MONTHYEARML19056A1942019-02-18018 February 2019 Attachment 3: Estimate of Initial Temperature Difference Between Cladding and Surrounding Air ML18352A7532018-12-13013 December 2018 Notification of Changes to Comprehensive Recovery Plan CNRO-2018-00011, Submittal of Joint Plant Access Shared Information Table2018-03-19019 March 2018 Submittal of Joint Plant Access Shared Information Table ML17150A2562017-06-0505 June 2017 Entergy Fleet - 2017 Onsite Insurance Submittal Review for Entergy Operations, Inc., and Entergy Nuclear Operations, Inc. (CAC No. TM3058) ML16056A1392016-03-11011 March 2016 Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports ML14307B7072014-12-10010 December 2014 Supplemental Information Related to Development of Seismic Risk Evaluations for Information Request Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-T ENOC-08-00040, Commitment Update Relating to Application for Order Approving Indirect Transfer of Control of Licenses2008-07-28028 July 2008 Commitment Update Relating to Application for Order Approving Indirect Transfer of Control of Licenses ENOC-07-00036, Entergy Operations, Inc. - Supplemental Information in Support of Application for Order Approving Indirect Transfer of Control of Licenses2007-10-31031 October 2007 Entergy Operations, Inc. - Supplemental Information in Support of Application for Order Approving Indirect Transfer of Control of Licenses ML0728203072007-10-11011 October 2007 Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists ML0707901882006-10-0505 October 2006 Listing of All Items NRC Region I Inspection of PNPS Various Pages Dated October 4 and 5, 2006 with Separate Pages for Lr# 569 and Lr# 536 ML0618704922006-06-29029 June 2006 Fourth Ten-Year In-Service Testing (IST) Program, IST Relief Request PR-03, Rev. 3 ML0634704122006-06-0101 June 2006 E-MAIL: (Intergovernmental) Plymouth Population & Buildout Data (Forecasts) ML0613900752005-12-31031 December 2005 2005 Source Registration Emission Estimates-PNPS ML0535703362005-12-0505 December 2005 Geographical, Environmental and Siting Information Minority and Low Income Data, Pilgrim and FitzPatrick Sites from 2000 Census ML0614203752002-12-31031 December 2002 PNPS Radiological Effluent and Waste Disposal Report Jan 1- Dec 31, 2002 2019-02-18
[Table view] Category:Letter
MONTHYEARML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 05000293/20240022024-08-21021 August 2024 NRC Inspection Report No. 05000293/2024002 PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24129A1042024-05-26026 May 2024 Preapplication Readiness Assessment Plan for the Holtec Decommissioning International License Termination Plan ML24136A2382024-05-14014 May 2024 Annual Radiological Environmental Operating Report for 2023 ML24135A3212024-05-14014 May 2024 Annual Radioactive Effluent Release Report, January 1 Through December 31, 2023 IR 05000293/20240012024-05-0707 May 2024 NRC Inspection Report No. 05000293/2024001 L-24-009, HDI Annual Occupational Radiation Exposure Data Reports - 20232024-04-29029 April 2024 HDI Annual Occupational Radiation Exposure Data Reports - 2023 L-24-010, Request for Preapplication Readiness Assessment of the Draft License Termination Plan2024-04-22022 April 2024 Request for Preapplication Readiness Assessment of the Draft License Termination Plan L-24-007, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI)2024-03-29029 March 2024 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) IR 05000293/20230032024-02-29029 February 2024 NRC Inspection Report Nos. 05000293/2023003 and 05000293/2023004 L-24-002, Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G2024-02-0202 February 2024 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G ML23342A1182024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 ML23334A1822023-11-30030 November 2023 Biennial Report for the Defueled Safety Analysis Report Update, Technical Specification Bases Changes, 10 CFR 50.59 Evaluation Summary, and Regulatory Commitment Change Summary – November 2021 Through October 2023 L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23306A0992023-11-0202 November 2023 and Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7) IR 05000293/20234012023-08-31031 August 2023 NRC Inspection Report No. 05000293/2023401 & 2023001 (Cover Letter Only) IR 05000293/20230022023-08-0404 August 2023 NRC Inspection Report No. 05000293/2023002 L-23-008, Correction to Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations Holtec Decommissioning International, LLC (HDI)2023-05-23023 May 2023 Correction to Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations Holtec Decommissioning International, LLC (HDI) ML23135A2152023-05-15015 May 2023 Annual Radioactive Effluent Release Report, January 1 Through December 31, 2022 ML23136A7792023-05-15015 May 2023 Annual Radiological Environmental Operating Report, January 1 Through December 31, 2022 L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance ML23069A2782023-03-13013 March 2023 Request for Scoping Comments Concerning the Environmental Review of Monticello Nuclear Generating Plant, Unit 1 Subsequent License Renewal Application ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000293/20220042023-02-15015 February 2023 NRC Inspection Report No. 05000293/2022004 ML22356A0712023-01-31031 January 2023 Issuance of Exemption for Pilgrim Nuclear Power Station ISFSI Regarding Annual Radioactive Effluent Release Report - Cover Letter ML22347A2782022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 L-22-041, Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension2022-12-0909 December 2022 Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension IR 05000293/20220032022-11-18018 November 2022 NRC Inspection Report No. 05000293/2022003 L-22-036, Decommissioning Trust Fund Agreement2022-11-0808 November 2022 Decommissioning Trust Fund Agreement ML22276A1762022-10-24024 October 2022 Decommissioning International Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22266A1922022-09-23023 September 2022 and Pilgrim Nuclear Power Station - Request to Withdraw Prior Submissions from NRC Consideration ML22272A0352022-09-22022 September 2022 S. Lynch-Benttinen Letter Regarding U.S. Citizen Intent to Sue U.S. Fish and Wildlife and NOAA Fisheries Representing the Endangered Species (Na Right Whale) Which Will Be Adversely Affected by Holtec International Potential Actions ML22269A4202022-09-22022 September 2022 Citizen Lawsuit ML22241A1122022-08-29029 August 2022 Request for Exemption from 10 CFR 72.212(a)(2), (b)(2), (b)(3), (b)(4), (B)(5)(i), (b)(11), and 72.214 for Pilgrim ISFSI Annual Radioactive Effluent Release Report IR 05000293/20220022022-08-12012 August 2022 NRC Inspection Report No. 05000293/2022002 ML22215A1772022-08-0303 August 2022 Decommissioning International (HDI) Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22221A2592022-08-0101 August 2022 LTR-22-0217-1-NMSS - Town of Duxbury Letter Opposing the Irradiated Water Release from Pilgrim (Docket No. 05000293) ML22206A1512022-08-0101 August 2022 NRC Office of Investigations Case Nos. 1-2022-002 & 1-2022-006 ML22175A1732022-07-28028 July 2022 LTR-22-0153-1 - Response Letter to D. Turco, Cape Downwinders, from A. Roberts, NRC, Regarding Holtec-Pilgrim Plans to Dump One Million Gallons of Radioactive Waste Into Cape Cod Bay ML22193A1662022-07-28028 July 2022 LTR-22-0154-1 - Heather Govern, VP, Clean Air and Water Program, Et Al., Letter Regarding Radioactive Wastewater Disposal from the Pilgrim Nuclear Power Station (Docket No. 05000293) ML22154A4882022-06-0101 June 2022 Letter from Conservation Law Foundation Regarding Irradiated Water Release from Pilgrim ML22154A1622022-05-26026 May 2022 Letter and Email from Save Our Bay/Diane Turco Regarding Irradiated Water Release from Pilgrim ML22136A2602022-05-16016 May 2022 Submittal of Annual Radiological Environmental Operating Report for January 1 Through December 31, 2021 ML22136A2572022-05-16016 May 2022 Submittal of Annual Radioactive Effluent Release Report for January 1 Through December 31, 2021 2024-09-18
[Table view] |
Text
Letter Number 2.18.060 December 13, 2018 Mr. David C. Lew Regional Administrator, Region I U.S. Nuclear Regulatory Commission 2100 Renaissance Blvd, Suite 100 King of Prussia, PA 19406-2713
SUBJECT:
Notification of Changes to Comprehensive Recovery Plan Pilgrim Nuclear Power Station Docket No. 50-293 Renewed License No. DPR-35 Entergy Nuclear Operations, Inc. Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 Brian R. Sullivan Site Vice President
REFERENCES:
- 1. NRC letter to Entergy, "Confirmatory Action Letter -Pilgrim Nuclear Power Station," dated August 2, 2017 (ML 17214A088)
Dear Mr. Lew:
On August 2, 2017, the U.S. Nuclear Regulatory Commission (NRC) transmitted the Pilgrim Nuclear Power Station (PNPS) Confirmatory Action Letter (CAL) (Reference
- 1) which confirmed the actions PNPS planned to take in accordance with our Comprehensive Recovery Plan (CRP). During review of Nuclear Safety Culture (NSC) closure packages in advance of the December confirmatory inspection, PNPS has determined that minor clarifications are appropriate for a number of the actions. Accordingly, clarifications to NSC-1.1, NSC-1.5, NSC-2.2, NSC-2.3 and NSC-8.9 are provided in Attachment
- 1. If you have any questions or require additional information, please contact Mr. Peter J. Miner at (508) 830-7127.
Sincerely, BRS/rb Attachment 1 : Notification of Changes to Comprehensive Recovery Plan t,<DAJDI jr!)bl ;Jf__f_ /!_~tJ-£ Entergy Nuclear Operations, Inc. Pilgrim Nuclear Power Station cc: U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Mr. John Lamb, Senior Project Manager Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 0-9012 Washington, DC 20555-0001 NRC Senior Resident Inspector Pilgrim Nuclear Power Station Letter No. 2.18.060 Page 2 of 2 Attachment 1 Letter Number 2.18.060 Notification of Changes to Comprehensive Recovery Plan Notification of Changes to Comprehensive Recovery Plan NSC-1.1 NSC-1.5 Implement the Individual Targeted Performance Improvement Plans (TPIP) developed from CR PNP-2016-2052, CA-35 utilizing the guidance contained in EN-FAP-HR-006, Fleet Approach to Leadership Development
& Organizational Effectiveness.
Document review plan progress as determined during the individual Monthly Performance Management Meetings to ensure sufficient evidence exists for plan closures.
When a Senior Leader has positively satisfied their TPIP objectives, the Site Vice President SVP can close the TPIP. Implement the Individual Targeted Performance Improvement Plans (TPIP) developed from CR PNP-2016-2052, CA-35 utilizing the guidance contained in EN-FAP-HR-006, Fleet Approach to Leadership Development
& Organizational Effectiveness.
Document review plan progress as determined during the individual Monthly Performance Management Meetings to ensure sufficient evidence exists for plan closures.
When a Senior Leader has positively satisfied their TPIP objectives, the SVP can close the TPIP. Letter Number 2.18.060 Attachment 1 Implement the Individual Targeted Performance Improvement Plans {TPIP) for the GMPO and Directors (Senior Leaders) developed from CR PNP-2016-2052, CA-36 utilizing the guidance contained in EN-FAP-HR-006, Fleet Approach to Leadership Development
& Organizational Effectiveness.
Document review plan progress as determined during the individual Monthly Performance Management Meetings to ensure sufficient evidence exists for plan closures.
When a Senior Leader has positively satisfied their TPIP objectives, the Site Vice President SVP) can close the TPIP. Develop and implement Individual Targeted Performance Improvement Plans (TPI P) for Managers, Superintendents and Supervisors using the criteria listed in PN P-2016-2052, CA-36 and utilizing the guidance contained in EN-FAP-HR-006, Fleet Approach to Leadership Development
& Organizational Effectiveness.
Document review plan progress as determined during the individual Monthly Performance Management Meetings to ensure sufficient evidence exists for plan closures.
When a leader has positively satisfied their TPIP objectives, the one-up leader can close the TPIP. .. :~4:)iJSO:
for C~~ng~ :! , "': ,~, "CS'"' * 'l ,,, , ,
- The reference to CR-PNP-2016-2052 CA-35 in the 1st sentence of the CAL action has been revised to CA-36 to correct a typographical error. The GMPO and Directors have been added to the 1st sentence to clarify the intent of this action. The reference to CR-PNP-2016-2052 CA-35 in the 1st sentence of the CAL action has been revised to CA-36 to correct a typographical error. Managers, Superintendents, and Supervisors have been added to the 1st sentence, along with the action to develop and implement individual TPIPs, to clarify the intent of this action. In addition, the last sentence has been revised to identify that the one-up leader will close the TPIPs. Page 1 of 3 Notification of Changes to Comprehensive Recovery Plan *.:CAL.> " .. , * ,, , . * , , Actionr ', *.~urr:e!1l',CAL':Ac~ion Deshriptiori , , " #,, , , , ' ~* ' NSC-2.2 NSC-2.3 Rollout the PNPS Employee handbook (or equivalent) to site personnel.
The rollout meeting should include:
- Senior Leaders (Senior Manager or above) facilitating in the rollout meeting to ensure effective communications and understanding of the commitment to the handbook and its use.
- Individuals signing for their copy of PNPS Employee Handbook and acknowledgement of expectations for use. Conduct alignment sessions with station leadership on the content and implementation expectations on the PNPS handbook (or equivalent) based on the EN-PL-100, Nuclear Excellence Model (PNPS's vision, mission, strategy, goals, core values, attributes of leader and individual behaviors), and site-specific recovery procedure EN-OM XXX-PNP-RC (Created in CR PNP-2016-2052, CA-39). These sessions will be led by the Site Vice President and focus on establishing accountability for high standards of performance to align behaviors in support of a strong nuclear safety culture. Station Leadership includes first line supervisor level up to Director and General Manager-Plant 0 erations GMPO level. Letter Number 2.18.060 Attachment 1 ::. '""* "" ?Pfo~o*~~~.*CAl:A~tiJ~
- he~chp{io~*
- (~ 't,. .,:,, ' '{;.:_ *
- f,:' : '."\,' c', , ~;,:* '* "'} *:) ! **~ Rollout the PNPS Employee handbook (or equivalent) to site personnel.
The rollout should include:
- Senior Leaders (Senior Manager or above) facilitating the rollout to ensure effective communications and understanding of the commitment to the handbook and its use.
- Individuals signing for their copy of PNPS Employee Handbook and acknowledgement of expectations for use. Conduct alignment sessions with station leadership on the content and implementation expectations on the PNPS handbook (or equivalent) based on the EN-PL-100, Nuclear Excellence Model (PNPS's vision, mission, strategy, goals, core values, attributes of leader and individual behaviors), and site-specific recovery procedure EN-OM XXX-PNP-RC (Created in CR PNP-2016-2052, CA-39). These sessions will be led by Station Senior Management and focus on establishing accountability for high standards of performance to align behaviors in support of a strong nuclear safety culture. Station Leadership includes first line supervisor level up to Director and General Manager-Plant Operations GMPO level. The word "meeting" has been removed from the second sentence and the first bulleted phrase to clarify that the roll out was conducted in two steps not in a meeting format. The intent and actions taken to meet this CAL requirement remain unchanged.
The word "in" in the 1st bulleted sentence following the word "facilitating" has been removed to improve the readability of the sentence.
Change of wording from "Site Vice President" to "Station Senior Management" to more correctly describe the handbook roll out and alignment.
Although the SVP was present in the process and during meetings providing his leadership, guidance and oversight of the alignment sessions, the presentations were created and led by station senior managers.
CAP and ACRB closure packages provide documentation of the station senior management presentation.
Page 2 of 3
,**,CAL ,Ac:tion .#, NSC-8.9 Notification of Changes to Comprehensive Recovery Plan Reinforce the use of Entergy's Managerial Accountability Model as stated in EN-PL-100, Attachment 3.2 with all full-time site personnel and supplemental personnel to improve consistent performance of Managerial and Individual Accountability.
Reinforce the use of the Culpability model (accountability) as stated in EN-PL-100 with full-time, actively badged, site assigned personnel to improve consistent performance of Managerial and Individual Accountability.
Letter Number 2.18.060 Attachment 1 :j=~e,s9ri)or c;:h~~gi.
- "~ ,\ ,-" *s ', ;;' . ' ' 'i The wording change captures the intended audience with the most current accountability model from procedure EN-PL-100, Nuclear Excellence Model -now called the "Culpability Model." EN-PL-100 has been revised and attachment 3.2 no longer exists. Page 3 of 3