ML11259A048

From kanterella
Revision as of 14:20, 18 March 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search

Seabrook, Request for Closed Meeting to Discuss Proprietary Test
ML11259A048
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 09/12/2011
From: Freeman P
NextEra Energy Seabrook
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
SBK-L-11176
Download: ML11259A048 (2)


Text

NEXTera ENERGY September 12, 2011 SBK-L-1 1176 Docket No. 50-443 U. S. Nuclear Regulatory Commission Attn: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852 Seabrook Station Request for Closed Meeting to Discuss Proprietary Test

Reference:

Summary of February 18, 2011, Public Teleconference with NextEra to Discuss Erosion Testing to be Performed in Support of Debris Interceptor Analysis (ML110750197), March 20, 2011.On February 18, 2011, NextEra Energy Seabrook, LLC (NextEra) and its contractor, Alion Science & Technology (Alion), held a teleconference with members of the NRC staff to discuss planned erosion testing in support of resolution of GSI-191 issues at Seabrook Station.A summary of the teleconference is provided in the above reference.

During the teleconference, NextEra proposed a second teleconference, subsequent to completion of the testing, to discuss the results.The erosion testing has been completed and NextEra requests a teleconference with NRC staff to discuss the results. Due to the proprietary nature of the material to be presented, NextEra respectfully requests that the meeting be closed to the public. The attachment to this letter is a powerpoint presentation of a summary of the erosion testing results and an accompanying affidavit from Alion requesting withholding from public disclosure in accordance with the provisions of 10 CFR 2.390(a)(4).

NextEra Energy Seabrook, LLC, P.O. Box 300, Lafayette Road, Seabrook, NH 03874 U.S. Nuclear Regulatory Commission SBK-L-1 1176 / Page 2 If you have any questions regarding this submittal, please contact Mr. Michael O'Keefe, Licensing Manager, at (603) 773-7745.Sincerely, NextEra Energy Seabrook, LLC Paul Freeman Site Vice President Attachments cc: W.M. Dean, G. E. Miller, W. J. Raymond, NRC Region I Administrator NRC Project Manager, Project Directorate 1-2 NRC Resident Inspector