ML093510914
Person / Time
Site: Hatch, Vogtle, Farley  Southern Nuclear icon.png
Issue date: 12/17/2009
From: Ajluni M J
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NL-09-1838
Download: ML093510914 (18)


Text

Southern Nlielea' Opl;)rnting Cumpany, In:, December 17, 2009 SOUTHERN'\

COMPANY Docket Nos: 50-321 50-348 50-424 50-366 50-364 50-425 U. S. Nuclear Regulatory Commission A TIN: Document Control Desk Washington, D. C. 20555-0001 Edwin I. Hatch Nuclear Joseph M. Farley Nuclear Vogtle Electric Generating 10 CFR 50.46 ECCS Evaluation Model Annual Reports for Ladies and Gentlemen:

Southern Nuclear Operating Company (SNC) is the licensed operator for the Edwin I. Hatch Nuclear Plant (Hatch), the Joseph M. Farley Nuclear Plant (Farley), and the Vogtle Electric Generating Plant (Vogtle).

The requirements of 10 CFR 50.46(a)(3){ii) include an annual report by licensees of changes to or errors in acceptable emergency core cooling system (ECCS) models that affect the temperature calculation and the estimated effect of changes or errors on the limiting ECCS analysis.

Accordingly, the reports required by 10 CFR 50.46(a){3)(ii) for Hatch, Farley, and Vogtle are provided in Enclosures 1, 2, and 3, respectively.

The resulting peak cladding temperature (PCT) for Hatch, Farley, and Vogtle continues to meet the criterion of 10 CFR 50.46{b){1) (Le., :s; 2200°F). This letter contains no NRC commitments.

If you have any questions, please advise. Sincerely, f!l.J Uif-' M. J. Ajluni Nuclear Licensing Manager MJAfCL T flac U. S. Nuclear Regulatory Commission NL-09-1838 Page 2

Enclosures:

Edwin I. Hatch Nuclear Plant 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2008 Joseph M. Farley Nuclear Plant 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2008 Vogtle Electric Generating Plant 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2008 Southern Nuclear Operating Company Mr. J. T. Gasser, Executive Vice President Mr. J. R. Johnson, Vice President

-Farley Mr. D. R. Madison, Vice President

-Hatch Mr. T. E. Tynan, Vice President

-Vogtle Ms. P. M. Marino, Vice President

-Engineering RType: CFA04.054; CHA02.004; CVC7000. U. S. Nuclear Regulatory Mr. L. A. Reyes, Regional Mr. R. E. Martin, NRR Project Manager -Ms. D. N. Wright, NRR Project Manager -Ms. D. N. Wright, NRR Project Manager -Mr. E. L. Crowe, Senior Resident Inspector

-Mr. J. A. Hickey, Senior Resident Inspector

-Mr. M. Cain, Senior Resident Inspector

-

Edwin I. Hatch Nuclear Joseph M. Farley Nuclear Vogtle Electric Generating 10 CFR 50.46 ECCS Evaluation Model Annual Reports for Enclosure Edwin I. Hatch Nuclear 10 CFR 50.46 ECCS Evaluation Model Annual Report for Enclosure Edwin I. Hatch Nuclear 10 CFR 50.46 ECCS Evaluation Model Annual Report for Edwin I. Hatch Nuclear Plant Unit SAFERIGESTR-LOCA Analysis I Table 1-la Summary of Changes/Errors (2008) Description Estimated Effect PCT) None affecting PCT N/A Table 1-lb Cumulative Impact of Changes/Errors

! Description GE14 (OF)

  • Changes/Errors Previously Reported (Reference
1) 5
  • Current Year -2008 (Reference
2) 0 Cumulative Total 5 Page 1 of 3 Enclosure Edwin I. Hatch Nuclear 10 CFR 50.46 ECCS Evaluation Model Annual Report for Edwin I. Hatch Nuclear Plant Unit SAFERIGESTR-LOCA Analysis Table 1-2a -Summary of Changes/Errors (2008) Description Estimated Effect (Ll Pcn i None affecting PCT N/A Table 1-2b -Cumulative Impact of Changes/Errors Description GE14 LlIPCTI (OF)
  • Changes/Errors Previously Reported (Reference
1) 5
  • Current Year 2008 (Reference
3) 0 Cumulative Total 5 Page 2 of 3 Enclosure Edwin I. Hatch Nuclear 10 CFR 50.46 ECCS Evaluation Model Annual Report for

References:

Letter from Mark J. Ajluni to USNRG (NL-08-1735), "Edwin I. Hatch Nuclear Plant, Joseph M. Farley Nuclear Plant, Vogtle Electric Generating Plant 10 GFR 50.46 EGGS Evaluation Model Annual Reports for 2007," dated December 19, 2008 Global Nuclear Fuel Supplemental Reload Licensing Report for Edwin I. Hatch Nuclear Power Plant Unit 1 (Report Number 0000-0067-2863-SRLR), Revision 0, dated December 2007 Global Nuclear Fuel Supplemental Reload Licensing Report for Edwin I. Hatch Nuclear Power Plant Unit 2 (Report Number 0000-0083-5389-SRLR), Revision 0, dated December 2008 Page 3 of 3 Edwin I. Hatch Nuclear Joseph M. Farley Nuclear Vogtle Electric Generating 10 CFR 50.46 ECCS Evaluation Model Annual Reports for Enclosure Joseph M. Farley Nuclear 10 CFR 50.46 ECCS Evaluation Model Annual Report for Enclosure Joseph M. Farley Nuclear 10 CFR 50.46 ECCS Evaluation Model Annual Report for Joseph M. Farley Nuclear Plant -Unit ASTRUM Best Estimate Large Break LOCA Table 2-1a -Summary of Changes/Errors (2008) Estimated Description Effect PCT) Reactor Coolant PumRs InRuts Error Several errors were discovered in the pump two-phase degraded homologous curve. In addition, minor errors were also found in the pump inputs resulting in a slight loop to loop asymmetry.

The 18°F corrected pump inputs have been evaluated.

The result from the plant specific WCOBRAfTRAC runs yielded an estimated PCT increase of 18°F for Farley Unit 1. Table 2-1 b -Cumulative Impact of Changes/Errors Description (OF)

  • Changes/Errors Previously Reported (Reference
1) 0
  • Current Year -2008 (Reference
2) 18 Cumulative Total 18 Page 1 of 5 Enclosure Joseph M. Farley Nuclear 10 CFR 50.46 ECCS Evaluation Model Annual Report for Joseph M. Farley Nuclear Plant -Unit NOTRUMP Appendix K Small Break LOCA Table 2-1c -Summary of Changes/Errors (2008) Description Estimated Effect (L'l PCT) None affecting PCT N/A Table 2-1d -Cumulative Impact of Changes/Errors Description L'lIPCTI (OF)
  • Changes/Errors Previously Reported (Reference
1) 42
  • Current Year -2008 (Reference
2) 0 Cumulative Total 42 Page 2 of 5 Enclosure Joseph M. Farley Nuclear 10 CFR 50.46 ECCS Evaluation Model Annual Report for Joseph M. Farley Nuclear Plant -Unit ASTRUM Best Estimate Large Break LOCA Table 2-2a -Summary of Changes/Errors (2008) Estimated Description Effect (b. PCT) Reactor Coolant Pumes IDeuts Error Several errors were discovered in the pump two-phase deg raded homologous curve. In addition, minor errors were also found in the pump inputs resulting in a slight loop to loop asymmetry.

The 18°F corrected pump inputs have been evaluated.

The result from the plant specific WCOBRNTRAC runs yielded an estimated PCT increase of 18°F for Farley Unit 2. Table 2-2b -Cumulative Impact of Changes/Errors Description b.IPCTI (OF)

  • Changes/Errors Previously Reported (Reference
1) 0
  • Current Year -2008 (Reference
2) 18 Cumulative Total 18 Page 3 of 5 Enclosure Joseph M. Farley Nuclear 10 CFR 50.46 ECCS Evaluation Model Annual Report for Joseph M. Farley Nuclear Plant -Unit NOTRUMP Appendix K Small Break LOCA Table 2-2c -Summary of Changes/Errors (2008) Description Estimated Effect (L1 PCT) I None affecting PCT N/A Table 2-2d -Cumulative Impact of Changes/Errors Description L1IPCTI (OF)
  • Changes/Errors Previously Reported (Reference
1) 0
  • Current Year -2008 (Reference
2) 0 Cumulative Total 0 Page 4 of 5 Enclosure Joseph M. Farley Nuclear 10 CFR 50.46 ECCS Evaluation Model Annual Report for References Letter from Mark J. Ajluni to USI\IRG (I\IL-08-1735), "Edwin I. Hatch Nuclear Plant, Joseph M. Farley Nuclear Plant, Vogtle Electric Generating Plant 10 GFR 50.46 EGGS Evaluation Model Annual Reports for 2007," dated December 19, 2008 Westinghouse Letter LTR-LlS-09-75, "J. M. Farley Units 1 and 10 GFR 50.46 Annual Notification and Reporting for 2008," January 29, Page 5 of 5 Edwin I. Hatch Nuclear Joseph M. Farley Nuclear Vogtle Electric Generating 10 CFR 50.46 ECCS Evaluation Model Annual Reports for Enclosure Vogtle Electric Generating 10 CFR 50.46 ECCS Evaluation Model Annual Report for Enclosure Vogtle Electric Generating 10 CFR 50.46 ECCS Evaluation Model Annual Report for Vogtle Electric Generating Plant -Unit BASH Large Break LOCA Table 3-1 a -Summary of Changes/Errors (2008) Description Estimated Effect (<'1 PCT) None affecting PCT N/A Table 3-1 b -Cumulative Impact of Changes/Errors Description

<'1IPCTI (OF)

  • Changes/Errors Previously Reported (Reference
1) 40
  • Current Year -2008 (Reference
2) 0 Cumulative Total 40 Page 1 of 5 Enclosure Vogtle Electric Generating 10 CFR 50.46 ECCS Evaluation Model Annual Report for Vogtle Electric Generating Plant -Unit Appendix K Small Break LOCA Table 3-1c -Summary of Changes/Errors (2008) Description Estimated Effect (ll PCT) None affecting PCT N/A Table 3-1d -Cumulative Impact of Changes/Errors Description lllPCTI (OF)
  • Changes/Errors Previously Reported (Reference
1) 0
  • Current Year -2008 (Reference
2) 0 Cumulative Total 0 Page 2 of 5 I Enclosure Vogtle Electric Generating 10 CFR 50.46 ECCS Evaluation Model Annual Report for Vogtle Electric Generating Plant -Unit BASH Large Break LOCA Table 3-2a -Summary of Changes/Errors (2008) Description Estimated Effect (t. PCT) None affecting PCT N/A Table 3-2b -Cumulative Impact of Changes/Errors Description t.IPCTI (OF)
  • Changes/Errors Previously Reported (Reference
1) 40
  • Current Year -2008 (Reference
2) 0 Cumulative Total 40 Page 3 of 5 Enclosure Vogtle Electric Generating 10 CFR 50.46 ECCS Evaluation Model Annual Report for Vogtle Electric Generating Plant -Unit Appendix K Small Break LOCA Table 3-2c -Summary of Changes/Errors (2008) Description Estimated Effect (i1 PCT) None affecting PCT N/A Table 3-2d -Cumulative Impact of Changes/Errors Description i1IPCTI (OF)
  • Changes/Errors Previously Reported (Reference
1) 0
  • Current Year 2008 (Reference
2) 0 Cumulative Total 0 Page 4 of 5 Enclosure Vogtle Electric Generating 10 CFR 50.46 ECCS Evaluation Model Annual Report for References Letter from Mark J. Ajluni to USNRC (NL-08-1735), "Edwin I. Hatch Nuclear Plant, Joseph M. Farley Nuclear Plant, Vogtle Electric Generating Plant 10 CFR 50.46 ECCS Evaluation Model Annual Reports for 2007," dated December 19, 2008 Westinghouse Letter L TR-LlS-09-91, "Vogtle Units 1 and 2 1 0 CFR 50.46 Annual Notification and Reporting for 2008," dated January 29, 2009 Page 5 of 5