ML14248A213

From kanterella
Revision as of 11:51, 17 March 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search

Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
ML14248A213
Person / Time
Site: Clinton Constellation icon.png
Issue date: 08/28/2014
From: Kaegi G T
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
EA-12-051, RS-14-197
Download: ML14248A213 (34)


Text

....r Anir- Exelon Generation Order No. EA-12-051 RS-14-197 August 28, 2014 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461

Subject:

Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)

References:

1. NRC Order Number EA-12-051, "Issuance of Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation," dated March 12, 2012
2. NRC Interim Staff Guidance JLD-ISG-2012-03, "Compliance with Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation," Revision 0, dated August 29, 2012
3. NEI 12-02, Industry Guidance for Compliance with NRC Order EA-12-051, "To Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation," Revision 1, dated August 2012
4. Exelon Generation Company, LLC's Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), dated October 25, 2012
5. Exelon Generation Company, LLC Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), dated February 28, 2013 (RS-13-029)
6. Exelon Generation Company, LLC First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), dated August 28, 2013 (RS-13-116)
7. Exelon Generation Company, LLC Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), dated February 28, 2014 (RS 019) 8. NRC letter to Exelon Generation Company, LLC, Clinton Power Station, Unit 1 - Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation (TAO No. MF0791), dated November 15, 2013 U.S. Nuclear Regulatory Commission Integrated Plan Report to EA-12-051 August 28, 2014 Page 2 On March 12, 2012, the Nuclear Regulatory Commission ("NRC" or "Commission") issued an order (Reference 1) to Exelon Generation Company, LLC (EGC). Reference 1 was immediately effective and directs EGC to install reliable spent fuel pool level instrumentation. Specific requirements are outlined in Attachment 2 of Reference 1.

Reference 1 required submission of an initial status report 60 days following issuance of the final interim staff guidance (Reference 2) and an overall integrated plan pursuant to Section IV, Condition C. Reference 2 endorses industry guidance document NEI 12-02, Revision 1 (Reference 3) with clarifications and exceptions identified in Reference 2. Reference 4 provided the EGC initial status report regarding reliable spent fuel pool instrumentation. Reference 5 provided the Clinton Power Station, Unit 1 overall integrated plan.

Reference 1 requires submission of a status report at six-month intervals following submittal of the overall integrated plan. Reference 3 provides direction regarding the content of the status reports. References 6 and 7 provided the first and second six-month status reports, respectively, pursuant to Section IV, Condition 0.2, of Reference 1 for Clinton Power Station.

The purpose of this letter is to provide the third six-month status report pursuant to Section IV, Condition C.2, of Reference 1, that delineates progress made in implementing the requirements of Reference 1. The enclosed report provides an update of milestone accomplishments since the last status report, including any changes to the compliance method, schedule, or need for relief and the basis, if any. The enclosed report also addresses the NRC Interim Staff Evaluation Request for Additional Information Items contained in Reference 8.

This letter contains no new regulatory commitments. If you have any questions regarding this report, please contact David P. Helker at 610-765-5525.

I declare under penalty of perjury that the foregoing is true and correct. Executed on the 28 th day of August 2014.

Respectfully submitted, 7:7 Glen T. Kaegi Director - Licensing & Regulatory Affairs Exelon Generation Company, LLC

Enclosure:

1. Clinton Power Station, Unit 1 Third Six-Month Status Report for the Implementation of Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation U.S. Nuclear Regulatory Commission Integrated Plan Report to EA-12-051 August 28, 2014 Page 3 cc: Director, Office of Nuclear Reactor Regulation NRC Regional Administrator - Region III NRC Senior Resident Inspector - Clinton Power Station, Unit 1 NRC Project Manager, NRR - Clinton Power Station, Unit 1 Ms. Jessica A. Kratchman, NRR/JLD/PMB, NRC Mr. Stephen R. Monarque, NRR/JLD/JPMB, NRC Mr. Robert L. Dennig, NRR/DSS/SCVB, NRC Mr. Blake Purnell, NRR/DORLJLPL3-2, NRC Mr. John Boska, NRR/JLD/MSD, NRC Illinois Emergency Management Agency - Division of Nuclear Safety Enclosure Clinton Power Station, Unit 1 Third Six-Month Status Report for the Implementation of Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (30 pages)

Clinton Power Station, Unit 1 Third Six-Month Status Report for the Implementation of Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation 1 Introduction Clinton Power Station, Unit 1, (CPS) developed an Overall Integrated Plan (Reference 1 in Section 8), documenting the requirements to install reliable Spent Fuel Pool Level Instrumentation (SFPLI), in response to Reference 2. This enclosure provides an update of milestone accomplishments since submittal of the Second Six-Month status report including any changes to the compliance method, schedule, or need for relief/relaxation and the basis, if any.

2 Milestone Accomplishments The following milestones have been completed since the development of the Second Six-Month status report (Reference 7), and are current as of August 28, 2014.

  • Provided responses to all RAls via ePortal on 6/20/14
  • Commenced procurement of equipment
  • SFPI Modification is 50% prepared 3 Milestone Schedule Status The following provides an update to the milestone schedule to support the Overall Integrated Plan. This section provides the activity status of each item, and the expected completion date noting any change. The dates are planning dates subject to change as design and implementation details are developed.

The revised milestone target completion dates do not impact the order implementation date.

Milestone Target Completion Date Activity Status Revised Target Completion Date Submit 60 Day Status Report October 25, 2012 Complete Submit Overall Integrated Plan February 28, 2013 Complete Submit Responses to RAls July 5, 2013 Complete Submit 6 Month Updates:

Update 1 August 28, 2013 Complete Update 2 February 28, 2014 Complete Update 3 August 28, 2014 Complete with Page 1 of 30 Clinton Power Station, Unit 1 Third Six-Month Status Report for the Implementation of SFP LI August 28, 2014 Milestone Target Completion Date Activity Status Revised Target Completion Date this submittal Provide Final Safety Evaluation (SE) Info September 30, 2014 Complete Modifications:

Conceptual Design 302012 Complete Issue Exelon Fleet contract to procure SFPI Equipment 202013 Complete Begin Detailed Engineering Design 402013 Complete Complete and Issue SFPI Modification Package 302014 Started Begin Installation 402014 Not Started Complete SFPI Installation and Put Into Service 202015 Not Started 4 Changes to Compliance Method There are no changes to the compliance method as documented in the Overall Integrated Plan (Reference 1).

5 Need for Relief/Relaxation and Basis for the Relief/Relaxation CPS expects to comply with the order implementation date and no relief/relaxation is required at this time.

6 Open Items from Overall Integrated Plan and Draft Safety Evaluation The following tables provide a summary of the open items documented in the Overall Integrated Plan or the Draft Safety Evaluation (SE) and the status of each item.

Overall Integrated Plan Open Items 01# Description Status Page 2 of 30 Clinton Power Station, Unit 1 Third Six-Month Status Report for the Implementation of SFP LI August 28, 2014 1 (Ref. 1) Open Item:

Corn. lete.

Continuous level indication will be provided by a guided wave radar system, submersible pressure transducer, or other appropriate level sensing technology that will be determined during the detailed engineering phase of the project. (Addressed in Reference 1) 1 RAI Question:

Corn .lete (RAI -1, Ref. a) For Level 1, specify how the identified (Addressed in Reference 4)

4) location represents the higher of the two points described in the NEI 12-02 guidance for this level.

b) A clearly labeled sketch depicting the elevation view of the proposed typical mounting arrangement Page 3 of 30 Clinton Power Station, Unit 1 Third Six-Month Status Report for the Implementation of SFP LI August 28, 2014 for the portions of instrument channel consisting of permanent measurement channel equipment (e.g., fixed level sensors and/or stilling wells, and mounting brackets).

Indicate on this sketch the datum values representing Level 1, Level 2, and Level 3 as well as the top of the fuel racks. Indicate on this sketch the portion of the level sensor measurement range that is sensitive to measurement of the fuel pool level, with respect to the Level 1, Level 2, and Level 3 datum points.

2 RAI Question:

Com .lete (RAI Please provide Provided in the attached preliminary sketch "NRC RAI Question 1".

_2 , a clearly NOTE: The method of grounding the bracket assembly may deviate Page 4 of 30 Clinton Power Station, Unit 1 Third Six-Month Status Report for the Implementation of SFP LI August 28, 2014 Ref. 4) labeled sketch or marked-up plant drawing of the plan view of the SFP area, depicting the SFP inside dimensions, the planned locations/place ment of the primary and backup SFP level sensor, and the proposed routing of the cables that will extend from the sensors toward the location of the read-out/display device. from this sketch when further installation/design details are developed.

3 RAI Question:

Started (RAI Please provide a) All Spent Fuel pool Instrumentation (SFPI) equipment will be the following:

designed in accordance with the Clinton Power Station (CPS) Safe Ref. a).The design criteria that will Shutdown Earthquake (SSE) design requirements.

4) be used to The vendor, Westinghouse, is currently evaluating the structural estimate the integrity of the mounting brackets in calculation CN-PEUS-14-13. The total loading on mounting the GTSTRUDL model will be used by Westinghouse to calculate the stresses in the bracket assembly. This considers load combinations for device(s), including static the dead load, live load and seismic load on the bracket. The reactionary forces calculated from these loads become the design weight loads inputs to design the mounting bracket anchorage to the refuel floor to and dynamic loads. withstand a Safe Shutdown Earthquake (SSE).

Describe the methodology will be Seismic The seismic loads are obtained from the Clin ton that Power Station used to response spectra curves (Reference Updated FSAR Chapter 3 estimate the Figures 3.7 for CPS). The following methodology will be used in Page 5 of 30 Clinton Power Station, Unit 1 Third Six-Month Status Report for the Implementation of SFP LI August 28, 2014 total loading, inclusive of design basis maximum seismic loads and the hydrodynamic loads that could result from pool sloshing or other effects that could accompany such seismic forces. b) A description of the manner in which the level sensor (and stilling well, if appropriate) will be attached to the refueling floor and/or other support structures for each planned point of attachment of the probe assembly.

Indicate in a schematic the portions of the level sensor that will serve as points of attachment for mechanical/mo unting or electrical connections.

c) A description of the manner by which the mechanical connections will attach the level determining the stresses on the bracket assembly:

  • Frequency analysis, taking into account the dead weight and the hydrodynamic mass of the structure, is performed to obtain the natural frequencies of the structure in all three directions.
  • Modal responses are combined using the Ten Percent Method per U.S. NRC Regulatory Guide 1.92, Revision 1, "Combining Modal Responses and Spatial Components in Seismic Response Analysis".

This method is endorsed per Chapter 3 of the Updated FSAR Revision 11 for CPS.

  • The seismic loads for each of the three directions are combined by the Square Root of the Sum of Squares (SRSS) Method.
  • Sloshing analysis is performed to obtain liquid pressure and its impact on bracket design.
  • The seismic results are combined with the dead load results and the hydrodynamic pressure results in absolute sum. These combined results are compared with the allowable stress values.

Sloshing Sloshing forces were obtained by analysis. The TI D-7024, Nuclear Reactors and Earthquakes, 1963, by the US Atomic Energy Commission, approach has been used to estimate the wave height and natural frequency. Horizontal and vertical impact force on the bracket components will be calculated using the wave height and natural frequency obtained using TID-7024 approach. Using this methodology, sloshing forces are calculated and added to the total reactionary forces that would be applicable for bracket anchorage design. The analysis also determines that the level probe can withstand a credible design basis seismic event. During the design basis event, the SFP water level is expected to rise and parts of the level sensor probe are assumed to become submerged in water. The load impact due to the rising water and submergence of the bracket components have also been considered for the overall sloshing impact. Reliable operation of the level measurement sensor with a submerged interconnecting cable has been demonstrated by analysis of previous Westinghouse testing of the cable, and the vendor's cable qualification. Boron build up on the probe has been analyzed to determine the potential effects on the sensor.

The following Westinghouse documents provide information with respect to the design criteria used, and a description of the methodology used to estimate the total loading on the device.

Page 6 of 30 Clinton Power Station, Unit 1 Third Six-Month Status Report for the Implementation of SFP LI August 28, 2014 instrument to permanent SFP structures so as to support the level sensor assembly.

a. CN-PEUS-14-13 -Seismic Analysis of the SFP Mounting bracket at Clinton Power Station
b. LTR-SEE-II-13-47, WNA-TR-03149-GEN - Sloshing Analysis
c. EQ-QR-269, WNA-TR-03149-GEN, EQ-TP-353 - Seismic Qualification of other components of SFPI Clinton Power Station specific calculations mounting details associated with Transmitter and SFPLI Monitors are being developed as part of the Engineering Change package for the modification. The methods used in the calculation will follow IEEE Standard 344-2004 and IEEE Standard 323-2003 for seismic qualification of the instrument.

Calculations - Complete Oct. 15, 2014 b) The level sensor, which is one long probe, will be suspended from the launch plate via coupler/connector assembly. The launch plate is a subcomponent of the bracket assembly, which is mounted to the refuel floor via anchors. Attachment 1 shows a schematic of the level sensor with mechanical attachment points. Note that the connection to station ground may deviate from this sketch as the design details are further established in the Engineering Change (EC) 392333.

Complete c) The bracket assembly that supports the sensor probe and launch plate will be mechanically connected to the Fuel Building structure (see Attachment 1). The mechanical connection consists of four concrete expansion anchors that will bolt the bracket assembly to the Fuel Building structure via the base plate. The concrete expansion anchors will be designed to withstand SSE and will meet the CPS seismic related installation requirements. The qualification details of the bracket will be provided in Westinghouse's Pool-side bracket Seismic Analysis and the qualification of the anchorage to the floor is provided in the supporting CPS specific calculation performed as part of the Engineering Change modification.

Engineering Change - Complete - Nov. 21, 2014 4 (RAI _4 , Ref. 4) RAI Question:

Started Please provide the following:

a) A description of the specific method or combination of methods that will be a) Beyond Design Basis Environment - Westinghouse qualified the components (probe, connector, cable) of the SFPI located in the SFP area to the beyond design basis environment. Components of the system were subjected to beyond design basis conditions of heat and humidity, thermal and radiation aging mechanisms. This testing confirmed functionality of these system components under these beyond design basis environmental conditions. Westinghouse performed testing to ensure aging of the components in the SFP area will not have a significant effect on the ability of the equipment to Page 7 of 30 Clinton Power Station, Unit 1 Third Six-Month Status Report for the Implementation of SFP LI August 28, 2014 applied to demonstrate the reliability of the permanently installed equipment under beyond-design-basis (BDB) ambient temperature, humidity, shock, vibration, and radiation conditions.

b) A description of the testing and/or analyses that will be conducted to provide assurance that the equipment will perform reliably under the worst-case credible design basis loading at the location where the equipment will be mounted. Include a discussion of this seismic reliability demonstration as it applies to (i) the level sensor mounted in the SFP area, and (ii) any control boxes, electronics, or read-out and perform following a plant design basis earthquake. Exelon has reviewed the documents and found them acceptable. Reference Westinghouse documents EQ-TP-351, WNA-TR-03149-GEN, and EQ-TP-354 for description of specific qualification methods.

Mild Environment - Westinghouse qualified the system components (display panel, sensor) that reside in the mild environment conditions to determine that the components can satisfactorily perform to those conditions. Westinghouse has determined that aging does not have a significant effect on the ability of the equipment to perform following a plant design basis earthquake. Exelon has reviewed the documents and found them acceptable. Reference Westinghouse documents EQ-QR-269, WNA-TR-03149-GEN for description of specific methods.

The habitability of the monitor display locations will be maintained as part of the FLEX strategies, and therefore, the readout display in the Auxiliary and Control Buildings will not be subject to harsh environmental or radiological conditions.

Shock and Vibration - SFPI pool side brackets will be analyzed for Safe Shutdown Earthquake design requirements per NRC order EA-12-051 and NEI 12-02 guidance. As provided by the NRC Order EA-12-051, the NEI 12-02 guidance and as clarified by the NRC interim staff guidance, the probe, coaxial cable, and the mounting brackets are "inherently resistant to shock and vibration loadings." As a result, no additional CPS site specific shock and vibration testing is required for these components. SFPI pool side brackets for both the primary and backup Westinghouse SFP measurement channels will be permanently installed and fixed to rigid refuel floors, which are Seismic Category 1 structures. The SFPI system components, such as level sensor and its mounting bracket were subjected to seismic testing, including shock and vibration test requirements. The results for shock and vibration tests were consistent with the anticipated shock and vibration expected to be seen by mounted equipment. The level monitoring electronics is enclosed in a NEMA-4X housing which is a seismic rated stainless steel housing as well. These housings will be seismicly mounted to a seismically qualified wall and structure and will contain the active electronics, and aid in protecting the internal components from vibration induced damage.

Reference Westinghouse reports WNA-DS-02957, WNA-TR-03149-GEN for shock and vibration.

Complete b) The seismic adequacy of the SFPI (all components) is demonstrated by vendor testing and analysis in accordance with below listed standards:

IEEE 344-2004, IEEE Recommended Practice for Seismic Page 8 of 30 Clinton Power Station, Unit 1 Third Six-Month Status Report for the Implementation of SFP LI August 28, 2014 re- transmitting devices that will be employed to convey the level Qualification of Class lE Electrical Equipment for Nuclear Power Generating Stations

  • IEEE-323-1974, Standard for Qualifying Class lE Equipment for Nuclear Power Generating Stations
  • A calculation which will be prepared in support of the plant Engineering Change for mounting the SFPLI monitoring equipment operators or (Pool Side Bracket, Transmitter and Display Enclosure).

emergency responders.

c) A Seismic adequacy of the level sensor probe supporting bracket within the SFP area was demonstrated by analysis as discussed in response description of to RAI-3.

the specific method or Complete combination c) Westinghouse has seismically qualified the SFPI instrument of methods and its components. A CPS specific calculation and EQ analysis will that will be be developed which supports the Pool-side Bracket Seismic Analysis used to and EQ requirements. With the instrument being seismically qualified confirm the and installed as described in RAI 2 response, including the monitor reliability of the permanently display in the Auxiliary and Control Building, the instrument is assured to maintain reliable and accurate indication when required.

installed Westinghouse report WNA-CN-00301-GEN and Clinton Power Station equipment Engineering Change 392333, in development, will provide the details such that of the equipment accuracy from measurement to display.

following a seismic event the instrument will maintain its required accuracy.

Engineering Change - Complete - Nov. 21, 2014 5 RAI Question:

Started (RAI Please provide a) The two channels proposed locations of the spent fuel probe the following:

and mounting meet the requirements of NEI 12-02 section 3.2 -

Ref. a) A description of Arrangement. More specifically, to ensure adequate channel

4) how the two separation, the level sensor for the primary channel will be mounted channels of the approximately 6'-6" east of the southwest corner of the pool while the proposed level level sensor backup channel will be mounted approximately 13'-9" measurement south of the northeast corner of the pool. This means the two level system meet sensors are separated by a distance of approximately 34' which is a this requirement so longer distance than the shorter dimension of the spent fuel pool as that the specified by NEI 12-02 guidance.

Page 9 of 30 Clinton Power Station, Unit 1 Third Six-Month Status Report for the Implementation of SFP LI August 28, 2014 potential for a common cause Complete event to b) The information related to physical separation, is depicted in adversely the attached sketch NRC RAI Question 1, which shows the location of affect both the probe and mounting brackets, cable routing for the two individual channels is transmitters, and the cable routing and location of the monitors in the minimized to the extent Auxiliary Building and the Control Building. The independent power practicable.

sources will be described in the Clinton Power Station Engineering b) Further Change number 392333 and will consist of powering each train from a information on how each level separate Motor Control Center.

measurement system, consisting of level sensor electronics, cabling, and readout devices will be designed and installed to address independence through the application and selection of independent power sources, the use of physical and spatial separation, independence of signals sent to the location(s) of the readout devices, and the independence of the displays.

Engineering Change- Complete- Nov. 21, 2014 6 RAI Question:

Replaced by Interim SE RAI #8. (RAI Please provide

_6, the following:

Ref. a) A description

4) of the electrical AC Page 10 of 30 Clinton Power Station, Unit 1 Third Six-Month Status Report for the Implementation of SFP LI August 28, 2014 power sources and capacities for the primary and backup channels.

b) If the level measurement channels are to be powered through a battery system (either directly or through an Uninterruptible Power Supply (UPS)), please provide the design criteria that will be applied to size the battery in a manner that ensures, with margin, that the channel will be available to run reliably and continuously following the onset of the BDB event for the minimum duration needed, consistent with the plant mitigation strategies for BDB external events (Order EA-12-049).

Page 11 of 30 Clinton Power Station, Unit 1 Third Six-Month Status Report for the Implementation of SFP LI August 28, 2014 RAI Question:

Please provide the following:

a) An estimate of the expected instrument channel accuracy performance under both (a) normal SFP level conditions (approximate!

y Level 1 or higher) and (b) at the BOB conditions (i.e., radiation, temperature, humidity, post-seismic and post-shock conditions) that would be present if the SFP level were at the Level 2 and Level 3 datum points.

b) A description of the methodology that will be used for determining the maximum allowed deviation from the instrument channel design accuracy that will be employed under normal Started a) The Westinghouse documents WNA-CN-00301 and WNA-DS-02957-GEN describe the channel accuracy under both (a) normal SFP level conditions and (b) at the Beyond Design Basis (BDB) conditions that would be present if SFP level were at Level 2 and Level 3 datum points. Each instrument channel will be accurate to within +/-3"during normal spent fuel pool level conditions. The instrument channels will retain this accuracy after BDB conditions, in accordance with the above Westinghouse documents. This value is within the channel accuracy requirements of the Order (+/-1 foot).

Complete b) The Westinghouse document WNA-TP-04709- describes the methodology for routine testing/calibration verification and calibration methodology. This document also specifies the required accuracy criteria under normal operating conditions. Clinton Power Station calibration and channel verification procedures will follow the guidance and criteria provided in this document.

Instrument channel calibration will be performed if the level indication reflects a value that is outside the acceptance band established in the Clinton Power Station calibration and channel verification procedures.

Instrument channel loop accuracy and set point deviation/error will be addressed in the Engineering Change (EC) 392333 and details will be provided in the 4th six (6) month update in 2014.

Calibration will be performed at a frequency consistent with Technical Specificaiton equipmet that relates to refueling outages once per 24 months for Clinton Power Station. Consitent with Westinghouse document WNA-TP-04709-GEN, calibration on a SFP level channel will be completed within 60 days of the 24 month period considering normal testing scheduling allowances (e.g. 25%). This is in compliance with the NEI 12-02 guidance for Spent Fuel Pool Instrumentation.

Engineering Change - Complete - Nov. 21, 2014 7 (RAI -7, Ref. 4) Page 12 of 30 Clinton Power Station, Unit 1 Third Six-Month Status Report for the Implementation of SFP LI August 28, 2014 operating conditions as an acceptance criterion for a calibration procedure to flag to operators and to technicians that the channel requires adjustment to within the normal condition design accuracy.

8 RAI Question:

Started (RAI Please a) Westinghouse calibration procedure WNA-TP-04709-GEN and

_8 , provide the functional test procedure WNA-TP-04613-GEN describe the Ref. following:

capabilities and provisions of SFPI periodic testing and calibration, 4) a) A description of including in-situ testing. Clinton Power Station will use these documents as the basis for doing the SFPI periodic testing and and calibration.

provisions the proposed Procedure Issue - Feb. 20, 2015 level sensing b) The level displayed by the channels will be verified per the equipment will Clinton Power Station administrative and operating procedures, as have to enable recommended by Westinghouse vendor technical manual WNA-GO-periodic 00127-GEN. If the level is not within the required accuracy per testing and calibration, including how Westinghouse recommended tolerance in WNA-TP-04709-GEN, channel calibration will be performed.

this capability enables the equipment to Procedure Issue - Feb. 20, 2015 c) Functional checks will be performed per Westinghouse be tested functionality test procedure WNA-TP-04613-GEN at the Westinghouse situ. recommended recommended frequency. Calibration tests will be performed per b) A Westinghouse calibration procedure WNA-TP-04709-GEN at the description of Westinghouse recommended frequency. In accordance with Clinton how such Power Station (CPS) maintenance and operating programs, CPS will testing and develop calibration, functional test, channel verification procedures per calibration will Westinghouse recommendations to ensure reliable, accurate and enable the continuous SFPI functionality by February, 2015. This action will be conduct of regular tracked as part of the Engineering Change 392333 Design Attribute Page 13 of 30 Clinton Power Station, Unit 1 Third Six-Month Status Report for the Implementation of SFP LI August 28, 2014 channel checks of each independent channel against the other, and against any other permanently-installed SFP level instrumentatio

n. c) A description of how functional checks will be performed, and the frequency at which they will be conducted.

Describe how calibration tests will be performed, and the frequency at which they will be conducted.

Provide a discussion as to how these surveillances will be incorporated into the plant surveillance program. d) A description of what preventive maintenance tasks are required to be performed Review process as defined in CC-AA-102, "Design Input and Configuration Change Impact Screening" procedure.

Procedure Issue - Feb. 20, 2015 d) CPS will develop preventive maintenance tasks for the SFPI per Westinghouse recommendation identified in the technical manual WNA-G0-00127-GEN to assure that the channels are fully conditioned to accurately and reliably perform their functions when needed by February, 2015. This action will be tracked as part of the Engineering Change 392333 Design Attribute Review process as defined in CC-AA-102, "Design Input and Configuration Change Impact Screening" procedure.

Preventive Maintenance Task defined - Feb. 20, 2015 Page 14 of 30 Clinton Power Station, Unit 1 Third Six-Month Status Report for the Implementation of SFP LI August 28, 2014 during normal operation, and the planned maximum surveillance interval that is necessary to ensure that the channels are fully conditioned to accurately and reliably perform their functions when needed.

9 RAI Question:

Replaced by Interim SE RAI #11 (RAI Please _g , Ref. provide the following:

4) a) The specific location for the primary and backup instrument channel displays.

b) If the primary and backup displays are not located in the main control room, please provide a description of the selected location(s) for the primary and backup displays, including prompt accessibility to displays, primary and alternate route Page 15 of 30 Clinton Power Station, Unit 1 Third Six-Month Status Report for the Implementation of SFP LI August 28, 2014 evaluation, habitability at display location(s), continual resource availability for personnel responsible to promptly read displays, and provisions for communicatio ns with decision makers for the various SFP drain down scenarios and external events. c) The reasons justifying why the locations selected will enable the information from these instruments to be considered "promptly accessible" to various drain-down scenarios and external events. 10 RAI Question:

Replaced by Interim SE RAI #12. (RAI Please -10, Ref. provide a description of

4) the standards, guidelines and/or criteria that will be utilized to Page 16 of 30 Clinton Power Station, Unit 1 Third Six-Month Status Report for the Implementation of SFP LI August 28, 2014 develop procedures for inspection, maintenance, repair, operation, abnormal response, and administrative controls associated with the SFP level instrumentatio n, as well as storage and installation of portable instruments.

11 RAI Question:

Started (RAI Please Response for a:

-11, Ref. 4) provide the following:

a. ) Further Information Performance tests (functional checks) and Operator performance checks will be described in detail in the vendor operator's manual WNA-TP-04613-GEN, and the applicable information is planned to be describing the maintenance contained in plant operating procedures.

and testing Operator performance tests are planned to be performed periodically program the licensee will establish and as recommended by the equipment vendor.

implement to Channel functional tests per operations procedures with limits ensure that established in consideration of vendor equipment specifications are regular testing planned to be performed at appropriate frequencies established and calibration is equivalent to or more frequently than existing SFPI.

performed and Manual calibration and operator performance checks are planned to verified by be performed in a periodic scheduled fashion with additional inspection maintenance on an as-needed basis when flagged by the system's and audit to demonstrate conformance automated diagnostic testing features.

with design Channel calibration tests per maintenance procedures with limits and system established in consideration of vendor equipment specifications are readiness requirements.

planned to be performed at frequencies established in consideration of Page 17 of 30 Clinton Power Station, Unit 1 Third Six-Month Status Report for the Implementation of SFP LI August 28, 2014 Please include a description of your plans for ensuring that necessary channel checks, functional tests, periodic calibration, and maintenance will be conducted for the level measurement system a nd its supporting equipment.

b) A description of how the guidance in NEI12-02, Section 4.3 regarding compensatory actions for one or both non- functioning channels will be addressed.

c) A description of what compensatory actions are planned in the event that one of the instrument channels cannot be restored to functional status within 90 days. vendor recommendations.

SFPI channel/equipment maintenance/preventative maintenance and testing program requirements to ensure design and system readiness are planned to be established in accordance with Exelon's processes and procedures and in consideration of vendor recommendations to ensure that appropriate regular testing, channel checks, functional tests, periodic calibration, and maintenance is performed (and available for inspection and audit). Subject maintenance and testing program requirements are planned to be developed during the SFPI modification design process.

Complete Feb. 20, 2015 Response for b, c:

Both primary and backup SFPI channels incorporate permanent installation (with no reliance on portable, post-event installation) of relatively simple and robust augmented quality equipment. Permanent installation coupled with stocking of adequate spare parts reasonably diminishes the likelihood that a single channel (and greatly diminishes the likelihood that both channels) is (are) out-of-service for an extended period of time. Planned compensatory actions for unlikely extended out-of-service events will be controlled by procedure(s) that address the Diverse and Flexible Coping Strategies (Flex) and Spent Fuel Pool Instrumentation Program Implementation and are summarized as follows:

  1. Channel(s)

Out-of- Service Required Restoration Action Compensatory Action if Required Restoration Action not completed within Specified Time 1 Restore Channel to functional status within 90 days. Immediately initiate action in accordance with note below 2 Initiate action within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to restore one channel to functional status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

Immediately initiate action in accordance with note below Page 1 8 of 30 Clinton Power Station, Unit 1 Third Six-Month Status Report for the Implementation of SFP LI August 28, 2014 Note: Present a report to the on-site Plant Operations Review Committee (PORC) within the following 14 days. The report shall outline the planned alternate method of monitoring, the cause of the non-functionality, and the plans and schedule for restoring the instrumentation channel(s) to functional status.

Complete - Define Actions in Procedure(s) - Feb. 20, 2015 Draft Safety Evaluation Open Items 01# Description Status 1 RAI Question:

Started (RA For RAI 2(a)

The following Westinghouse documents provide the analyses used to verify 1-3 , above, please the design criteria and describe the methodology for seismic testing of the SFP Ref. provide the instrumentation and electronics units, inclusive of design basis maximum

5) analyses seismic loads and hydrodynamic loads that could result from pool sloshing and used to verify other effects that could accompany such seismic forces:

the design criteria and

a. CN-PEUS-14 Seismic Analysis of the SFP Mounting Bracket at methodology Clinton Power Station for seismic testing of the
b. LTR-SEE-11-13-47, WNA-TR-03149-GEN - Sloshing Analysis SFP c. EQ-QR-269, WNA-TR-03149-GEN, EQ-TP-353 - Seismic Qualification instrumentati on and the of other components of SFP1 electronics failures No equipment were noted as a result of seismic test runs. Seismic test units, including, design basis maximum data has been documented in the seismic test reports, referenced above.

CPS specific calculations which support the Engineering Change modification will address the seismic qualification of the monitors and transmitters. The seismic loads design criteria used in these calculations satisfies the requirements to and the withstand a SSE and will meet the CPS seismic related installation hydrodynami requirements for mounting the readout displays and transmitters in the c loads that Auxiliary Building and Control Building.

could result from pool sloshing or other effects that could accompany such seismic forces. Site Specific Calculations - Complete - Sept. 30, 2014 Page 19 of 30 Clinton Power Station, Unit 1 Third Six-Month Status Report for the Implementation of SFP LI August 28, 2014 2 (RA 1-4, Ref. 5) RAI Question:

Started will be updated/provided when the design analysis for (EC) 392333 has been completed.

Complete - Nov. 21, 2014 For each of the mounting attachments required to attach SFP level equipment to plant structures, please describe the design inputs, and the methodology that was used to qualify the structural integrity of the affected structures/eq uipment. This is in progress and the Engineering Change Engineering Change -

3 (RA 1-6, Ref. 5) RAI Question:

Started the test conditions used by Westinghouse to qualify the are also documented in Westinghouse documents EQ-TP-354 LTR-SFPIS-13-35, and WNA-Conditions for SFPI Components installed in at Clinton Power Station will be verified as bounded Summary. The materials with which the probe are resistant to radiation effects. The stainless steel probe can withstand 40 year dose.

the design specification (WNA-DS-02957-GEN) and 1 documentation to include the above technical for SFPI Components in the Spent Fuel Pool Area coupler and connector assembly, launch plate and coax cable are designed and qualified to operate environmental conditions.

WNA-TR-03149-GEN, Environmental Revision For RAI #5 above, please provide the results for the selected methods, tests and analyses used to de monstrate the qualification and reliability of the installed equipment in accordance with the Order requirements.

Below SFPI. the as and Level pool EQ-QR-269, DS-02957-GEN.

stainless Westinghouse LTR-SFPIS-13-35, justification.

Environmental reliably is a summary of These test conditions Spent Fuel Pool Area part of EC 392333 Design the anchor are manufactured steel anchor and updated Conditions sensor probe, coax side bracket assembly, in the below specified Parameter Normal BDB Temperature 50-140°F 212°F Pressure Atmospheric Atmospheric Page 20 of 30 Clinton Power Station, Unit 1 Third Six-Month Status Report for the Implementation of SFP LI August 28, 2014 The Humidity 0-95% RH 100% (saturated steam)

Radiation TID y (above pool) 1E03 Rads 1E07 Rads Radiation TID y (12" above top of fuel rack) 1E09 Rads(probe and weight only) 1E07 Rads Environmental bracket environmental Conditions Outside of the Spent Fuel Pool Area level sensor transmitter and bracket, electronics display enclosure and are designed and qualified to operate reliably in the below specified conditions.

Parameter Normal BDB BDB (Level Sensor Electronics Only)

Temperature 50-120°F 140°F 140°F Pressure Atmospheric Atmospheric Atmospheric Humidity 0-95% RH 0-95% (non- condensing) 0-95% (non-condensing)

Duration 3 days 3 days 3 days Radiation TID y 5 1E03 R y 5 1E03 R 5. 1E03 R Clinton specific calculations which support the seismic installation and environmental analysis of the display enclosures and transmitters will be included on the affected Document List (ADL) for the Engineering Change (EC) 392333.

Thermal and Radiation Aging - organic components in SFP area Westinghouse documents EQ-QR-269, EQ-TP-354, WNA-TR-03149-G EN provide thermal and radiation aging program details for the SFPI components.

Westinghouse completed their thermal and radiation aging testing programs to qualify the SFPI components to 1.25 years. Exelon has reviewed the documents and found acceptable.

Additionally, Westinghouse is continuing their aging tests to age the system components to 10 years. These tests are projected to be completed towards end of Summer 2014. Final test reports are scheduled to be provided to Exelon by September 4, 2014. Exelon will complete the test report reviews by Page 21 of 30 Clinton Power Station, Unit 1 Third Six-Month Status Report for the Implementation of SFP LI August 28, 2014 September 30, 2014.

Seismic Category I Testing Seismic qualification testing performed by Westinghouse along with the technical evaluations performed by Westinghouse confirm that the SFPI meets the seismic requirements of NEI 12-02. Westinghouse's design and supporting analysis satisfies the Clinton Power Station installation requirements to withstand a SSE.

Vibration Justification As specified in RAI-2, components of the system i.e., bracket, transmitter enclosure, display enclosure, and readout display in the Auxiliary and Control Building, will be permanently installed to meet the requirements to withstand a SSE and will meet the Clinton Power Station seismic related installation requirements. Westinghouse has analyzed the pool side bracket to withstand design basis SSE. Other components of the SFPI were subjected to shock and vibration during the seismic testing and met the requirements necessary for mounted equipment.

Sloshing Justification The sloshing calculation developed by Westinghouse will be reviewed for a design basis seismic event for acceptability as part of Engineering Change 392333 preparation. Sloshing forces will be taken into consideration for the anchorage design of the pool side bracket to ensure the bracket is rigidly mounted to include sloshing affects.

Engineering Change - Complete - Nov. 21, 2014 4 RAI Question:

Started (RA Please provide a) The Clinton Power Station (CPS) electrical ac power sources for the 1-8, the following:

primary and backup Spent Fuel Pool Level Indication channels will be two Ref. a) A separate Balance of Plant Motor Control Centers fed from different Unit

5) description of Subs. The details of this power will be defined in the CPS Engineering the electrical ac power Change 392333.

sources and capacities for Engineering Change - Complete - Nov. 21, 2014 the primary b) The Westinghouse Report, WNA-CN-00300-GEN, provides the results and backup of the calculation depicting the battery backup duty cycle. This calculation channels.

demonstrates that battery capacity is 4.22 days to maintain the level b) Please indicating function to the display location, located in the Control and provide the Auxiliary Building. The results of the calculation meet the NEI 12-02 results of the calculation requirements. Reference Section 5.4.1. of Ref 2.

depicting the battery backup duty cycle requirements Complete Page 22 of 30 Clinton Power Station, Unit 1 Third Six-Month Status Report for the Implementation of SFP LI August 28, 2014 demonstrating that its capacity is sufficient to maintain the level indication function until of resource availability is reasonably assured. 5 RAI Question:

Corn

  • lete (RA Please a) The specific location of the primary and backup instrument channel I- provide the display (monitor) is depicted on the attached sketch, NRC RAI Question 1.

11, Ref. following:

a) The Complete 5) specific b) Clinton Power Station will have a display near the Remote (alternate) location for Shutdown Panel as shown on the attached sketch NRC RAI Question 1. This the primary location was selected since it has been proven that it can be accessed without and backup unreasonable delay during an event including a BDB event and is analyzed for instrument channel Remote Shutdown Panel design basis accident radiation and habitability display .

conditions. Time to access this display is the same as that addressed in the b) If a display UFSAR for access to the Remote Shutdown Panel. This area BDB condition is will be addressed in RAI #6, "Environmental Conditions Outside of the Spent Fuel located Pool Area". The Display Enclosure (monitor) will be periodically checked as somewhere other than the control room or alternate shutdown panel, please describe the evaluation used to validate that the display location can be accessed without unreasonable delay following a part of Operator rounds.

Complete BDB event.

Include the time Page 23 of 30 Clinton Power Station, Unit 1 Third Six-Month Status Report for the Implementation of SFP LI August 28, 2014 available for personnel to access the display as credited in the evaluation, as well as the actual time (e.g., based on walk-throughs) that it will take for personnel to access the display. Additionally, please include a description of the radiological and environmenta I conditions on the paths personnel might take.

Describe whether the display location remains habitable for radiological, heat and humidity, and other environmenta I conditions following a BDB event.

Describe whether personnel are continuously stationed at the display or monitor the display Page 24 of 30 Clinton Power Station, Unit 1 Third Six-Month Status Report for the Implementation of SFP LI August 28, 2014 periodically.

6 RAI Question:

Started (RA Please provide The procedures will be assigned and developed as part of the Engineering I- a list of the Change (EC) Design Attribute Review process in accordance with CC-AA-102 12, procedures "Design Input and Configuration Change Impact Screening". The procedures Ref. addressing numbers, titles and technical objectives will be developed prior to the EC being

5) ' operation (both normal Released for Operations.

and abnormal response), calibration, test, maintenance, and inspection procedures that will be developed for use of the SFP instrumentatio

n. The licensee is requested to include a brief description of the specific technical objectives to be achieved within each procedure.

Procedures - Complete - Feb. 20, 2015 7 Potential Draft Safety Evaluation Impacts There are no potential impacts to the Draft Safety Evaluation identified at this time.

8 References The following references support the updates to the Overall Integrated Plan described in this enclosure.

1. Exelon Generation Company, LLC, letter to USNRC, "Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements Page 25 of 30 Clinton Power Station, Unit 1 Third Six-Month Status Report for the Implementation of SFP LI August 28, 2014 for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)", dated February 28, 2013 (RS 029).
2. NRC Order Number EA-12-051, "Issuance of Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation", dated March 12, 2012.
3. USNRC letter to Exelon Generation Company, LLC, Request for Additional Information Regarding Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation, dated June 7, 2013.
4. Exelon Generation Company, LLC, letter to USNRC, "Response to Request for Additional Information - Overall Integrated Plan in Response to Commission Order Modifying License Requirements for Reliable Spent Fuel Pool Instrumentation (Order No. EA 051)", dated July 3,2013 (RS-13-157).
5. USNRC letter to Exelon Generation Company, LLC, "Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation", dated November 15, 2013.
6. First Six-Month Status Report for the Implementation of Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation, dated August 28, 2013 (RS-13-116).
7. Second Six-Month Status Report for the Implementation of Order EA-12-051, Order Modifying Licenses with Regard to Rliable Spent Fuel Pool lnstrumentaiton, dated February 28, 2014 (RS-14-019).

Page 26 of 30 Clinton Power Station, Unit 1 Third Six-Month Status Report for the Implementation of SFP LI August 28, 2014 - CPS Schematic of the level Sensor with Mechanical Attachment Points Page 27 of 30

- 9 'Aft 293W - 25' 8W NRC RAI Question 1 EAQEtQF3 cLINTQN POWER STATION SPENT FUEL POOL LEVEL INDICATION PROJECT PLANNNED CABLE_RATHSAND.COMPONENT LOCATION SKETQB t"'"'"-* - rwitte - * -; Z"." FUEL BUILDING EL. 755-0" AREA 2

  • --- 1
  • A, *-' 1.11*211M-
  • -.-.-,. Wt. Acrs A FUEL BUILDING EL. 755

.-0" AREA 5 t=6::::*17" ZA:Z4 1514. \ if t.= * " - - * * = r ' , .1447 BALT' , "

  • 7 ran BACKUP LVI. SENSOR

=en- 2 , 2 _ srurtra I t4111:Af.

a=..- I MO' 441.44,4:

OROVI;r-i Waii 61 31 , 0M:wt. I lut.tz...

-r kratqa, I 10.11b it:1Was rein, %AAA : t UEL BUILDING EL. 755'-0" AR RIVAR, OA. SENSOR Clinton Power Station, Unit 1 Third Six-Month Status Report for the Implementation of SFP LI August 28, 2014 Page 28 of 30

- . '

  • 2S11. n : ,maaaerti Leip. NAV z4T. f CON TROL BU IL DIN G EL. 762'-0" AREA 4 NRC RAI Question 1 PAGE 2 OF 3 CLINTON POWER STATION SPENT FUEL POOL LEVEL INDICATION PROJECT PLANNNED CABLE PATHS AND COMPONENT LOCATION SKETCH GYM CASt NY*Olt Z*2 4** 741.i 1-3f7. .4-11 Clinton Power Station, Unit 1 Third Six-Month Status Report for the Implementation of SFP LI August 28, 2014 AUXILIARY BUILDING EL. 762

.-0" AREA 5

..04W.VAM 4.0 , Oft, MP. 34116",6 GWR CABLE BRACKET cA

  • Al v.k I PL
  • f - GWR CABLE BRACKET ARRANGEMENT AT SOUTH SIDE OF FUEL POOL (REF. S-28-1403 / SECT. 28-3)

Page 29 of 30 A A,-

  • emit=*/ iT 1-7 RECOUP ELECTRONIC3 ENCLOSURE CONTROL Buil DING.

EL. TEZEIT AREA

  • smatzr.-."--4 ?wet csogourocil - '1..1I 0.T.S*'.  :--A-..: 11.4 , 11 , 1*1;: o...t o - -1T/SIILLT..

-MLSO. .f , _ .....cm x ,...; .c...,,,,,, 1 z)- ..1.%7: 14...%ro: ,...., per....,.H.0.7;-z t..4 g.Z. lei ?1,.*

A.4ON-11:c.nnuovv.so.

litt:711 ty rc. y An V' -onge.tt.oeurtcrormovatt

M.:4 _,..,.. De TIM E? ---......., .",...,,

..., r,j..,* - O'CO14 , 11:703.-*

f----..../011,702

, 4 , 4*41 1 1-0101C Stant u* NCENNLIL ,,,, Ts.r.....a , C"...466 , 0, S,..41,84.; . ..s sf.CLTSSA: Liteif 0145*JVC .1..,./-9. mord coons N. kr:4=C rairrfe

.; "OF td*7*04,/

\ 4'17 :Y 7F......" 171 7- 'Ctil i i" A lt'?* - mow RN?"- a-' I N\ c4,4-441 t*S018 Iv\ a r ccm!._, - Nem.- Lik -War- sown f ox.r. , ex*. PRIMARY ELECTRONICS ENCLOSURE AUXALART ELLE:1NC EL TS13'.AREA (TE AUXILIARY BUILDING EL. 781-0" AREA 5 Corms *** 110-

  • 40:11 I tlf,3 flt.41-73e-4 Clinton Power Station, Unit 1 Third Six-Month Status Report for the Implementation of SFP LI August 28, 2014 CONTROL BUILDING EL. 762-0" AREA 4 NRC RAI Question 1 PAGE 3 OF 3 CLINTON POWER STATION SPENT FOP _BLOQI I FVFI

_INDICATION PROJECT PLANNNED CABLE PATHS AND COMPONENT LOCATION SK_EICH Page 30 of 30