MONTHYEARL-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes IR 05000266/20240112024-09-18018 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000266/2024011 and 05000301/2024011 L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-145, Notification of Deviation from EPRI MRP-227, Revision 1-A Baffle Bolt Inspection Frequency2024-09-0909 September 2024 Notification of Deviation from EPRI MRP-227, Revision 1-A Baffle Bolt Inspection Frequency ML24207A0202024-08-28028 August 2024 Response to Request for Re-Engagement Regarding the Subsequent License Renewal Environmental Review for Point Beach Nuclear Plant, Units 1 and 2 (Docket Numbers: 50-0266 and 50-0301) IR 05000266/20240052024-08-21021 August 2024 Updated Inspection Plan for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2024005 and 05000301/2024005) IR 05000266/20240022024-08-13013 August 2024 Integrated Inspection Report 05000266/2024002 and 05000301/2024002 L-2024-131, Response to Request for Additional Information Regarding License Amendment Request 300, Modify Containment Average Air Temperature Requirements2024-08-0909 August 2024 Response to Request for Additional Information Regarding License Amendment Request 300, Modify Containment Average Air Temperature Requirements ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review ML24214A3092024-08-0202 August 2024 Confirmation of Initial License Examination L-2024-113, License Amendment Request 294, Application to Revise Technical Specifications to Adopt TSTF- 577, Revised Frequencies for Steam Generator Tube Inspections2024-07-24024 July 2024 License Amendment Request 294, Application to Revise Technical Specifications to Adopt TSTF- 577, Revised Frequencies for Steam Generator Tube Inspections L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24194A1802024-07-24024 July 2024 – Revision to the Reactor Vessel Material Surveillance Capsule Withdrawal Schedule IR 05000266/20244012024-07-23023 July 2024 Public - Point Beach Nuclear Plant Cyber Security Inspection Report 05000266/2024401 and 05000301/2024401 ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan L-2024-116, Preparation and Scheduling of Operator Licensing Examinations2024-07-11011 July 2024 Preparation and Scheduling of Operator Licensing Examinations L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal IR 05000266/20240102024-07-10010 July 2024 Age-Related Degradation Inspection Report 05000266/2024010 and 05000301/2024010 L-2024-105, License Amendment Request 300, Modify Containment Average Air Temperature Requirements2024-06-26026 June 2024 License Amendment Request 300, Modify Containment Average Air Temperature Requirements L-2024-107, Schedule for Subsequent License Renewal Environmental Review2024-06-25025 June 2024 Schedule for Subsequent License Renewal Environmental Review ML24176A2242024-06-24024 June 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter L-2024-093, Steam Generator Divider Plate Assemblies Bounding Analysis Evaluation for Aging Management Commitment 14 Revision2024-06-10010 June 2024 Steam Generator Divider Plate Assemblies Bounding Analysis Evaluation for Aging Management Commitment 14 Revision IR 05000266/20244202024-06-0505 June 2024 Security Baseline Inspection Report 05000266/2024420 and 05000301/2024420 ML24149A1922024-05-28028 May 2024 Notification of NRC Baseline Inspection and Request for Information ML24141A1382024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection.Docx ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes IR 05000266/20243012024-04-29029 April 2024 NRC Initial License Examination Report 05000266/2024301; 05000301/2024301 L-2024-067, Annual Monitoring Report2024-04-26026 April 2024 Annual Monitoring Report ML24116A0402024-04-23023 April 2024 Periodic Update of the Updated Final Safety Analysis Report ML24071A0912024-04-22022 April 2024 Issuance of Relief Request I6-RR-03 - Extension of the Unit 2 Steam Generator Primary Nozzle Dissimilar Metal Welds Sixth 10-Year Inservice Inspection Program Interval IR 05000266/20240012024-04-11011 April 2024 Integrated Inspection Report 05000266/2024001 and 05000301/2024001 L-2024-030, Supplement to Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements2024-03-27027 March 2024 Supplement to Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements L-2024-043, Revised Reactor Vessel Materials Surveillance Capsule Withdrawal Schedules2024-03-25025 March 2024 Revised Reactor Vessel Materials Surveillance Capsule Withdrawal Schedules L-2024-011, and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2024-03-13013 March 2024 and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications IR 05000266/20230062024-02-28028 February 2024 Annual Assessment Letter for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2023006 and 05000301/2023006) ML24053A3732024-02-22022 February 2024 Operator Licensing Examination Approval Point Beach, March 2024 L-2024-020, Refueling Outage Owners Activity Report (OAR-1) Unit 1 for Inservice Inspections2024-02-22022 February 2024 Refueling Outage Owners Activity Report (OAR-1) Unit 1 for Inservice Inspections ML24036A2652024-02-0505 February 2024 Notice of Inspection and Request for Information for the NRC Age-Related Degradation Inspection: Inspection Report 05000266/2024010 and 05000301/2024010 IR 05000266/20230042024-02-0101 February 2024 Integrated Inspection Report 05000266/2023004 and 05000301/2023004 ML24030A0352024-01-30030 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection L-2024-001, Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements2024-01-26026 January 2024 Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML24005A3242024-01-24024 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0040 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23352A2752024-01-23023 January 2024 Issuance of Amendment Nos. 274 and 276 Regarding Revision to Technical Specification 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-174, Subsequent License Renewal Application - Third Annual Update2023-12-13013 December 2023 Subsequent License Renewal Application - Third Annual Update L-2023-176, Supplement to Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, 2024-09-09
[Table view] Category:Manual
MONTHYEARNRC 2019-0034, Technical Requirements Manual Change Summary2019-10-18018 October 2019 Technical Requirements Manual Change Summary NRC 2020-0009, Appendix 2 - Offsite Dose Calculation Manual, Revision 212019-01-30030 January 2019 Appendix 2 - Offsite Dose Calculation Manual, Revision 21 NRC 2018-0026, Submittal of Technical Requirements Manual Change Summary2018-05-0202 May 2018 Submittal of Technical Requirements Manual Change Summary NRC 2018-0016, Update of Final Safety Analysis Report, Appendix T, Technical Requirements Manual2018-05-0202 May 2018 Update of Final Safety Analysis Report, Appendix T, Technical Requirements Manual NRC 2012-0044, Technical Requirements Manual Change Summary2012-06-12012 June 2012 Technical Requirements Manual Change Summary NRC 2011-0106, License Renewal Commitment Reactor Vessel Lnternals Program Submittal2011-12-19019 December 2011 License Renewal Commitment Reactor Vessel Lnternals Program Submittal ML14342A1502009-12-0909 December 2009 Nextera Energy Point Beach, LLC Point Beach Nuclear Plant, Units 1 and 2, Revision 53 of Emergency Plan ML0918106912009-06-25025 June 2009 Transmittal of Replacement Figure 7.6-3 on Page 7.6-23 of 25 for FSAR Manual No. 80 NRC 2008-0014, Pressure and Temperature Limits Report2008-02-27027 February 2008 Pressure and Temperature Limits Report ML0612902402005-09-28028 September 2005 EM Environmental Manual ML0612902322005-08-29029 August 2005 Enclosure 2, Offsite Dose Calculation Manual (ODCM) Revision 17 Issued August 2005 ML0626504102005-08-10010 August 2005 Np 1.7.5, Fitness for Duty Policy and Procedure ML0626504092005-08-10010 August 2005 Np 1.7.16 Collection Site Protocol ML0626802172004-12-22022 December 2004 Np 1.7.1, Security Expectations ML0515804872004-10-29029 October 2004 Offsite Dose Calculation Manual, Revision 16 ML0626802112004-10-13013 October 2004 Np 1.7.3, Site Specific Requirements for Access to and Termination from Point Beach Nuclear Plant ML0626802002004-06-23023 June 2004 Np 1.7.18, Unscheduled Work Period (Uwp) Call-In ML0626801742004-03-24024 March 2004 Np 1.7.19, For-Cause Testing (Reasonable Suspicion) ML0306304342003-02-0606 February 2003 Excerpt from Manual Chapter 0305 on Action Matrix Guidance for Old Design Issues ML0626503752002-11-22022 November 2002 Np 1.7.17 Fitness for Duty - Continual Behavior Observation Program ML0212802482002-04-30030 April 2002 Part 1 of 2, Point Beach Nuclear Plant, Units 1 & 2 - Annual Monitoring Report for 2001 ML0307307472002-03-0606 March 2002 Plant Procedure Np 7.2.3, Engineering Change Requests, Revision 6 2019-10-18
[Table view] |
Text
May 2, 2018 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 Technical Requirements Manual Change Summary NRC 2018-0026 10 CFR 50.71(e) In accordance with 1 0 CFR 50.71 (e), NextEra Energy Point Beach, LLC (NextEra), is submitting changes made to the Point Beach Nuclear Plant Technical Requirements Manual (TRM). The enclosure contains the TRM change summary for the period January 1, 2016, through March 31, 2018. NextEra previously submitted the TRM change summary for January 1, 2015, through December 31, 2015, on August 17, 2016 (ML 16230A369).
This letter contains no new commitments and no revisions to existing commitments.
If you have any questions or require additional information, please contact me at (920) 755-7854.
Sincerely, NextEra Energy Point Beach, LLC r-fs ..
p, ") cl.-\{'1*-tv tfl... Eric Schultz Licensing Manager Enclosure cc: Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC NextEra Energy Point Beach, LLC 6610 Nuclear Road, Two Rivers, WI 54241 Affected Section 1.0 3.4.4 3.7.2 3.7.6 4.1 4.4 4.8 4.12 4.13 4.15 4.16 4.17 4.18 ENCLOSURE NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 TECHNICAL REQUIREMENTS MANUAL CHANGE
SUMMARY
FOR JANUARY 1, 2016-MARCH 31, 2018 Affected Date of Change Page(s) Summary August 2017 1.0-2 Updated references.
July 2017 3.4.4-5 Added that this program is part of the lnservice Testing Program. October 2016 All Rewrote to clarify alignment with TS 3.0.2 and TS 3.0.6. February 2018 3.7.6-3, 7 Changed Functionality test of crossover steam dump valves from 31 days to 6 months. March 2017 All Updated to reflect changes made to ODCM. March 2017 All Updated to reflect changes made to ODCM. January 2016 All Updated references and definition of Plugging Criteria.
September 2017 4.12-1, 2, Updated references.
3, 7 August 2017 4.13-2 Updated references.
July 2017 4.15-2 Added that this program is part of the lnservice Testing Program. July 2017 4.16-1 Added that this program is part of the lnservice Testing Program. January 2017 4.17-1 Updated the applicable code. June 2016 4.18-1 Updated references.
Page 1 of 1 May 2, 2018 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 Technical Requirements Manual Change Summary NRC 2018-0026 10 CFR 50.71(e) In accordance with 1 0 CFR 50.71 (e), NextEra Energy Point Beach, LLC (NextEra), is submitting changes made to the Point Beach Nuclear Plant Technical Requirements Manual (TRM). The enclosure contains the TRM change summary for the period January 1, 2016, through March 31, 2018. NextEra previously submitted the TRM change summary for January 1, 2015, through December 31, 2015, on August 17, 2016 (ML 16230A369).
This letter contains no new commitments and no revisions to existing commitments.
If you have any questions or require additional information, please contact me at (920) 755-7854.
Sincerely, NextEra Energy Point Beach, LLC r-fs ..
p, ") cl.-\{'1*-tv tfl... Eric Schultz Licensing Manager Enclosure cc: Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC NextEra Energy Point Beach, LLC 6610 Nuclear Road, Two Rivers, WI 54241 Affected Section 1.0 3.4.4 3.7.2 3.7.6 4.1 4.4 4.8 4.12 4.13 4.15 4.16 4.17 4.18 ENCLOSURE NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 TECHNICAL REQUIREMENTS MANUAL CHANGE
SUMMARY
FOR JANUARY 1, 2016-MARCH 31, 2018 Affected Date of Change Page(s) Summary August 2017 1.0-2 Updated references.
July 2017 3.4.4-5 Added that this program is part of the lnservice Testing Program. October 2016 All Rewrote to clarify alignment with TS 3.0.2 and TS 3.0.6. February 2018 3.7.6-3, 7 Changed Functionality test of crossover steam dump valves from 31 days to 6 months. March 2017 All Updated to reflect changes made to ODCM. March 2017 All Updated to reflect changes made to ODCM. January 2016 All Updated references and definition of Plugging Criteria.
September 2017 4.12-1, 2, Updated references.
3, 7 August 2017 4.13-2 Updated references.
July 2017 4.15-2 Added that this program is part of the lnservice Testing Program. July 2017 4.16-1 Added that this program is part of the lnservice Testing Program. January 2017 4.17-1 Updated the applicable code. June 2016 4.18-1 Updated references.
Page 1 of 1