1 of 1) 31 DEC 2000 Table 10-2 (Page 1 of 1) 31 DEC 2009 Chapter 10 Figures Figure 10-1 (Page 1 of 1) 31 DEC 2007 Figure 10-2 (Paqe 1 of 1) 31 DEC 2015 Figure 10-3 (Page 1 of 1) 31 DEC 2000 Figure 10-4 (Page 1 of 1) 31 DEC2015 Figure 10-5 (Page 1 of 1) 31*DEC 2000 Figure 10-6 (Page 1 of 1) 31 DEC 2007 Figure 10-7 (Page 1 of 1) 31 DEC 2015 Figure 10-8 (Page 1 of 1) 31 DEC 2015 Figure 10-9 (Page 1 of 2) 31 DEC 2004 Figure 10-9 (Page 2 of 2) 31 DEC 2004 Attachment 2 - Page 41 of 55

Oconee Nuclear Station Updated Final Safety Analysis Report 2017 List of Effective Pages Page Effective Date Chapter 11 11-i 31 DEC 2017 11-ii 31 DEC 2017 11-iii 31 DEC 2017 11-iv 31 DEC 2017 11.0-1 31 DEC 2017 11.0-2 31 DEC 2017 11.1 31 DEC 2017 11.1-2 31 DEC 2017 11.2-1 31 DEC 2017 11.2-2 31 DEC 2017 11.2-3 31 DEC 2017 11.2-4 31 DEC 2017 11.3-1 31 DEC 2017 11.3-2 31 DEC 2017 11.3-3 31 DEC 2017 11.3-4 31 DEC 2017 11.4-1 31 DEC 2017 11.4-2 31 DEC 2017 11.5-1 31 DEC 2017 11.5-2 31 DEC 2017 11.5-3 31 DEC 2017 11.5-4 31 DEC 2017 11.5-5 31 DEC 2017 11.B-6 31 DEC 2017 11.6-1 31 DEC 2017 11.6-2 31 DEC 2017 11.6-3 31 DEC 2017 11.6-4 31 DEC 2017 11.6-5 31 DEC 2017 11.6-6 31 DEC 2017 11.6-7 31 DEC 2017 11.6-8 31 DEC 2017 11.6-9 31 DEC 2017 11.6-10 31 DEC 2017 11.6-11 31 DEC 2017 11.5-12 31 DEC 2017 11.7-1 31 DEC 2017 11.7-2 31 DEC 2017 11.8-1 31 DEC 2017 11.8-2 31 DEC 2017 Attachment 2 - Page 42 of 55

Oconee Nuclear Station Updated Final Safety Analysis Report 2017 List of Effective Pages Page Effective Date Chapter 11 Tables ITable 11-1 (Page 1 of 1) 31 DEC 2000 rrable 11-2 (PaQe 1 of 1) 31 DEC 2000 rrable 11-3 (PaQe 1 of 1) 31 DEC 2000 rrable 11-4 (Page 1 of 1) 31 DEC 2004 ITable 11-5 (Page 1 of 2) 31 DEC 2000 ITable 11-5 (Page 2 of 2) 31 DEC 2000

!Table 11-6 (Page 1 of 7) 31 DEC 2012 Table 11-6 (Page 2 of 7) 31 DEC 2012 Table 11-6 (Page 3 of 7) 31 DEC 2012 Table 11-6 (Page 4 of 7) 31 DEC 2012 Table 11-6 (Page 5 of 7) 31 DEC 2012 Table 11-6 (Page 6 of 7) 31 DEC 2012 Table 11-6 (Page 7 of 7) 31 DEC 2012 Table 11-7 (Page 1 of 4) 31 DEC 2004 Table 11-7 (PaQe 2 of 4) 31 DEC 2004 Table 11-7 (Page 3 of 4) 31 DEC 2004 Table 11-7 (Page 4 of 4) 31 DEC 2004 Chapter 11 Figures Fiqure 11-1 (PaQe 1 of 1) 31 DEC 2000 Figure 11-2 (Page 1 of 1) 31 DEC 2000 Fiqure 11-3 (PaQe 1 of 1) 31 DEC 2000 Figure 11-4 (Page 1 of 1) 31 DEC 2011 Figure 11-5 (Page 1 of 1) 31 DEC 2000 Fiqure 11-6 (PaQe 1 of 1) 31 DEC 2000 Chapter 12 12-i 31 DEC 2017 12-ii 31 DEC 2017 12.0-1 31 DEC 2017 12.0-2 31 DEC 2017 12.1-1 31 DEC 2017 12.1-2 31 DEC 2017 12.1-3 31 DEC 2017 12:1-4 31 DEC 2017 12.2-1 31 DEC 2017 12.2-2 31 DEC 2017 12.3-1 31 DEC 2017 12.3-2 31 DEC 2017 12.3-3 31 DEC 2017 Attachment 2 - Page 43 of 55

Oconee Nuclear Station Updated Final Safety Analysis Report 2017 List of Effective Pages Page Effective Date 12.3-4 31 DEC 2017 12.4-1 31 DEC 2017 12.4-2 31 DEC 2017 12.4-3 31 DEC 2017 12.4-4 31 DEC 2017 12.4-5 31 DEC 2017 12.4-6 31 DEC 2017 12.4-7 31 DEC 2017 12.4-8 31 DEC 2017 12.4-9 31 DEC 2017 12.4-10 31 DEC 2017 Chapter 12 Tables Table 12-1 (Page 1 of 1) 31 DEC 2000 Table 12-2 (Page 1 of 2) 31 DEC 2000 Table 12-2 (Page 2 of 2) 31 DEC 2000 Table 12-3 (Paqe 1 of 2) 31 DEC 2004 Table 12-3 (Page 2 of 2) 31 DEC 2004 Chapter 12 Figures No Figures in Chapter 12 Chapter 13 13-i 31 DEC 2017 13-ii 31 DEC 2017 13-iii 31 DEC 2017 13-iv 31 DEC 2017 13.0-1 31 DEC 2017 13.0-2 31 DEC 2017 13.1-1 31 DEC 2017 13.1-2 31 DEC 2017 13.1-3 31 DEC 2017 13.1-4 31 DEC 2017 13.1-5 31 DEC 2017 13.1-6 31 DEC 2017 13.1-7 31 DEC 2017 13.1-8 31 DEC 2017 13.2-1 31 DEC 2017 13.2-2 31 DEC 2017 13.2-3 31 DEC 2017 13.2-4 31 DEC 2017 13.2-5 31 DEC 2017 Attachment 2 - Page 44 of 55

Oconee Nuclear Station Updated Final Safety Analysis Report 2017 List of Effective Pages Page Effective Date 13.2-6 31 DEC 2017 13.2-7 31 DEC 2017 13.2-8 31 DEC 2017 13.3-1 31 DEC 2017 13.3-2 31 DEC 2017 13.4-1 31 DEC 2017 13.4-2 31 DEC 2017 13.5-1 31 DEC 2017 13.5-2 31 DEC 2017 13.5-3 31 DEC 2017 13.5-4 31 DEC 2017 13.5-5 31 DEC 2017 13.5-6 31 DEC 2017 13.5-7 31 DEC 2017 13.5-8 31 DEC 2017 13.6-1 31 DEC 2017 13.6-2 31 DEC 2017 Chapter 13 Tables rrable 13-1 (Page 1 of 1) 31 DEC 2000 rr able 13-2 (Page 1 of 1 ) 31 DEC 2000 Chapter 13 Figures Figure 13-1 (Page 1 of 1) 31 DEC 2014 Figure 13-2 (Page 1 of 1) 31 DEC 2000 Figure 13-3 (Page 1 of 1 ) 31 DEC 2014 Figure 13-4 (Page 1 of 1) 31 DEC 2014 Figure 13-5 (Page 1 of 1) 31 DEC 2000 Figure 13-6 (Page 1 of 1) 31 DEC 2000 Fiqure 13-7 (Paqe 1 of 1) 31 DEC 2012 Figure 13-8 (Page 1 of 1 ) 31 DEC 2014 Chapter 14 14-i 31 DEC 2017 14-ii 31 DEC 2017 14.0-1 31 DEC 2017 14.0-2 31 DEC 2017 14.1-1 31 DEC 2017 14.1-2 31 DEC 2017 14.1-3 31 DEC 2017 14.1-4 31 DEC 2017 14.2-1 31 DEC 2017 Attachment 2 - Page 45 of 55

Oconee Nuclear Station Updated Final Safety Analysis Report 2017 List of Effective Pages Page Effective Date 14.2-2 31 DEC 2017 14.3-1 31 DEC 2017 14.3-2 31 DEC 2017 14.4-1 31 DEC 2017 14.4-2 31 DEC 2017 14.5-1 31 DEC 2017 14.5-2 31 DEC 2017 14,6-1 31 DEC 2017 14.6-2 31 DEC 2017 Chapter 14 Tables Table 14-1 (Page 1 of 1) 31 DEC 2000 Table 14-2 (Page 1 of 1) 31 DEC 2000 Chapter 14 Figures No Fi~ures in Chapter 14 Chapter 15 15-i 31 DEC 2017 15-ii 31 DEC 2017 15-iii 31 DEC 2017 15-iv 31 DEC 2017 15-v 31 DEC 2017 15-vi 31 DEC 2017 15-vii 31 DEC 2017 15-viii 31 DEC 2017 15-ix 31 DEC 2017 15-x 31 DEC 2017 15-xi 31 DEC 2017 15-xii 31 DEC 2017 15-xiii 31 DEC 2017 15-xiv 31 DEC 2017 15-xv 31 DEC 2017 15-xvi 31 DEC 2017 15-xvii 31 DEC 2017 15.0-1 31 DEC 2017 15.0-2 31 DEC 2017 15.1-1 31 DEC 2017 15.1-2 31 DEC 2017 15.1-3 31 DEC 2017 15.1-4 31 DEC 2017 15.1-5 31 DEC 2017 Attachment 2 - Page 46 of 55

Oconee Nuclear Station Updated Final Safety Analysis Report 2017 List of Effective Pages Page Effective Date 15.1-6 31 DEC 2017 15.1-7 31 DEC 2017 15.1-8 31 DEC 2017 15.1-9 31 DEC 2017 15.1-10 31 DEC 2017 15.1-11 31 DEC 2017 15.1-12 31 DEC 2017 15.2-1 31 DEC 2017 15.2-2 31 DEC 2017 15.3-1 31 DEC 2017 15.3-2 31 DEC 2017 15.4-1 31 DEC 2017 15.4-2 31 DEC 2017 15.5-1 31 DEC 2017 15.5-2 31 DEC 2017 15.6-1 31 DEC 2017 15.6-2 31 DEC 2017 15.6-3 31 DEC 2017 15.6-4 31 DEC 2017 15.6-5 31 DEC 2017 15.6-6 31 DEC 2017 15.7-1 31 DEC 2017 15.7-2 31 DEC 2017 15.8-1 31 DEC 2017 15.8-2 31 DEC 2017 15.9-1 31 DEC 2017 15.9-2 31 DEC 2017 15.9-3 31 DEC 2017 15.9-4 31 DEC 2017 15.9-5 31 DEC 2017 15.9-6 31 DEC 2017 15.10-1 31 DEC 2017 15.10-2 31 DEC 2017 15.11-1 31 DEC 2017 15.11-2 31 DEC 2017 15.11-3 31 DEC 2017 15.11-4 31 DEC 2017 15.11-5 31 DEC 2017 15.11-6 ~1 DEC 2017 15.12-1 31 DEC 2017 15.12-2 31 DEC 2017 15.12-3 31 DEC 2017 Attachment 2 - Page 47 of 55

Oconee Nuclear Station Updated Final Safety Analysis Report 2017 List of Effective Pages Page Effective Date 15.12-4 31 DEC 2017 15.13-1 31 DEC 2017 15.13-2 31 DEC 2017 15.13-3 31 DEC 2017 15.13-4 31 DEC 2017 15.13-5 31 DEC 2017 15.13-6 31 DEC 2017 15.14-1 31 DEC 2017 15.14-2 31 DEC 2017 15.14-3 31 DEC 2017 15.14-4 31 DEC 2017 15.14-5 31 DEC 2017 15.14-6 31 DEC 2017 15.14-7 31 DEC 2017 15.14-8 31 DEC 2017 15.14-9 31 DEC 2017 15.14-10 31 DEC 2017 15.14-11 31 DEC 2017 15.14-12 31 DEC 2017 15.14-13 31 DEC 2017 15.14-14 31 DEC 2017 15.14-15 31 DEC 2017 15.14-16 31 DEC 2017 15.14-17 31 DEC 2017 15.14-18 31 DEC 2017 15.14-19 31 DEC 2017 15-14-20 31 DEC 2017 15-14-21 31 DEC 2017 15-14-22 31 DEC 2017 15.15-1 31 DEC 2017 15.15-2 31 DEC 2017 15.15-3 31 DEC 2017 15.15-4 31 DEC 2017 15.16-1 31 DEC 2017 15.16-2 31 DEC 2017 15.16-3 31 DEC 2017 15.16-4 31 DEC 2017 15.16-5 31 DEC 2017 15.16-6 31 DEC 2017 15.16-7 31 DEC 2017 15.16-8 31 DEC 2017 15.17-1 31 DEC 2017 Attachment 2 - Page 48 of 55

Oconee Nuclear Station Updated Final Safety Analysis Report 2017 List of Effective Pages Page Effective Date 15.17-2 31 DEC 2017 15.17-3 31 DEC 2017 15.17-4 31 DEC 2017 15.18-1 31 DEC 2017 15.18-2 31 DEC 2017 Chapter 15 Tables Table 15-1 (Page 1 of 1) 31 DEC 2016 Table 15-2 (Page 1 of 1) 31 DEC 2013 Table 15-3 (Page 1 of 1) 31 DEC 2008 Table 15-4 (Page 1 of 1) 31 DEC 2004 Table 15-5 (Page 1 of 1)

  • 31 DEC 2003 Table 15-6 (Page 1 of 1) 31 DEC 2000 Table 15-7 14 (Page 1 of 1) 31 DEC 2000 Table 15-15 (Page 1 of 4) 31 DEC 2012 Table 15-15 (Page 2 of 4) 31 DEC 2012 Table 15-15 (Page 3 of 4) 31 DEC 2012 rrable 15-15 (Page 4 of 4) 31 DEC 2012 Table 15-16 (Page 1 of 2) 31 DEC 2016 Table 15-16 (Page 2 of 2) 31 DEC 2016 Table 15-17 27 (Page 1 of 1) 31 DEC 2000

!Table 15-28 (Paqe 1 of 1) 31 DEC 2015 rrable 15-29 (Page 1 of 1) 31 DEC 2015 Table 15-30 (Page 1 of 1) 31 DEC 2015 Table 15-31 (Page 1 of 1) 31 DEC 2008

!Table 15-32 (Page 1 of 2) 31 DEC 2015

!Table 15-32 (Page 2 of 2) 31 DEC 2015

!Table 15-33 (Page 1 of 1) 31 DEC 2013

!Table 15-34 (Page 1 of 8) 31 DEC 2016

!Table 15-34 (Page 2 of 8) 31 DEC 2016

!Table 15-34 (Paqe 3 of 8) 31 DEC 2016 rrable 15-34 (Page 4 of 8) 31 DEC 2016 rrable 15-34 (Page 5 of 8) 31 DEC 2016 Table 15-34 (Page 6 of 8) 31 DEC 2016 Table 15-34 (Page 7 of 8) 31 DEC 2016 Table 15-34 (Page 8 of 8) 31 DEC 2016 Table 15-35 (Page 1 of 2) 31 DEC 2016 Table 15-35 (Page 2 of 2) 31 DEC 2016 Table 15-36 (Page 1 of 1) 31 DEC 2013 Table 15-37 (Paqe 1 of 1) 31 DEC 2008 Table 15-38 (Page 1 of 1) 31 DEC 2003 Table 15-39 (Page 1 of 1) 31 DEC 2015 Attachment 2 - Page 49 of 55

Oconee Nuclear Station Updated Final Safety Analysis Report 2017 List of Effective Pages Page Effective Date rrable 15-40 (Page 1 of 1) 31 DEC 2008 rrable 15-41 (Page 1 of 1) 31 DEC 2003 rrable 15-42 (Page 1 of 1) 31 DEC 2003

!fable 15-43 (Page 1 of 1) 31 DEC 2003 rrable 15-44 (Page 1 of 1) 31 DEC 2008 Table 15-45 (Page 1 of 1) 31 DEC 2010 Table 15-46 (Page 1 of 1) 31 DEC 2013 Table 15-47 (Page 1 of 1) 31 DEC 2011 Table 15-48 (Page 1 *of 1) 31 DEC 2003 Table 15-49 (Page 1 of 1) 31 DEC 2016 Table 15-50 (Page 1 of 2) 31 DEC 2009 Table 15-50 (Page 2 of 2) 31 DEC 2009 Table 15-51 (Paqe 1 of 1) 31 DEC 2009 Table 15 15-55 (Page 1 of 1) 31 DEC 2003 Table 15-56 (Page 1 of 1) 31 DEC 2014 Table 15-57 (Page 1 of 1) 31 DEC 2014 Table 15-58 (Page 1 of 1) 31 DEC 2003 Table 15-59 (Page 1 of 1) 31 DEC 2001 Table 15-60 (Paqe 1 of 1) 31 DEC 2014 Table 15-61 (Page 1 of 2) 31 DEC 2009 Table 15-61 (Page 2 of 2) 31 DEC 2009 Table 15-62 (Page 1 of 2) 31 DEC 2014 Table 15-62 (Page 2 of 2) 31 DEC 2014 Table 15-63 (Page 1 of 2) 31 DEC 2014 Table 15-63 (Paqe 2 of 2) 31 DEC 2014 Table 15-64 (Page 1 of 1) 31 DEC 2011 Table 15-65 (Page 1 of 1) 31 DEC 2012 Table 15-66 (Page 1 of 1) 31 DEC 2012 Table 15-67 (Page 1 of 1) 31 DEC 2014 Table 15-68 (Page 1 of 2) 31 DEC 2014 Table 15-68 (Paqe 2 of 2) 31 DEC 2014 Chapter 15 Figures Figure 15-1 (Paqe 1 of 1) 31 DEC 2013 Figure 15-2 (Page 1 of 1) 31 DEC2013 Figure 15-3 (Page 1 of 1) 31 DEC 2013 Figure 15-4 (Page 1 of 1) 31 DEC 2013 Figure 15-5 (Paqe 1 of 1) 31 DEC2013 Figure 15-6 (Page 1 of 1) 31 DEC 2013 Figure 15 15-10 (Page 1 of 1) 31 DEC 2000 Figure 15-11 (Page 1 of 1) 31 DEC 2003 Figure 15-12 (Page 1 of 1) 31 DEC 2003 Attachment 2 - Page 50 of 55

Oconee Nuclear Station Updated Final Safety Analysis Report 2017 List of Effective Pages Page Effective Date Figure 15-13 (Page 1 of 1) 31 DEC 2003 Fiqure 15-14 (Paqe 1 of 1) 31 DEC 2003 Figure 15-15 (Page 1 of 1) 31 DEC 2003 Figure 15-16 (Paqe 1 of 1) 31 DEC 2003 Figure 15-17 (Page 1 of 1) 31 DEC 2003 Figure 15-18 (Page 1 of 1) 31 DEC 2015 Figure 15-19 (Page 1 of 1) 31 DEC 2008 Figure 15-20 (Page 1 of 1) 31 DEC 2008 Figure 15-21 (Page fof 1) 31 DEC 2008 Figure 15-22 (Page 1 of 1) 31 DEC 2008 Figure 15-23 (Page 1 of 1) 31 DEC 2008 Figure 15-24 (Page 1 of 1) 31 DEC2013 Figure 15-25 (Page 1 of 1) 31 DEC 2003 Fiqure 15-26 (Paqe 1 of 1) 31 DEC 2010 Figure 15-27 (Page 1 of 1) 31 DEC 2010 Figure 15-28 (Page 1 of 1) 31 DEC 2010 Figure 15-29 (Page 1 of 1) 31 DEC 2013 Figure 15-30 (Page 1 of 1) 31 DEC 2013 Figure 15-31 (Page 1 of 1) 31 DEC 2013 FiQure 15-32 (Page 1 of 1) 31 DEC 2013 Figure 15-33 (Paqe 1 of 1) 31 DEC 2013 Figure 15-34 (Page 1 of 1) 31 DEC2013 Figure 15-35 (Page 1 of 1) 31 DEC 2013 Figure 15-36 (Page 1 of 1) 31 DEC 2013 Figure 15 15-39 (Page 1 of 1) 31 DEC 2000 Figure 15-40 (Page 1 of 1) 31 DEC 2003 Figure 15-41 (Page 1 of 1) 31 DEC 2003 Figure 15-42 (Page 1 of 1) 31 DEC 2003 Figure 15-43 (Page 1 of 1) 31 DEC 2003 Figure 15-44 (Page 1 of 1) 31 DEC 2000 Figure 15 15-49 (Page 1 of 1) 31 DEC 2000 Figure 15-50 (Page 1 of 1) 31 DEC 2008 Figure 15 15-79 (Page 1 of 2) 31 DEC 2000 Figure 15 15-79 (Page 2 of 2) 31 DEC 2000 Figure 15-80 (Page 1 of 1) 31 DEC 2000 FiQure 15 15-88 (Paqe 1 of 1) 31 DEC 2000 FiQure 15-89 (Paqe 1 of 1) 31 DEC 2003 Fiqure 15 15-111 (Page 1 of 2) 31 DEC 2000 Figure 15 15-111 (Page 2 of 2) 31 DEC 2000 Figure 15-112 (Page 1 of 1) 31 DEC 2014 Figure 15-113 (Page 1 of 1) 31 DEC 2003 Figure 15-114 (Page 1 of 1) 31 DEC 2013 Attachment 2 - Page 51 of 55

Oconee Nuclear Station Updated Final Safety Analysis Report 2017 List of Effective Pages Page Effective Date Figure 15-115 (Page 1 of 1) 31 DEC 2015 Figure 15-116 (Page 1 of 1) 31 DEC 2015 Figure 15-117 (Page 1 of 1) 31 DEC 2015 Figure 15-118 (Page 1 of 1) 31 DEC 2015 Figure 15-119 (Page 1 of 1) 31 DEC 2003 Figure 15-120 (Page 1 of 1) 31 DEC 2003 Figure 15-121 (Page 1 of 1) 31 DEC 2003 Figure 15-122 (Page 1 of 1) 31 DEC 2003 Figure 15-123 (Page 1 of 1) 31 DEC 2013 Figure 15-124 (Page 1 of 1) 31 DEC 2003 Figure 15-125 (Page 1 of 1) 31 DEC 2003 Fiqure 15-126 (Page 1 of 1) 31 DEC 2003 Figure 15-127 (Page 1 of 1) 31 DEC 2003 Figure 15-128 (Page 1 of 1) 31 DEC 2003 Figure 15-129 (Page 1 of 1) 31 DEC 2013 Figure 15-130 (Page 1 of 1) 31 DEC 2003 Figure 15-131 (Page 1 of 1) 31 DEC 2003 Fiqure 15-132 (Page 1 of 1) 31 DEC 2003 Figure 15-133 (Page 1 of 1) 31 DEC 2003 Figure 15-134 (Page 1 of 1) 31 DEC 2003 Figure 15-135 (Page 1 of 1) 31 DEC 2008 Figure 15-136 (Page 1 of 1 ) 31 DEC 2008 Figure 15-137 (Page 1 of 1 ) 31 DEC 2008 Figure 15-138 (Page 1 of 1 ) 31 DEC 2008 Figure 15-139 (Page 1 of 1) 31 DEC 2008 Figure 15-140 (Page 1 of 1) 31 DEC 2008 Figure 15-141 (Page 1 of 1) 31 DEC 2011 Figure 15-142 (Page 1 of 1) 31 DEC 2000 Figure 15-143 (Page 1 of 1) 31 DEC 2010 Figure 15-144 (Page 1 of 1) 31 DEC 2013 Figure 15-145 (Page 1 of 1) 31 DEC 2013 Figure 15-146 (Page 1 of 1) 31 DEC 2013 Figure 15-147 (Page 1 of 1) 31 DEC 2013 Figure 15-148 (Page 1 of 1) 31 DEC 2013 Figure 15-149 (Page 1 of 1) 31 DEC 2013 Figure 15-150 (Page 1 of 1) 31 DEC 2011 Figure 15-151 (Page 1 of 1) 31 DEC 2011 Figure 15-152 (Page 1 of 1 ) 31 DEC 2011 Figure 15-153 (Page 1 of 1) 31 DEC 2011 Figure 15-154 (Paqe 1 of 1) 31 DEC 2011 Figure 15-155 (Page 1 of 1) 31 DEC 2011 Figure 15-156 (Page 1 of 1) 31 DEC 2011 Attachment 2 - Page 52 of 55

Oconee Nuclear Station Updated Final Safety Analysis Report 2017 List of Effective Pages Page Effective Date Fiqure 15-157 (Page 1 of 1) 31 DEC 2003 Fiqure 15-158 (Page 1 of 1) 31 DEC 2003 Figure 15-159 (Page 1 of 1) 31 DEC 2003 Figure 15-160 (Page 1 of 1) 31 DEC 2003 Fiqure 15-161 (Page 1 of 1) 31 DEC 2003 Figure 15-162 (Page 1 of 1) 31 DEC 2003 Figure 15-163 (Page 1 of 1) 31 DEC 2003 Figure 15-164 (Page 1 of 1) 31 DEC 2003 Fiqure 15-165 (Page 1 of 1) 31°-DEC 2003 Figure 15-166 (Page 1 of 1) 31 DEC 2003 Figure 15-167 (Page 1 of 1) 31 DEC 2013 Figure 15-168 (Page 1 of 1) 31 DEC 2016 Fiqure 15-169 (Paqe 1 of 1) 31 DEC 2016 Figure 15-170 (Page 1 of 1) 31 DEC 2016 Figure 15-171 (Page 1 of 1) 31 DEC 2016 Figure 15-172 (Page 1 of 1) 31 DEC 2016 Figure 15-173 (Page 1 of 1) 31 DEC 2016 Figure 15-174 (Page 1 of 1) 31 DEC 2014 Figure 15-175 (Paqe 1 of 1) 31 DEC 2003 Figure 15-176 (Page 1 of 1) 31 DEC 2001 Figure 15-177 (Page 1 of 1) 31 DEC 2003 Figure 15-178-15-212 (Page 1 of 2) 31 DEC 2014 Figure 15-178-15-212 (Page 2 of 2) 31 DEC 2014 Fiqure 15-213 (Page 1 of 1) 31 DEC 2015 Figure 15-214 (Page 1 of 1) 31 DEC 2015 Figure 15-215 (Page 1 of 1) 31 DEC 2015 Figure 15-216 (Page 1 of 1) 31 DEC 2015 Figure 15-217 (Page 1 of 1) 31 DEC 2015 Figure 15-218 (Page 1 of 1) 31 DEC 2015 Figure 15-219 (Page 1 of 1) 31 DEC 2011 Figure 15-220 (Page 1 of 1) 31 DEC 2011 Figure 15-221 (Page 1 of 1) 31 DEC 2011 Figure 15-222 (Page 1 of 1) 31 DEC 2011 Figure 15-223 (Page 1 of 1) 31 DEC 2011 Figure 15-224 (Paqe 1 of 1) 31 DEC 2011 Figure 15-225 (Page 1 of 1) 31 DEC 2011 Figure 15-226 (Page 1 of 1) 31 DEC 2011 Figure 15-227 (Page 1 of 1) 31 DEC 2011 Figure 15-228 (Page 1 of 1) 31 DEC 2011 Figure 15-229 (Page 1 of 1) 31 DEC 2011 Figure 15-230 (Page 1 of 1) 31 DEC 2011 Figure 15-231 (Page 1 of 1) 31 DEC 2011 Attachment 2 - Page 53 of 55

Oconee Nuclear Station Updated Final Safety Analysis Report 2017 List of Effective Pages Page Effective Date Figure 15-232 (Page 1 of 1) 31 DEC 2011 Chapter 16 16-i 31 DEC 2017 16.0-1 31 DEC 2017 16.0-2 31 DEC 2017 Chapter 17 17-i 31 DEC 2017 17.0-1 31 DEC 2017 17.0-2 31 DEC 2017 Chapter 18 18-i 31 DEC 2017 18-ii 31 DEC 2017 18-iii 31 DEC 2017 18.0-1 31 DEC 2017 18.0-2 31 DEC 2017 18.1-1 31 DEC 2017 18.1-2 31 DEC 2017 18.2-1 31 DEC 2017 18.2-2 31 DEC 2017 18.2-3 31 DEC 2017 18.2-4 31 DEC 2017 18.2-5 31 DEC 2017 18.2-6 31 DEC 2017 18.2-7 31 DEC 2017 18.2-8 31 DEC 2017 18.2-9 31 DEC 2017 18.2-10 31 DEC 2017 18.2-11 31 DEC 2017 18.2-12 31 DEC 2017 18.3-1 31 DEC 2017 18.3-2 31 DEC 2017 18.3-3 31 DEC 2017 18.3-4 31 DEC 2017 18.3-5

  • 31 DEC 2017 18.3-6 31 DEC 2017 18.3-7 31 DEC 2017 18.3-8 31 DEC 2017 18.3-9 31 DEC 2017 18.3-10 31 DEC 2017 Attachment 2 - Page 54 of 55

Oconee Nuclear Station Updated Final Safety Analysis Report 2017 List of Effective Pages Page Effective Date 18.3-11 31 DEC 2017 18.3-12 31 DEC 2017 18.3-13 31 DEC 2017 18.3-14 31 DEC 2017 18.3-15 31 DEC 2017 18.3-16 31 DEC 2017 18.3-17 31 DEC 2017 18.3-18 31 DEC 2017 18-.3-19 31 DEC 2017 18.3-20 31 DEC 2017 18.3-21 31 DEC 2017 18.3-22 31 DEC 2017 18.3-23 31 DEC 2017 18.3-24 31 DEC 2017 18.3-25 31 DEC 2017 18.3-26 31 DEC 2017 18.3-27 31 DEC 2017 18.3-28 31 DEC 2017 18.3-29 31 DEC 2017 18.3-30 31 DEC 2017 18.3-31 31 DEC 2017 18.3-32 31 DEC 2017 18.3-33 31 DEC 2017 18.3-34 31 DEC 2017 18.3-35 31 DEC 2017 18.3-36 31 DEC 2017 18.4-1 31 DEC 2017 18.4-2 31 DEC 2017 Chapter 18 Tables rfable 18-1 (Paqe 1 of 4) 31 DEC 2014 n-able 18-1 (Page 2 of 4) 31 DEC 2014 rfable 18-1 (Page 3 of 4) 31 DEC 2014 n-able 18-1 (Page 4 of 4) 31 DEC 2014 Attachment 2 - Page 55 of 55

ONS 2018-026 Document Control Desk June 29, 2018 Attachment 3 Update Insertion Instructions .

For Hard Copy Distribution Only

Update Insertion Instructions (for hardcopy distribution only)

1. Replace 2016 List of Effective Pages (LOEP) for Tables and Figures with the 2017 Tables and Figures.
2. Replace entire text portions for each chapter with the updated text portion (including the Table of Contents, List of Figures, and List of Tables).

3 .. Update Tables and Figures according to the instructions below:

  • Remove Insert Chapter 1 Figure 1-8 (2000) Figure 1-8 (2017)

Chapter 3 Table 3-68 (2016) Table 3-68 (2017)

Chapter 5 Figure 5-6 (2004) Figure 5-6 (2017)

Chapter 6 Table 6-22 (2013) Table 6-22 (2017)

Table 6-24 (2013) Table 6-24 (2017)

Table 6-25 (2013) Table 6-25 (2017)

Table 6-31 (2013) Table 6-31 (2017)

Figure 6-3 (2006) Figure 6-3 (2017)

Chapter 8 Figure 8-5 (2013) Figure 8-5 (2017)

Chapter 9 Table 9-6 (2011) Table 9-6 (2017)

Figure 9-5 (2015) Figure 9-5 (2017)

Figure 9-7 (2000) Figure 9-7 (2017)

Figure 9-11 {2016) Figure 9-11 {2017)

Figure 9-18 (2000) Figure 9-18 (2017)

Attachment 3 - Pag~ 1. of 1

ONS 2018-026 Document Control Desk June 29, 2018 Attachment 4 List of Removed Items

List of Removed Items

1. Section 9.6.3.1 - Flood Design Redundant information was removed relating to design basis information. Clarifications were made throughout the paragraph to simplify the text and correct errors. (Change Package 17-002)
2. Section 13.1.3.1- Minimum Qualification Requirements Removed descriptions of specific positions which are in accordance with descriptions contained in ANSI/ANS 3.1-1978 (committed document of record) and/ or those which are described in ONS Technical Specifications, Amendments 389, 391, and 390 issued 02/12/2015. (Change Package 17-017)
3. Section 3.8.1.4.2(3)(c) - Nonaxisymmetric Analysis Removed conflicting temperature limits for the Main Steam penetrations. Temperature limits associated with penetration fan capability were removed and only those limits associated with the containment design basis as specified in Criterion 3.1.49 remain in place.

(Change Package 17-018)

Attachment 4 - Page 1 of 1

ONS 2018-026 Document Control Desk June 29, 2018 Attachment 5 10 CFR 50.59 Summary Report

Oconee Nuclear Station 10 CFR 50.59 Summary Report

Title:

Update Four Software Applications Used in Reload Reactor Core (AR 02081820)

Summary:

Four software applications (computer codes) used in reload reactor core design and safety analysis for Oconee Nuclear Station (ONS) were updated to more recent versions supplied by software vendor Studsvik Scandpower. The current versions and the updated versions are shown in the table below. SIMULATE-3K is a transient version of the steady-state SIMULATE-3 software application.

Current Vendor Updated Vendor Application Version Version CASM0-4 2.05.07 2.05.17 CMS-LINK 1.16.13 DUKE 1..27.04 DUKE SIMULATE-3 6.07.09 MOX 4 6.09.33 DUK 1 SIMULATE- 2.03.07 DUKE 2.05.00- DUKE- 1 3K This evaluation only covered the use of these four software applications for reload design and safety analyses in the Nuclear General Office (NGO) Nuclear Fuel Engineering (NFE) division. Note that the SIMULATE-3 software will be used in the GARDEL core monitoring software application currently in the Engineering Change (EC) process for installation at Oconee Nuclear Station (ONS). However, the use of SIMULATE-3 in GARDEL will be addressed in a separate 10 CFR 50.59 screen/evaluation.

No revision to the Oconee UFSAR, Tech Specs or Selected Licensee Commitments was required.

The proposed activity was determined to consist solely of changes to methods of evaluation.

Therefore, the proposed activity does not require evaluation against the criteria in 10 CFR 50.59( c )(2)(i-vii).

None of the four updated software applications were new or different methods of evaluation.

All of them were modifications to existing, approved methods of evaluation.

The justification to Question 8 showed that the results from the updated versions of the four software applications were essentially the same as the results from the earlier versions approved by the NRC in methodology reports DPC-NE-1006-PA and DPC-NE-3005-PA. A calculation file was written specifically to document the comparison of the results of the different software versions and to facilitate the justification. Therefore, no License Amendment was required.

Attachment 5 - Page 1 of 7

Oconee Nuclear Station 10 CFR 50.59 Summary Report

Title:

Changes to Oconee UFSAR Sectfon 6.2 Due to Revised Calculations and Additional Reactor Building Cooling Unit Performance Data (AR 02083283)

Summary:

This activity involves changes to Oconee UFSAR Section 6.2.1.1.3. These changes are required to implement new safety analyses which incorporate changes to core decay heat reflecting 24-month fuel cycles, as well as changes to Reactor Building Cooling Unit (RBCU) performance data. The analysis results show the long-term containment pressure and temperature profiles for the limiting large-break Loss of Coolant Accident (LOCA).

The revised safety analyses for long-term LOCA containment response were performed using the NRG-approved analytical methodologies documented in Duke Energy methodology report DPC-NE-3003-PA. The containment pressure and temperature profiles are used as input for separate analyses to demonstrate certain equipment located in the Oconee Reactor Building which is required to mitigate the effects of a LOCA meet their environmental qualification (EQ) requirements, as described in the Oconee Environmental Qualification Manual (EQCM). However, all input values are bounded by Oconee Technical Specification values and other limiting documents (such as test acceptance criteria). These EQ analyses demonstrate that the equipment continues to meet all applicable EQ criteria.

The activity does not require any change to the Oconee Technical Specifications, Technical Specification Bases, or Selected Licensee Commitments. The Selected Licensee Commitments Manual was reviewed for impact. No Selected Licensee Commitments are impacted by this activity.

The proposed changes to Oconee UFSAR Section 6.2.1.1.3 have been evaluated under 10 CFR 50.59, and can be implemented without prior NRC approval.

Attachment 5 - Page 2 of 7

Oconee Nuclear Station 10 CFR 50.59 Summary Report

Title:

EC112284 (Rev 006) 230KV YELLOW BUS DIFFERENTIAL UPGRADE (AR 02089921)

Summary:

In response to North American Electric Reliability Corporation (NERC) Standards, Oconee Nuclear Station (ONS) has performed upgrades to the Differential Protective Relaying for the Yellow Bus in the ONS 230 kV switchyard. The Yellow Bus is considered safety related because it provides an emergency power path from the Keowee Hydro Station to the ONS emergency busses. A new train of Differential Protective Relaying has been added that consists of Differential Protective Relays, lockout relays, auxiliary relays, a test block, and trip indicating relays. As a part of this modification, the lockout relay in the existing Differential Protective Relay train was replaced with a qualified, equivalent lockout relay.

The new Differential Protective Relay train uses the same lockout relay. A second Differential Protective Relay train was added to eliminate a single point of protection (Single Point Vulnerability or SPV) failure, and to improve the reliability of the ONS 230kV switchyard. With a single Differential Protective Relay train, a phase to ground fault with the failure of the single train of Differential Protective Relaying would result in the de-energization of the ONS 230 kV switchyard and loss of generation from the ONS, Jocassee Hydro Station, and Keowee Hydro Station to the grid through the ONS switchyard.

The addition of a second train of Differential Protective Relaying would ensure that with an assumed ground fault and a failure of one train of Differential Protective Relaying, the remaining Differential Protective Relaying train would isolate the Yellow Bus and not result in a loss of area generation. Isolation of the Yellow Bus would block the emergency power path from Keowee to the ONS emergency busses. A separate underground path from Keowee to the Oconee emergency busses would still be available. lnoperability of the Keowee overhead power path is addressed by the current ONS Technical Specifications.

EC 112284 implements additional Yellow Bus protection. Neither valid actuation nor inadvertent actuation of the Differential Protective Relaying trains result in a station blackout or other analyzed event. An inadvertent trip of either train of Differential Protective Relaying would cause a loss of the overhead Keowee path. However, the additional Differential Protective Relaying train does not result in more than a minimal increase in the likelihood of occurrence of a malfunction of an SSC important to safety. Consequences of accidents previously described in the UFSAR are not increased, nor will the addition of a second Differential Protective Relaying train increase accident dose consequences through a malfunction of an SSC important to safety previously evaluated in the UFSAR. These activities do not create the possibility for an accident of a different type than any previously evaluated in the UFSAR, nor do they create a possibility for a malfunction of an SSC important to safety with a different result than any previously evaluated in the UFSAR. No design basis for a fission product barrier as described in the UFSAR is being exceeded or altered, and these activities do not result in a departure from a method of evaluation described in the UFSAR used in establishing the design bases or in the safety analyses.

Attachment 5 - Page 3 of 7

Oconee Nuclear Station 10 CFR 50.59 Summary Report

Title:

EC112282 (Rev 10) 230KV Red Bus Differential Upgrade (AR 2089919)

Summary:

EC-112282 Rev. 000 adds a redundant train of Differential Relaying protection for the Red Bus in the ONS 230 kV Switchyard.

EC-112282 Rev.002 revised the original 10 CFR 50.59 Evaluation to include discussion of partial turnovers after installation of the second channel of differential relaying for each Red Bus PCB breaker. Editorial changes were made to Questions 1 and 2 responses. A statement was added to the response to Question 2 to evaluate no adverse impacts to the Switchyard DC system. The List of References was updated to include the latest revisions.

EC-112282 Rev.010 required an editorial revision to the revised 10 CFR 50.59 evaluation to clarify the use of the North American Electric Reliability Corporation (NERC) Standards related to eliminating single points of protection (Single Point Vulnerability or SPV) failures in protective relaying circuits. This change was reviewed and was found to fall within the boundary of the 10 CFR 50.59 scope for changes made to the ONS station that did not require prior NRC approval.

Attachment 5 - Page 4 of 7

Oconee Nuclear Station 10 CFR 50.59 Summary Report

Title:

Updates to UFSAR Section 15.15.5 and Tables 15-15 and 15-50 for New Source Term lsotopics (AR 02122012)

Summary:

The Oconee Updated Final Safety Analysis Report (UFSAR) (Section 15.15.5, Tables 15-15 and 15-50) is being updated to reflect new source term isotopics for the Maximum Hypothetical Accident (MHA) and Rod Ejection Accident (REA) dose analyses in Chapter 15.

These dose analyses and the corresponding source term isotopic calculati.on were revised to allow a higher end-of-cycle (EOC) core average burnup and revised power peaking factors to accommodate future core designs. These parameters are plant-specific inputs to the dose analyses. No changes to methodology were made. UFSAR-reported dose consequences did not increase. Therefore, it was concluded these UFSAR updates may be made without prior NRC approval.

Attachment 5 - Page 5 of 7

Oconee Nuclear Station 10 CFR 50.59 Summary Report

Title:

UFSAR Chapter 03 Change to Code of Record for 2 Reactor Building Penetrations (AR 02150552)

Summary:

Oconee UFSAR Section 3.8.1.5.4, Penetrations, is being revised to include the Main Steam and Feedwater Reactor Building penetrations (26/28 and 25/27 respectively) as being designed to ASME Section Ill, Subsections NC and NE, 1992 edition, including the 1992 addenda. A 50.59 Screen was performed under NCR 02150538. All Screen Questions were answered "No" with the exception of Question 3, which reads as follows: "Does the proposed activity involve revising or replacing an evaluation methodology described in the UFSAR that is used in establishing the design basis or used in the safety analysis." Question 3 on the 50.59 screen correlated to Question 8 in the 50.59 evaluation where the proposed activity can be evaluated to determine if the proposed activity has an adverse impact on the licensing basis, resulting in "a departur.e from a method of evaluation described in the UFSAR used in establishing the design bases or in the safety analyses."

Currently, UFSAR Section 3.8.1.5.4 states all penetrations (except 63 & 64) conform to applicable sections of ASA N6.2-1965 "Safety Standard for the Design, Fabrication, and Maintenance of Steel Containment Structures for Stationary Nuclear Power Reactors." ASA N6.2-1965 points to ASME Section Ill, 1963 for evaluation of containment penetrations.

Similar methodologies, such as elastic plastic analyses, are referenced by both ASA N6.2-1965 and ASME Section Ill, Subsections NC and NE, 1992 Edition and Addenda; therefore, the methodologies remain unchanged. The techniques available in ASME Section Ill, 1992 Edition and Addenda are more detailed and explicit, which was determined to be more practical for use in current and future analyses related to these penetrations. Therefore, the analysis of the Main Steam and Feedwater penetrations was performed to this later ASME Section Ill Code in support of NCR 01905236.

The proposed activity is to revise UFSAR Section 3.8.1.5.4 to update the analysis code of record for these penetrations. The precedent was established when the UFSAR was updated several years ago to change the design code for penetrations 63 and 64 to ASME Code, Section Ill, Subsections NC and NE, 1992 Edition, including all 1992 Addenda. A re-analysis of the Main Steam and Feedwater penetrations was performed to this ASME Code Section Ill Edition and Addenda. As documented in calculation OSC-11500 (Rev 4), these penetrations are acceptable to perform their design function and meet the ASME Section 111 allowables. UFSAR Section 3.8.1.5.4 is being updated to change the analysis code of record for the Main Steam and Feedwater penetrations to ASME Section Ill, Subsections NC and NE, 1992 Edition including all 1992 Addenda. This activity does not involve a digital change nor any change to a digital component.

The 10 CFR 50.59 Evaluation concluded that there are no impacts to the ONS Technical Specifications. The 10 CFR 50.59 screen, documented in NCR 02150538, only identified an impact in Question 3 related to a change in methodology; therefore, 10 CFR 50.59

  • Evaluation questions 1-7 are not applicable, based on guidance from NEl-96-07. Upon further review, documented in 10 CFR 50.59 Evaluation Question 8, the proposed activity does not result in a departure from a method of evaluation described in the UFSAR used in establishing the design bases or in the safety analysis. The tech spec function, nor any safety limits, setpoints, nor any design basis limits are altered or impacted. ASME Section Ill, 1992 Edition is approved by the NRC, and is used for its intended application in accordance with the limitations defined in 10 CFR 50.55a. Therefore, based on the above evaluation, it is acceptable to revise the UFSAR to change the referenced code from ASA N6.2-1965 to ASME Section Ill, Subsections NC and NE, 1992 Edition and all 1992 Addenda.

Attachment 5 - Page 6 of 7

Oconee Nuclear Station 10 CFR 50.59 Summary Report

Title:

EC109523 - Rev 011 U1&2 BWST RECIRC ISOLATION VALVES (AR 02153894)

Summary:

The Nuclear Regulatory Commission (NRC) issued amendments for the Reverse Osmosis (RO) system by correspondence dated April 30, 2014. The connection from the BWSTs to the RO system includes redundant automatically actuated, safety-related, seismically qualified isolation valves between the RO system supply piping and the Borated Water Storage Tanks (BWSTs). These automatically actuated isolation valves also isolate the BWST recirculation pump from the BWST. The isolation valves actuate to close on declining BWST level when the BWST level setpoint is reached, thereby isolating RO and Spent Fuel Pool Cooling (SFPC) purification systems from BWST prior to entering Reactor Building Emergency Sump (RBES) r_ecirculation phase following drawdown of the BWST. Isolation of RO and SFPC purification systems prevents unanalyzed consequences from leakage from BWST into those systems' piping when in the RBES recirculation phase. The redundant control circuitry of the isolation valves contains digital pressure transmitters which actuate on low BWST level to close the valves. Actuation of any one of 4 digital pressure transmitters will close both redundant valves and secured the BWST recirculation pump. Loss of power to the circuit, or loss of air to the valves will result in the valves closing.

The digital pressure transmitter used in this application has self-diagnostics and is configured to fail LO which closes the redundant valves. The digital pressure transmitter is demonstrated to be a very reliable device and has received a generic qualification from EPRI for use in mild environment nuclear applications.

The evaluation demonstrates that the proposed control circuitry for the redundant isolation valves will preserve the current licensing basis. The activity will not create more than a minimal increase in the frequency or consequences of accidents or malfunctions of SSCs important to safety. The proposed activity will not create the potential for a new type of unanalyzed event, has no impact on the fission product barriers and does not affect evaluation methodology. The answers to all eight evaluation questions is negative, no Tech Spec modification, deletion, or addition is required and no UFSAR revision is required.

Therefore, under 10 CFR 50.59 it is permissible to implement this modification without prior approval from the NRC.