Text
Indian Point Energy Center7-1KLD Associates, Inc.Evacuation Time EstimateRev. 17.GENERAL POPULATION EVACUATION TIME ESTIMATES (ETE)This section presents the current results of the computer analyses using the IDYNEV Systemdescribed in Appendices B, C and D. These results cover 35 regions within the IPEC EPZ and
the 14 Evacuation Scenarios discussed in Section 6.The ETE for all Evacuation Cases are presented in Tables 7-1A through 7-1D. These tablespresent the estimated times to clear the indicated population percentages from theEvacuation Regions for all Evacuation Scenarios. Table 7-1E presents "EPZ ClearanceTimes". The tabulated values of ETE are obtained by interpolating the PCDYNEV simulation model outputs which are generated at 30-minute intervals, then rounding these data to the nearest
5 minutes.7.1Voluntary Evacuation and Shadow EvacuationWe define "voluntary evacuees" as people who are within the EPZ in ERPAs for which anAdvisory to Evacuate has not been issued, yet who nevertheless elect to evacuate. We define"shadow evacuation" as the movement of people from areas outside the EPZ for whom noprotective action recommendation has been issued. Both voluntary and shadow evacuation are assumed to take place over the same time frame as the evacuation from within the impacted Evacuation Region.The ETE for IPEC addresses the issue of voluntary evacuees in the manner shown in Figure 7-1. Within the circle defined by the farthest radial distance of the Evacuation Region, 50 percent of those people located in ERPAs not advised to evacuate, are assumed to do so. Within the annular ring extending from the furthest distance of the Evacuation Region (if less than 10 miles), to the EPZ boundary, it is assumed that 35 percent of the people located there will elect to evacuate.Figure 7-2 presents the area identified as the Shadow Evacuation Region. This region extendsfrom the boundary of the EPZ to the bounding Interstate Highways: I-87 on the west, I-87/287 on the south, I-684 on the east, and I-84 on the north. These interstate highways were selected for this purpose for the following reasons: Many evacuees from within the Evacuation Region who elect to travel directly to theirrespective final destinations (i.e., not travel to reception centers), will likely utilize one or more of these interstate highways. It is reasonable to expect that State Police would limit use of these interstate highwaysections by external trips to assure access and capacity for evacuees. Those people located outside these interstate highways who elect to travel during theevacuation, will undoubtedly move away from the IPEC location and thereby largelyavoid the interstate highways.
Indian Point Energy Center7-2KLD Associates, Inc.Evacuation Time EstimateRev. 1As a result, there is likely to be limited interaction between evacuees traveling from within theEvacuation Region and vehicles originating their trips in areas outside the interstate highways.Traffic generated within this Shadow Evacuation Region, traveling away from the IPEC location,has a potential for impeding evacuating vehicles from within the Evacuation Region. We assume that the traffic volumes emitted within the Shadow Evacuation Region corresponds to 30 percentof the residents there plus a proportionate number of employees in that region.
All ETEcalculations include this shadow traffic movement.7.2Patterns of Traffic Congestion During EvacuationFigures 7-3 through 7-6 illustrate the patterns of traffic congestion that arise for the case whenthe entire EPZ (Region R3) is advised to evacuate during the summer, midweek, midday period under good weather conditions (Evacuation Scenario 1).Traffic congestion, as the term is used here, is defined as Level of Service (LOS) F. LOS F is defined as follows (2000 HCM):Level of Service F is used to define forced or breakdown flow. This conditionexists wherever the amount of traffic approaching a point exceeds the amount that can traverse the point. Queues form behind such locations. Operations within the queue are characterized by stop-and-go waves, and they are extremely unstable.
Vehicles may progress at reasonable speeds for several hundred feet or more, then be required to stop in a cyclic fashion. Level of Service F is used to describe the operating conditions within the queue, as well as the point of the breakdown. It should be noted, however, that in many cases operating conditions of vehicles or pedestrians discharged from the queue may be quite good. Nevertheless, it is the point at which arrival flow exceeds discharge flow, which causes the queue to form, and Level of Service F is an appropriate designation for such points.This definition is general and conceptual in nature, and applies primarily to uninterrupted flow. Levels of Service for interrupted flow facilities vary widely in terms of both the user's perception of service quality and the operational variables used to describe them.All highway "links" which experience LOS F are delineated in these Figures by a thick red line;all others are lightly indicated. Congestion develops rapidly around concentrations of population and traffic bottlenecks. Several areas in the EPZ are congested by 30 minutes (Figure 7-3) after the evacuation advisory including: Approaches to I-287 in Rockland County Southbound Route 9 in Westchester County Routes 6 and 202 approaching the Taconic ParkwayFigure 7-4 presents the congestion pattern one hour after the Advisory to Evacuate. Major areasof congestion in the EPZ are: Virtually all of the southbound routes in Rockland County.
Indian Point Energy Center7-3KLD Associates, Inc.Evacuation Time EstimateRev. 1 In Westchester County, the southbound major highways, south of IPEC are allcongested. Routes 6 and 202 are congested with vehicles departing the Peekskill area.
The Taconic Parkway is congested in the outbound directions, relative to the location of IPEC (i.e., northbound in the section north of IPEC and southbound in the section south of IPEC). Congestion in Putnam County extends on northbound selected routes including Route
- 9. Orange County shows congestion along Route 9W northbound from West Point.Congestion is also present along Route 6 approaching the Woodbury Commons area.Figure 7-5 presents congestion levels at 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> after the start of evacuation. This figure showsthe peak congestion during the evacuation. However, some areas have begun to clear. For example, the congestion in the Woodbury Commons area has cleared by this time.Figure 7-6 presents the congestion levels at 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> after the start of evacuation. Note that mostareas of heavy congestion have cleared by this time. Extensive congestion still exists leaving the Peekskill area, and along southbound Route 9 in the Croton on Hudson area.The absence of congestion on network links implies that traffic demand there has decreasedbelow the roadway capacity for a period of time sufficient to dissipate any traffic queues. It does not imply that traffic has completely cleared from these roadway sections.7.3 Evacuation RatesEvacuation is a continuous process, as implied by Figures 7-3 through 7-6. Another format fordisplaying the dynamics of evacuation is depicted in Figure 7-7. This plot indicates the rate at which traffic flows out of the indicated areas for the case of an evacuation of the full 10-mile Region R3 (i.e., entire EPZ) under the indicated conditions. Appendix J presents these plots for all Evacuation Scenarios for Region R3.As indicated in Figure 7-7, there is typically a long "tail" to these distributions. Vehiclesevacuate an area slowly at the beginning, as people respond to the Advisory to Evacuate at different rates. Then traffic demand builds rapidly (slopes of curves increase). When the system becomes congested, traffic exits the EPZ at rates somewhat below capacity until some evacuation routes have cleared. As more routes clear, the aggregate rate of egress slows since many vehicles have already left the EPZ. Towards the end of the process, a relatively few evacuation routes service the remaining demand.This decline in aggregate flow rate, towards the end of the process, is characterized by thesecurves flattening and gradually becoming horizontal. Ideally, it would be desirable to fully saturate all evacuation routes equally so that all will service traffic near capacity levels and all will clear at the same time. For this ideal situation, all curves would retain the same slope until the end -- thus minimizing evacuation time. In the real world, this ideal is generally unattainable reflecting the variation in population density and in highway capacity over the EPZ.7.4 EPZ Clearance Times Indian Point Energy Center7-4KLD Associates, Inc.Evacuation Time EstimateRev. 1The estimated EPZ clearance times, presented in Table 7-1E, represent the elapsed times,referenced to the Advisory to Evacuate, that it takes evacuees to clear the EPZ boundary, regardless of the impacted Evacuation Region. (Recall that the ETE are defined as the evacuation times to leave the impacted Evacuation Region - not necessarily the EPZ). For all Regions other than R3 (the entire EPZ), the EPZ clearance times could exceed the Region-specific ETE. This is due to the fact that some of the evacuees may travel within the EPZ after they have exited theimpacted Evacuation Region.For example, consider Region R1, representing the circular area of 2-mile radius. After theevacuees depart this Region, they must travel another 8 miles or so to reach the EPZ boundary.
During this travel, evacuees' progress may be impeded by other vehicles driven by people who are "voluntary evacuees". Thus, the evacuees from Region R1 will exit the EPZ at some time after they have exited Region R1; the time they exit the EPZ is called the EPZ Clearance Time for Region R1. Referring to Tables 7-1D and 7-1E, it is seen that the ETE (from Region R1) is 4:55 for Scenario 1, while the corresponding EPZ Clearance Time is 6:05.7.5 Guidance on Using ETE TablesTables 7-1A through 7-1D present the ETE values for all 35 Evacuation Regions and all 14Evacuation Scenarios. They are organized as follows:TableContents 7-1AETE represents the elapsed time required for50 percent of the population within a Region, to evacuate from that Region.
7-1BETE represents the elapsed time required for90 percent of the population within a Region, to evacuate from that Region.
7-1CETE represents the elapsed time required for95 percent of the population within a Region, to evacuate from that Region.
7-1DETE represents the elapsed time required for100 percent of the population within a Region, to evacuate from that Region.The user first determines the percentile of population for which the ETE is sought. The applicable value of ETE within the chosen Table may then be identified using the following
procedure:
Indian Point Energy Center7-5KLD Associates, Inc.Evacuation Time EstimateRev. 1 1. Identify the applicable Scenario: The Season Summer Winter (also Autumn and Spring) The Day of Week Midweek Weekend The Time of Day Midday Evening Weather Condition Good Weather Rain Snow Special Event (if any) Football game at West Point Commencement Exercises at West PointWhile these Scenarios are designed, in aggregate, to represent conditions throughout the year, some further clarification is warranted: The conditions of a summer evening (either midweek or weekend) and rain are notexplicitly identified in Tables 7-1A through 7-1E. For these conditions, Scenario (4) applies. The conditions of a winter evening (either midweek or weekend) and rain or snow arenot explicitly identified in Tables 7-1A through 7-1E. For these conditions, Scenarios (10) for rain and (11) for snow, apply. The seasons are defined as follows: Summer implies that public schools are not in session. Winter, Spring and Autumn imply that public schools are in session. Time of Day: Midday implies the time over which most commuters are at work.
- 2. With the Scenario identified, now identify the Evacuation Region
- Determine the projected azimuth direction of the plume (coincident with the winddirection). This direction is expressed in terms of compass orientation:
towards N, NNE, NE,- Determine the distance that the Evacuation Region will extend from IPEC. Theapplicable distances and their associated candidate Regions are given below: 2 Miles (Region R1) 5 Miles (Regions R2 and R4-R19) to EPZ Boundary (Regions R3 and R20-R35) Enter Table 7-2 and identify the applicable group of candidate Regions based on thedistance that the selected Region extends from IPEC. Within this group, identify the row corresponding to the Azimuth Direction identified in the 2 nd bullet above (seecolumn with the heading, DESCRIPTION OF REGION). Select the Evacuation Indian Point Energy Center7-6KLD Associates, Inc.Evacuation Time EstimateRev. 1Region identifier in that row from the first column of the Table.
- 3. Determine the ETE for the Scenario identified in Step 1 and the Region identified in Step 2, as follows: The columns of Table 7-1 are labeled with the Scenario numbers. Identify the propercolumn in the selected Table using the Scenario number determined in Step 1. Identify the row in this table that provides ETE values for the Region identified in Step 2. The unique data cell defined by the column and row so determined contains thedesired value of ETE expressed in Hours:Minutes.ExampleIt is desired to identify the ETE for the following conditions: Sunday, August 10 th at 4:00 AM. It is raining. Wind direction is to the northeast. Wind speed is such that the distance to be evacuated is judged to be 10 miles (to EPZboundary). The desired ETE is that value needed to evacuate 95 percent of the population fromwithin the impacted Region.Table 7-1C is applicable because the 95-percentile population is desired. Proceed asfollows: 1. Identify the Scenario as summer, weekend, evening and raining. Entering Table7-1C, it is seen that there is no match for these descriptors. However, the clarification given above assigns this combination of circumstances to Scenario 4.
- 2. Enter Table 7-2 and locate the group entitled "5 Mile Ring and Sector to EPZBoundary". Under "DESCRIPTION OF REGION", identify the NE (northeast) azimuth (wind direction) and read REGION R22 in the first column of that row.
- 3. Enter Table 7-1C to locate the data cell containing the value of ETE for Scenario4 and Region 22. This data cell is in column (4) and in the row for Region R22; it contains the ETE value of 7:00.
Indian Point Energy Center7-7KLD Associates, Inc.Evacuation Time EstimateRev. 1 Indian Point Energy Center7-8KLD Associates, Inc.Evacuation Time EstimateRev. 1 Indian Point Energy Center7-9KLD Associates, Inc.Evacuation Time EstimateRev. 1 Indian Point Energy Center7-10KLD Associates, Inc.Evacuation Time EstimateRev. 1 Indian Point Energy Center7-11KLD Associates, Inc.Evacuation Time EstimateRev. 1 Indian Point Energy Center7-12KLD Associates, Inc.Evacuation Time EstimateRev. 1 Indian Point Energy Center7-13KLD Associates, Inc.Evacuation Time EstimateRev. 1 Indian Point Energy Center7-14KLD Associates, Inc.Evacuation Time EstimateRev. 1 Indian Point Energy Center7-15KLD Associates, Inc.Evacuation Time EstimateRev. 1 Indian Point Energy Center7-16KLD Associates, Inc.Evacuation Time EstimateRev. 1 Indian Point Energy Center7-17KLD Associates, Inc.Evacuation Time EstimateRev. 1Table 7-2. Definition of Evacuation RegionsREGIONERPAs INORANGECOUNTYERPAs INPUTNAMCOUNTYERPAs INROCKLANDCOUNTYERPAs IN WESTCHESTERCOUNTYDESCRIPTION OFREGIONERPAs IN REGION R139NONE29, 38, 391-4, 7, 44Entire 2 mile ring1-4, 7, 29, 38, 39, 44 R226, 39, 4016, 18, 4529-31, 38-401-9, 43, 44, 47-49Entire 5 mile ring1-9, 16, 18, 24, 26, 29-31, 38-40, 43-45, 47-49 R324-28, 39, 4016-20, 23, 45, 4629-411-15, 21, 22, 42-44, 47-51Full EPZ1-51 2 Mile Ring and Sector to 5 Miles R426, 39, 4516, 18, 4529, 38, 391-4, 7, 8, 44N1-4, 7, 8, 16, 18, 26, 29, 38, 39, 44, 45 R539, 4516, 18, 4529, 38, 39, 44, 451-4, 7-9, 44, 45NNE1-4, 7-9, 16, 18, 29, 38, 39, 44, 45 R63916, 1829, 38, 39, 441-4, 7-9, 44, 49NE1-4, 7-9, 16, 18, 29, 38, 39, 44, 49 R739NONE29, 38, 39, 441-4, 7-9, 44, 49ENE1-4, 7-9, 29, 38, 39, 44, 49 R839NONE29, 38, 39, 441-5, 7-9, 44, 48, 49E1-5, 7-9, 29, 38, 39, 44, 48, 49 R939NONE29, 38, 39, 441-7, 9, 44,47-49ESE1-7, 9, 29, 38, 39, 44, 47-49R1039NONE29, 38, 39, 43, 441-7, 43, 44, 47-49SE1-7, 29, 38, 39, 43, 44, 47-49R1139NONE29-31, 38, 39, 43, 441-7, 43, 44,47-49SSE1-7, 29-31, 38, 39, 43, 44, 47-49R1239NONE29-31, 38, 39, 43, 441-4, 6, 7, 43, 44, 47, 48S1-4, 6, 7, 29-31, 38, 39, 43, 44, 47, 48R1339NONE29-31, 38, 39, 43, 441-4, 7, 43, 44SSW1-4, 7, 29-31, 38, 39, 43, 44R1439, 40NONE29-31, 38-40, 43, 441-4, 7, 43, 44SW1-4, 7, 29-31, 38-40, 43, 44R1539, 40NONE29-31, 38-40, 441-4, 7, 44WSW1-4, 7, 29-31, 38-40, 44R1639, 40NONE29, 30, 38-40, 441-4, 7, 44W1-4, 7, 29, 30, 38-40, 44R1724, 26, 39, 40, 454529, 30, 38-40, 44, 451-4, 7, 44, 45WNW1-4, 7, 24, 26, 29, 30, 38-40, 44, 45R1824, 26, 39, 40, 4516, 4529, 38-40, 44, 451-4, 7, 44, 45NW1-4, 7, 16, 24, 26, 29, 38-40, 44, 45R1924, 26, 39, 40, 4516, 4529, 38, 39, 40, 44, 451-4, 7, 8, 44, 45NNW1-4, 7, 8, 16, 24, 26, 29, 38, 39, 40, 44, 45 Indian Point Energy Center7-18KLD Associates, Inc.Evacuation Time EstimateRev. 1Table 7-2. Definition of Evacuation Regions (Concluded)REGIONERPAs INORANGECOUNTYERPAs INPUTNAMCOUNTYERPAs INROCKLANDCOUNTYERPAs IN WESTCHESTERCOUNTYDESCRIPTIONOF REGIONERPAs IN REGION 5 Mile Ring and Sector to EPZ BoundaryR2024-26, 39, 4016-19, 23, 45, 4629-31, 38-401-9, 43, 44, 47-49N1-9, 16-19, 23-26, 29-31, 38-40, 43-49R2124, 26, 39, 4016-20, 23, 45, 4629-31, 38-401-10, 43, 44, 47-49NNE1-10, 16-20, 23, 24, 26, 29-31, 38-40, 43-49R2224,26, 39, 4016-20, 4529-31, 38-401-14, 43, 44, 47-49NE1-14, 16-20, 24,26, 29-31, 38-40, 43-45, 47-49R2324,26, 39, 4016, 18, 19, 20, 4529-31, 38-401-15, 43, 44, 47-49ENE1-16, 18-20, 24,26, 29-31, 38-40, 43-45, 47-49R2424,26, 39, 4016, 18, 20, 4529-31, 38-401-15, 21, 43, 44, 47-50E1-16, 18, 20, 21, 24,26, 29-31, 38-40, 43-45, 47-50R2524,26, 39, 4016, 18, 4529-31, 38-401-9, 11-15, 21, 22, 43, 44,47-51ESE1-9, 11-16, 18, 21, 22, 24,26, 29-31, 38-40, 43-45, 47-5 1R2624,26, 39, 4016, 18, 4529-32, 38-401-9, 12, 13, 21, 22, 42-44, 47-51SE1-9, 12-13, 16, 18, 21-22, 24,26, 29-32, 38-40, 42-45, 47
-51R2724,26, 39, 4016, 18, 4529-35, 38-401-9, 12, 21, 22, 42-44,47-51SSE1-9, 12, 16, 18, 21, 22, 24,26, 29-35, 38-40, 42-45, 47-51R2824,26, 39, 4016, 18, 4529-401-9, 22, 42-44, 47-49, 51S1-9, 16, 18, 22, 24,26, 29-40, 42-45, 47-49, 51R2924,26, 39, 4016, 18, 4529-411-9, 42-44,47-49SSW1-9, 16, 18, 24,26, 29-45, 47-49R3024,26, 39, 4016, 18, 4529-31, 34-411-9, 43, 44, 47-49SW1-9, 16, 18, 24,26, 29-31, 34-41, 43-45, 47-49R3124,26, 28, 39, 4016, 18, 4529-31, 34, 36-411-9, 43, 44,47-49WSW1-9, 16, 18, 24,26, 28-31, 34, 36-41, 43-45, 47-49R3224, 26-28, 39, 4016, 18, 4529-31, 38-411- 9, 43, 44, 47-49W1-9, 16, 18, 24, 26-31, 38-41, 43-45, 47-49R3324-28, 39, 4016, 18, 4529-31, 38-401-9, 43, 44, 47-49WNW1-9, 16, 18, 24-31, 38-40, 43-45, 47-49R3424-28, 39, 4016, 18, 4529-31, 38-401-9, 43, 44, 47-49NW1-9, 16, 18, 24-31, 38-40, 43-45, 47-49R3524-27, 39, 4016-18, 23, 45, 4629-31, 38-401-9, 43, 44, 47-49NNW1-9, 16-18, 23-27, 29-31, 38-40, 43-49 Indian Point Energy Center7-19KLD Associates, Inc.Evacuation Time Estimates Rev. 1 Impacted Evacuation Region:100 Percent Evacuation50 Percent Voluntary Evacuation35 Percent Voluntary EvacuationAssumed EvacuationResponse within the EPZFigure 7-1. Assumed Evacuation Response Indian Point Energy Center7-20KLD Associates, Inc.Evacuation Time Estimates Rev. 1 Shadow Re g ionFigure 7-2. Shadow Evacuation RegionI-684I-87/287I-84I-87IPEC EPZ Indian Point Energy Center7-21KLD Associates, Inc.Evacuation Time Estimates Rev. 1Figure 7-3. Areas of Traffic Congestion30 Minutes after the Evacuation Recommendation Indian Point Energy Center7-22KLD Associates, Inc.Evacuation Time Estimates Rev. 1Figure 7-4. Areas of Traffic Congestion1 Hour after the Evacuation Recommendation Indian Point Energy Center7-23KLD Associates, Inc.Evacuation Time Estimates Rev. 1Figure 7-5. Areas of Traffic Congestion3 Hours after the Evacuation Recommendation Indian Point Energy Center7-24KLD Associates, Inc.Evacuation Time Estimates Rev. 1Figure 7-6. Areas of Traffic Congestion7 Hours after the Evacuation Recommendation Indian Point Energy Center7-25KLD Associates, Inc.Evacuation Time EstimateRev. 1Evacuation Time EstimatesSummer, Midweek, Midday, Good Weather 0 50 100 150 200 250 300 350 400 450060120180240300360420480540600ThousandsElapsed Time After Evacuation Recommendation (Mins)Population Evacuating2-Mile Ring5-Mile RingEntire EPZ 50%90%95%Figure 7-7. Evacuation Time Estimates for IPECSummer, Midweek, Midday, Good WeatherEvacuation of Region R3 (Entire EPZ)