MONTHYEARML24281A1362024-10-0707 October 2024 NRR E-mail Capture - (External_Sender) Acceptance Review - Hatchs Revise Technical Specifications to Adopt TSTF-591 LAR (L-2024-LLA-0122) ML24278A0052024-10-0303 October 2024 Document Request for Hatch Nuclear Plant - IP 92702 Follow-Up Radiation Protection Inspection - Inspection Report 2024-04 ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24211A0162024-07-26026 July 2024 NRR E-mail Capture - Request for Additional Information - Hatch, Units 1 and 2, Revise TS SRs (3.4.3.1 & 3.1.7.7) to Increase SRV Setpoints LAR ML24194A0032024-07-11011 July 2024 NRR E-mail Capture - Fyi - Acceptance Review - Farley, Hatch, and Vogtle 1 and 2 - Alternative Request for Code Case N-572 ML24193A1182024-07-10010 July 2024 Email to SNC with RAI for Hatch Exemption Request ML24170A9362024-06-18018 June 2024 NRR E-mail Capture - Fyi - Change to Estimated Completion Date for the SNC Fleet Physical Barrier Exemptions (L-2023-LLE-0018 and L-2023-LLE-0021) ML24142A4992024-05-21021 May 2024 NRR E-mail Capture - Acceptance Review - Farley and Hatch - LAR to Revise TS 1.1 and Add Online Monitoring (OLM) Program (L-2024-LLA-0058) ML24138A1582024-05-17017 May 2024 NRR E-mail Capture - (External_Sender) Acceptance Review - Hatchs Revise TS Surveillance Requirements to Increase SRV Setpoints LAR (L-2024-LLA-0054) ML24100A4402024-04-0909 April 2024 NRR E-mail Capture - (External_Sender) RAI - Hatch, Units 1 and 2, Revise Technical Specifications to Adopt Extended RICTs for RHRSW and Psw Systems LAR ML24100A0072024-04-0808 April 2024 NRR E-mail Capture - (External_Sender) for Your Comments - State of Georgia - Hatch Units 1 and 2 - Relax Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs ML24082A1212024-03-21021 March 2024 NRR E-mail Capture - (External_Sender) Re Acceptance Review - Hatchs Adopt Alternative Seismic Method for 50.69 Categorization of SSCs LAR (L-2024-LLA-0017) ML24067A0702024-03-0707 March 2024 NRR E-mail Capture - Change in Estimated Review Completion for Hatch Revise TS Table 1.1-1 (Modes) LAR (L-2022-LLA-0120) ML24009A1112024-01-0909 January 2024 NRR E-mail Capture - Acceptance Review - Hatch 1&2 LAR - Revise TS 3.7.1 & 3.7.2 to Adopt Risk-Informed Completion Times for RHRSW and Psw Systems (L-2023-LLA-0169) ML23354A2032023-12-18018 December 2023 Document Request for Hatch Nuclear Plant - Radiation Protection Inspection - Inspection Report 2024-01 ML23264A0142023-09-14014 September 2023 NRR E-mail Capture - (External_Sender) Draft Round-2 RAI - Hatch, Units 1 and 2, Revise TS 1.1-1 Modes LAR ML23249A2082023-09-0606 September 2023 NRR E-mail Capture - Change in Estimated Review Schedule and Level of Effort for Hatch 'Revise TS Table 1.1-1 (Modes)' LAR (L-2022-LLA-0120) ML23223A0142023-08-10010 August 2023 NRR E-mail Capture - Acceptance Review - SNC Fleet Exemption to 10 CFR 73.2, Physical Barriers ML23198A1552023-07-17017 July 2023 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Hatch, Farley, and Vogtle, Units 1 and 2 Quality Assurance Topical Report (QATR) Submittal Dated June 15, 2023 ML23135A0922023-05-11011 May 2023 NRR E-mail Capture - Acceptance Review - SNC Fleet Request to Use Specific Provision of a Later Edition of the ASME BPV Code, Section XI (L-2023-LLR-0016) ML23073A0252023-03-13013 March 2023 NRR E-mail Capture - Fyi - Closeout the Evacuation Time Estimate (ETE) Reviews for SNC Fleet ML23065A0922023-03-0505 March 2023 NRR E-mail Capture - Revised Estimate Hours and Completion Date - Hatch RPV Head Closure Bolts LAR (L-2022-LLA-0120) ML23033A0952023-02-0202 February 2023 NRR E-mail Capture - (External_Sender) Re for Your Comments - State of Georgia - Hatch Units 1 and 2 - Relax Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs ML23033A0282023-01-30030 January 2023 NRR E-mail Capture - Revised Estimates for Hatch RPV Studs LAR ML23026A0132023-01-19019 January 2023 NRR E-mail Capture - Revised Estimates for Hatch RPV Studs LAR ML23018A1872023-01-17017 January 2023 2023 HNP CGD Inspection Information Request ML23006A0662023-01-0505 January 2023 NRR E-mail Capture - (External_Sender) for Your Comments - State of Georgia - Hatch Units 1 and 2 - Revise NFPA-805 License Amendment Request ML22355A2082022-12-21021 December 2022 NRR E-mail Capture - RAI - Hatch, Units 1 and 2, Reactor Pressure Vessel 'Rpv Head Studs' LAR ML23006A0252022-12-13013 December 2022 NRR E-mail Capture - (External_Sender) for Your Comments - State of Georgia - Hatch Units 1 and 2 - TSTF-208 License Amendment Request ML22341A1212022-12-0606 December 2022 NRR E-mail Capture - Recap of Takeaways from Hatch Audit on Dec 1, 2022 ML23026A2372022-11-16016 November 2022 2023001 Hatch RP RFI Final ML22305A7032022-11-0101 November 2022 NRR E-mail Capture - Potential Audit for Hatch'S 'Rpv Head Studs' LAR ML22258A1532022-09-15015 September 2022 NRR E-mail Capture - Acceptance Review - Hatch Closure Studs in TS Table 1.1-1 Modes LAR (L-2022-LLA-0120) ML22251A1322022-09-0808 September 2022 NRR E-mail Capture - Fyi - Hatch TSTF-505 LAR ML22208A1332022-07-26026 July 2022 NRR E-mail Capture - RAI - Hatch, Units 1 and 2, TSTF-208 LAR ML22207B8532022-07-25025 July 2022 NRR E-mail Capture - RCI - Hatch, Units 1 and 2, Revision to NFPA-805 LAR ML22157A3542022-06-0606 June 2022 NRR E-mail Capture - RAI - Hatch, Units 1 and 2, TSTF-505 LAR ML22157A3552022-06-0606 June 2022 NRR E-mail Capture - Revised Estimates - Hatch TSTF-505 LAR ML22140A1192022-05-20020 May 2022 NRR E-mail Capture - RAIs - Hatch, Units 1 and 2, TSTF-505 LAR ML22138A4122022-05-18018 May 2022 NRR E-mail Capture - Acceptance Review - Hatch TSTF-208 LAR (L-2022-LLA-0045) ML22140A1182022-05-13013 May 2022 NRR E-mail Capture - for Your Action: Hatch TSTF-505 - Follow Up from Audit Question 12 ML22116A1492022-04-26026 April 2022 NRR E-mail Capture - Acceptance Review - Hatch Revise NFPA 805 LAR (L-2022-LLF-0000) ML22055A6652022-02-24024 February 2022 NRR E-mail Capture - Acceptance Review - Hatch TSTF-580 LAR (L-2022-LLA-0022) ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML21357A0912021-12-23023 December 2021 NRR E-mail Capture - Acceptance Review - Hatch TSTF-207-A LAR (L-2021-LLA-0219) ML21354A5942021-12-20020 December 2021 NRR E-mail Capture - Acceptance Review - Hatch TSTF-227 and TSTF-297 LAR (L-2021-LLA-0227) ML21347A9002021-12-13013 December 2021 NRR E-mail Capture - Updated Request: Additional Request for SNC to Place Document on the Portal ML21347A8532021-12-13013 December 2021 NRR E-mail Capture - Required: Hatch TSTF-505 LAR - Audit Plan - Additional Documents to Be Uploaded to the Portal ML21363A0872021-12-0606 December 2021 NRR E-mail Capture - (External_Sender) Question - Hatch - Eliminate Automatic Main Steam Line Isolation on High Turbine Building Area Temperature (L-2021-LLA-0188) ML21321A3812021-11-16016 November 2021 NRR E-mail Capture - Acceptance Review - Hatch TSTF-505 LAR (L-2021-LLA-0199) 2024-09-04
[Table view] |
Text
1 NRR-PMDAPEm Resource From: Orenak, Michael Sent: Friday, February 17, 2017 2:05 PM To: Joyce, Ryan M.; McElroy, G. Ken Cc:CRPIERCE (CRPIERCE@southernco.com); Markle y, Michael; Rudland, David; Dijamco, David
Subject:
Verbal Authorization for Relief Request HNP-ISI-RR-05-01 Ryan and Ken, Below is the script for the verbal authorization of relief request HNP-ISI-RR-05-01 that was provided at approximately 1:10 pm EDT on 2/17/2017 by David Rudland and Michael Markley.
As I stated during the call, a written relief request authorization will be issued within 150 days from today if the relief is needed.
Please let us know the results of the attempt to remove the stud by COB 1/20.
Mike VERBAL AUTHORIZATION BY THE OFFICE NUCLEAR REGULATION FOR RELIEF REQUEST HNP-ISI-RR-05-01 TEMPORARY RELIEF FROM REQUIREMENTS OF IWB-3515 OF SECTION XI OF THE ASME CODE EDWIN I. HATCH NUCLEAR PLANT, UNIT 2 SOUTHERN NUCLEAR OPERATING COMPANY, INC.
DOCKET NO. 50-366 FEBRUARY 17, 2017 Technical Evaluation read by David Rudland, Chief of the Vessels and Internals Integrity Branch, NRR By letter dated February 17, 2017, Southern Nuclear Operating Company, Inc. (the licensee) requested relief from the requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),Section XI, IWB-3515.2(c), at Edwin I. Hatch Nuclear Plant, Unit 2, which specifies surface examination requirements for the reactor pressure vessel (RPV) studs. Specifically, the relief is pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 50.55a(g)(5)(iii) on the basis that complying with the required surface examination of IWB-3515.2(c) is impractical.
On February 10, 2017, the licensee notified the U.S. Nuclear Regulatory Commission (NRC) that during the volumetric examination of the 56 RPV studs of the Hatch, Unit 2 RPV closure flange, it had detected an indication in stud location number 33. IWB-3515.2(c) of Section XI of the ASME Code requires surface examination of the stud if an indication is found through volumetric examination. The licensee has indicated that they may not be able to remove the stud during the current refueling outage (2R24), and therefore it is impractical to meet the requirements of IWB-3515.2(c) of Section XI of the ASME Code. For contingency planning, the licensee requested relief from the surfac e examination requirements in case the planned removal of the stud at location number 33 is not successful.
The licensee requested relief from the required surface examination to allow the stud to be untensioned during full power operations. As a basis, the licensee developed structural evaluations to determine the impact of the untensioned stud to the remaining 55 RPV studs and the ASME code stress and fatigue limits. The NRC staff reviewed the structural evaluations. The increased primary membrane stress on the remaining studs is below the design stress allowable value for the stud material.
Additionally, the evaluations demonstrate that leaving 2one untensioned stud in service does not cause exceedance of the ASME Code stress and fatigue limits in the remaining studs and RPV closure flange. Finally, the evaluations show that the increase in flange interface separation is less than the allowable separation.
The NRC staff finds that the licensee provided reasonable assurance of structural integrity of the remaining RPV 55 studs and RPV closure flange at Hatch, Unit 2 if stud at location number 33 is left untensioned in service until the beginning of the next refueling outage (2R25). Therefore, the NRC staff concludes that complying with the required surface examination is impractical and grants relief from IWB-3515.2(c) of Section XI of the ASME Code for RPV stud location number 33.
3Authorization read by Michael Markley, Chief of the Plant Licensing Branch II-1, NRR As Chief of the Plant Licensing Branch II-1, Office of Nuclear Reactor Regulation, I agree with the conclusions of the Vessels and Internals Integrity Branch.
The NRC staff finds that the licensee has provided reasonable assurance of structural integrity of the remaining studs and the RPV closure flange if the stud at location number 33 is left untensioned in service.
The NRC staff concludes that complying with IWB-3515.2(c) of Section XI of the ASME Code is impractical and that the licensee addressed all of the regulatory requirements set forth in 10 CFR 50.55a(g)(5)(iii). Therefore, as of February 17, 2017, the NRC grants Relief Request HNP-ISI-RR-05-01 for the Edwin I. Hatch Nuclear Plant, Unit 2, until the beginning of the next refueling outage (2R25).
All other requirements in ASME Code,Section XI, for which relief was not specifically requested and approved in this relief request remain applicable, including third-party review by the Authorized Nuclear Inservice Inspector.
This verbal authorization does not preclude the NRC sta ff from asking additional clarifying questions regarding Relief Request HNP-ISI-RR-05-01 while preparing the subsequent written safety evaluation.
Hearing Identifier: NRR_PMDA Email Number: 3352 Mail Envelope Properties (Michael.Orenak@nrc.gov20170217140400)
Subject:
Verbal Authorization for Relief Request HNP-ISI-RR-05-01 Sent Date: 2/17/2017 2:04:44 PM Received Date: 2/17/2017 2:04:00 PM From: Orenak, Michael Created By: Michael.Orenak@nrc.gov Recipients: "CRPIERCE (CRPIERCE@southernco.com)" <CRPIERCE@southernco.com> Tracking Status: None "Markley, Michael" <Michael.Markley@nrc.gov>
Tracking Status: None "Rudland, David" <David.Rudland@nrc.gov> Tracking Status: None "Dijamco, David" <David.Dijamco@nrc.gov> Tracking Status: None "Joyce, Ryan M." <RMJOYCE@southernco.com>
Tracking Status: None "McElroy, G. Ken" <GKMCELRO@southernco.com> Tracking Status: None
Post Office: Files Size Date & Time MESSAGE 4840 2/17/2017 2:04:00 PM
Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received: