Inservice Inspection Program Owner'S Activity Report for Refueling Outage 20
ML13234A340
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 08/06/2013
From: Pope A H
Duke Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
BSEP 13-0089
Download: ML13234A340 (5)


Text

  • DUKE ENERGY.Brunswick Nuclear Plant P.O. Box 10429 Southport, NC 28461 AUG 0 6 2013 Serial: BSEP 13-0089 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

Brunswick Steam Electric Plant, Unit No. 2 Docket No. 50-324 Inservice Inspection Program Owner's Activity Report for Unit 2 Refueling Outage 20 Ladies and Gentlemen:

Duke Energy Progress, Inc., formerly known as Carolina Power & Light Company (CP&L), is enclosing an American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section Xl, Form OAR-i, Owner's Activity Report for the Brunswick Steam Electric Plant (BSEP), Unit No. 2. The report covers inspection activities performed during BSEP Unit 2 Refueling Outage 20 (i.e., designated as B221R1) for the second inspection period. The report has been prepared and is being submitted in accordance with ASME Code Case N-532-4.No regulatory commitments are contained in this letter. Please refer any questions regarding this submittal to Mr. Lee Grzeck, Manager -Regulatory Affairs, at (910) 457-2487.Sincerely, Annette H. Pope Manager -Organizational Effectiveness Brunswick Steam Electric Plant~L~1 U.S. Nuclear Regulatory Commission Page 2 of 2 WRM/wrm

Enclosure:

Form OAR-1 Owner's Activity Report for B221 R1 cc (with enclosure):

U. S. Nuclear Regulatory Commission, Region II ATTN: Mr. Victor M. McCree, Regional Administrator 245 Peachtree Center Ave, NE, Suite 1200 Atlanta, GA 30303-1257 U. S. Nuclear Regulatory Commission ATTN: Mr. Christopher Gratton (Mail Stop OWFN 8G9A)11555 Rockville Pike Rockville, MD 20852-2738 U. S. Nuclear Regulatory Commission ATTN: Ms. Michelle P. Catts, NRC Senior Resident Inspector 8470 River Road Southport, NC 28461-8869 Chair -North Carolina Utilities Commission P.O. Box 29510 Raleigh, NC 27626-0510 Mr. Jack M. Given, Jr., Bureau Chief North Carolina Department of Labor Boiler Safety Bureau 1101 Mail Service Center Raleigh, NC 27699-1101 BSEP 13-0089 Enclosure Form OAR-1 Owner's Activity Report for B221R1 Form OAR-1 OWNER'S ACTIVITY REPORT Report Number: Plant: B221R1 Brunswick Steam Electric Plant Unit No.: 2 Commercial Service Date: November 1975 Refueling Outage No.: B221 R1 Current Inspection lnterrval:-

Fourth Current Inspection Period: Second Period of the Fourth Interval Edition and Addenda of Section Xl applicable to the inspection plans: 2001 edition with 2003 addenda Date and Revision of Inspection Plans: Fourth Interval Revision 2 5/21/2013 Edition arid Addenda of Section Xl applicable to Repair/Replacement activities, if different than the Inspection Plans: None Code Cases used: N-532-4. N-460. and N-663 CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the Repair/Replacement activities and evaluations supporting the completion of B221 R1 (Refueling Outage Number)conform to the requirements of Section Xl.& .4-, 'T-i/ 5:,-p/ Owner or Owner's Designee, Title Date: CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of AJOYT'- 4I 2 O4p AJ- and employed by4h.8 .tIJAY_ ;nQie9.9Q.

of ,A/ rA. orT have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section Xl.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.~~ Commissions k'9s /s$'I l / r? 4,,'9 Nr-Inspector's Signature National Board, State, Province, and Endorsements Date: (~-31g a /,~3

.A FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and Item Item Description Evaluation Description Number Category B-A, Item B1.30 Shell to Flange Weld 2B1l-RPV-F Evaluated per ASME IWB-3600 in outage B220R1 and re-inspected this outage. Indication most likely fabrication induced.Acceptable as-is through the end of plant licensed life.TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Repair/Replacement Code Class Item Description Description of Work Date Completed Plan Number 1 2-B21-F022B Perform guide pad 4/7/13 1490275-01 modification 1 2-B32-F030 Replace valve leaks by 4/16/13 1823432-01 seat 1 2-B11-CRD(26-27)

Replace drive and bolting 4/12/13 1930420-13 1 2-B32-F029 Replace valve leaks by 4/4/13 1930420-01 seat