ML18023A110
ML18023A110 | |
Person / Time | |
---|---|
Site: | Cooper |
Issue date: | 01/23/2018 |
From: | Kozal J W NRC/RGN-IV/DRP/RPB-C |
To: | Dent J Nebraska Public Power District (NPPD) |
Miller G B | |
References | |
IR 2018010 | |
Download: ML18023A110 (7) | |
See also: IR 05000298/2018010
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV 1600 E. LAMAR BLVD.
ARLINGTON, TX 76011
-4511 January 23, 201 8 Mr. John Dent, Jr.
Vice President
-Nuclear and CNO
Nebraska Public Power District
Cooper Nuclear Station
72676 648A Avenue
P.O. Box 98
Brownville, NE 68321
SUBJECT: COOPER NUCLEAR STATION
- NOTIFICATION OF NRC INSPECTION OF THE IMPLEMENTATION OF MITIGATION STRATEGIES AND SPENT FUEL POOL INSTRUMENTATION ORDERS AND EMERGENCY PREPAREDNESS COMMUNICATION/
STAFFING/MULTI
-UNIT DOSE ASSESSMENT PLANS
(05000 298/201 8 010) AND REQUEST FOR INFORMATION
Dear Mr. Dent: The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC) staff will conduct a mitigation strategies for beyond
-design-basis external events, spent fuel pool instrumentation, and emergency preparedness enhancements inspection at the Cooper Nuclear Station, from March 12-16, 2018. The inspection will consist of two reactor inspector
s from the NRC's Region IV office, one reactor inspector from the NRC's Region III office, plus one of the assigned Resident Inspectors at the Cooper Nuclear Station
for one week. The inspection will be conducted in accordance with
the NRC's Temporary Instruction 2515/191 , "Inspection of the Implementation of Mitigating Strategies and Spent Fuel Pool Instrumentation Orders, and Emergency Preparedness Communication/Staffing/Multi
-Unit Dose Assessment Plans
." Experience has shown that this inspection is resource intensive both for the NRC inspectors
and licensee staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection
activity. Please note that the documents are requested to be provided by
February 23, 201 8. During the onsite inspection, inspectors will verify that plans for complying with NRC Orders
-12-051 are in place and are being implemented. Inspectors will also verify the establishment of staffing and communications plans provided in response to the March 12, 2012 , request for information letter
, and multi-unit dose assessment information provided per COMSECY
-13-0010, Schedule and Plans for Tier 2 Order on Emergency Preparedness for Japan Lessons Learned, dated March 27, 2013.
These plans and information were provided in the site specific submittals, which were subsequently reviewed by the NRC staff for understanding and
documented in the NRC's plant safety evaluations (SEs) and safety assessments.
Therefore, appropriate personnel knowledgeable of
the station's FLEX strategies, spent fuel pool instrumentation, and emergency preparedness enhancements
should be available to support the inspector
s at the site during the inspection.
J. Dent 2 We have discussed the schedule for this inspection activity with your staff and understand that our regulatory contact for this inspection will be
Brenda Kirkpatrick
of your licensing organization. If there are any questions about this inspection or the material requested, please contact the lead inspector, Michael H. Stafford , by telephone
at 402-825-3371 or by e-mail at Michael.Stafford@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150 0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC
's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html
(the Public Electronic Reading Room).
Sincerely, /RA/ Jason W. Kozal , Branch Chief Project Branch C
Division of Reactor Projects Dockets: 50
-298 Licenses: DPR-46 Enclosure: FLEX Strategies, Spent Fuel Pool
Instrumentation
, & EP Enhancements
Inspection
Request for Information
1 Enclosure Request for Information
FLEX Strategies, Spent Fuel Pool Instrumentation, & EP Enhancements
Inspection
Cooper Nuclear Station
Inspection Report:
05000 298/201 8010 Inspection Dates:
March 12 - 16, 201 8 Inspection Procedure:
Temporary Instruction 2515/191 , "Inspection of the Implementation of Mitigating Strategies and Spent Fuel Pool Instrumentation Orders, and Emergency Preparedness Communication/Staffing/Multi
-Unit Dose Assessment Plans"
Inspector s: Michael H. Stafford, Team Lead, CNS Resident Inspector
Ryan D. Alexander, Sr. Project Engineer, Region IV
John M. Mateychick , Sr. Reactor Inspector, Region IV
Stuart N. Sheldon, Project Engineer, Region III
Information Requested for the In
-Office Preparation Week
The following information should be sent to the Region IV office in hard copy or electronic format (use of the Certrec IMS information portal is preferred), to the attention of Ryan Alexander, by February 23, 2018. Additionally, a copy of any material sent to the Region IV office should
also be delivered to the resident inspector's office at Cooper Nuclear Station.
The inspectors
will select specific items from the information requested below and then request from
your staff additional documents needed during the onsite inspection week. Also, we request that you categorize the documents in your response with the numbered list below. Please provide requested documentation electronically if possible. If requested documents are large and only hard copy formats are available, please inform the
lead inspector, and provide
subject documentation during the first day of the onsite inspection. If you have any questions regarding this information request, please call the lead inspector as soon as possible.
- Appendix A
A. Provide current revision of the FLEX Final Integrated Plan
(i.e., current FLEX Program Document), including any revisions since January 201 7 submission to the NRC
. B. Provide the FLEX Strategy Basis
Document. C. Provide each operating, off
-normal, abnormal, and/or emergency procedures where entry into one or more
FLEX Support Guideline(s) are initiated
. D. Provide a list and copies
of every FLEX Support Guideline (FSG) or equivalent procedure which you developed or revised to implement your mitigating strategies.
E. Provide a list of key piece
s of equipment that directly perform a FLEX mitigation strategy for core cooling, containment, and/or spent fuel pool
cooling. F. Provide a listing/summaries
of plant modifications completed related to the FLEX program.
G. Provide a listing of calculations, evaluations, and 50.59 reviews related to the FLEX program
and modifications
.
2 H. Applicable site specific hazards for the Cooper Nuclear
Station: 1) Provide documents which show the locations and configuration of structure(s) which store FLEX equipment
. 2) Seismic (a) Provide the travel route(s) for FLEX equipment from storage location(s) to their location(s) of use, AND evaluation(s) which demonstrate that for the potential for soil liquefaction is not of a concern for these travel route(s).
(b) Seismic concerns for water source(s)
(1) If the FLEX water sources are seismically robust, then provide the assessment that shows that they are.
(2) If the FLEX water sources are not seismically robust, then provide:
(a) an assessment of alternate water sources, and
(b) the procedure(s) which describe when and how to access those sources.
3) External Flooding
(a) Provide description of where FLEX equipment is stored relative to protection from flood waters in accordance with site flood analysis.
(1) If any FLEX equipment is stored below flood level, then (i) on an event timeline, show when that equipment will be needed; and (ii) provide the procedure(s) used to retrieve and deploy that equipment.
(b) Provide your plans/procedures
to support successful FLEX equipment deployment for flooding/ponding from localized intense precipitation (which persist over a long time period)
. (c) If credited in the strategy, provide plans/procedures for storage and deployment of temporary flood barriers, including timeline of deployment strategy.
4) Severe storms with high winds
(a) Provide evaluation/evidence as to how FLEX equipment is stored relative to protection from severe storms with high winds
(including tornadic): (1) In a structure that meets the plant's design basis for high wind hazards (e.g., existing safety
-related structure); OR
(2) In a structure that meets the design requirements as described in ASCE 7-10, "Minimum Design Loads for Buildings and Other Structures,"
given the limiting tornado wind speeds
from Regulatory Guide 1.76, and/or design
-basis hurricane wind speeds.
(b) Provide pathways via which you plan to move FLEX equipment from onsite storage areas to final deployment locations.
(1) Show how you designated and evaluated those pathways for post
-storm accessibility for staging and connecting FLEX equipment.
5) Snow, Ice, and Extreme Cold
For each key piece of equipment described in Item E (above) that directly performs or implements a FLEX mitigation strategy:
3 (a) Provide procedures/documents demonstrating how the FLEX equipment is maintained at a temperature within a range to ensure that it will function when called
upon. (b) Proved procedures/documents demonstrating how the FLEX equipment can be moved from the storage
location to its deployment location during extreme snowfall and ice storms.
6) Extreme high temperatures
For each key piece of equipment described in Item
E (above) that directly performs or implements a FLEX mitigation strategy
- (a) Provide procedures/documents
which describes the high
-temperature limit of the range within which the equipment will function.
(b) Provide procedures/documents
which describe how the equipment is maintained below that limit in its storage location.
I. Provide the station
-specific FLEX strategies time validation study(ies)
. J. Provide the relevant station procedure(s)/guideline(s) which describe
the testing and maintenance program for FLEX equipment.
As applicable, provide a listing of the model work orders established to conduct period testing and maintenance activities for FLEX equipment.
NOTE - A sample of records for completed maintenance/testing activities
will be requested for review
during the onsite inspection week.
K. Provide documents/procedures
which describe the programmatic controls in place to ensure that if equipment and applicable connections are unavailable (e.g., due to maintenance , non-functionality), then compensatory measures are implemented in accordance with guidance outlined NEI 12
-06. L. Provide the station
-specific National SAFER Center "Playbook"
M. Relative to personnel training on FLEX strategies, provide:
1) FLEX training bases document(s)
2) Lesson plans/training documents
for site emergency response leaders responsible for the implementation of FLEX strategies.
NOTE - Records for staff completing this training may be requested for review
during the onsite inspection week.
3) Lesson plans/training documents
for site personnel responsible for the execution of mitigating strategies for BDBEEs (i.e., operators, craft personnel, security, radiation protection, etc.). NOTE - Records for staff completing this training may be requested for review
during the onsite inspection week.
N. A current copy of administrative procedure(s) for the CAP, modification program, operations procedure writing and implementation, and top-level documents for the work control and work scheduling programs.
(If FLEX related procedures such as FSGs or the FIP are maintained under a different process
, please include copies of those
procedures.
) O. A current copy of the U/FSAR, Technical Specifications, and Technical Specification Bases documents.
P. Listing of corrective action program document summaries generated related to FLEX equipment, strategies, procedures, and/or training.
4 NOTE - Complete corrective action program documents for a selection of those included in the summary will be requested for review during the onsite inspection week.
Q. A copy of any audits/self
-assessments related to your preparation for this inspection, as well as any related to the implementation or maintenance of the FLEX program.
- Appendix B
R. Provide the procedures implemented for maintenance, testing, calibration, and use of the primary and backup Spent Fuel Pool (SFP) instrumentation channels.
S. Provide lesson plans/training documents which describe the training program that address the use, maintenance, calibration, surveillance, and the use of alternate power to the primary and backup SFP instrument channels.
- Appendix C
T. Communications:
1) Provide documents which show that the communications system(s), technologies, equipment and power supplies would be available from the beginning of the event and operate during an ELAP.
2) Provide the procedures and/or guidance used to implement the communication capabilities
. 3) Provide documents which show that you have added any new communications equipment, portable power supplies and/or systems have been added to ongoing testing and preventative maintenance programs.
U. Staffing: 1) Provide documents which show that onsite and augmented staff will be available to implement the strategies
in response to a large scale natural event that results an ELAP and impedes access to the site, and that functions/tasks have been appropriately staffed. 2) Provide documents which show that the site access methods (e.g., roadways, navigable bodies of water and dockage, airlift, etc.) expected to be available
following the event and available to the Emergency Response Organization (ERO) [as described in the Phase 1 and 2 staffing assessments and NRC safety assessment].
3) Provide documents which show the testing, training, and drills/exercises performed by the station
to demonstrate the ERO's ability to utilize the communications systems and/or equipment.
V. Provide documents and procedures which show that your dose assessment
process/program
is capable of analyzing concurrent radiological releases from all on-site significant sources, including releases from spent fuel pools (i.e., multi
-unit/multi
-source dose assessment capability)
. Lead Inspector Contact Information:
Michael H. Stafford
, Resident Inspector
Mailing Address
- 402-825-3371 U.S. NRC, Region IV Michael.Stafford@nrc.gov Attn: Ryan Alexander, DRP
1600 East Lamar Blvd.
Arlington, TX 76011
-4511
SUNSI Review By: MHS/rdr ADAMS: Yes No Sensitive
Non-Sensitive Non-Publicly Available
Publicly Available
Keyword NRC-002 OFFICE DRP/RPB C C:DRP/RPB C NAME MStafford JKozal SIGNATURE /RA/ /RA/ DATE 01/23/201 8 0 1/23/18