CNL-18-006, Technical Specification Change - Reactor Coolant Temperature Indicator Inoperable - Exigent Amendment (391-WBN-TS-2018-01)
From kanterella
Revision as of 17:01, 27 January 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Letter Sequence Other | |
---|---|
Administration | |
MONTHYEARML0431404762004-11-19019 November 2004
[Table View]Exigent License Amendment, Provide One-Time Change to Function 4a of TS Table 3.3.4-1 Regarding Inoperable Reactor Coolant System Temperature Indicator Project stage: Other ML0432403052004-11-19019 November 2004 Enclosure 1, Technical Specification Pages, Exigent Amendment No. 53, Inoperable Reactor Coolant System Temperature Indicator Project stage: Other CNL-15-108, Technical Specification (TS) Change - Reactor Coolant Temperature Indicator Inoperable - Exigent Amendment (WBN-TS-2015-12)2015-05-29029 May 2015 Technical Specification (TS) Change - Reactor Coolant Temperature Indicator Inoperable - Exigent Amendment (WBN-TS-2015-12) Project stage: Request ML15155A4612015-06-0202 June 2015 NRR E-mail Capture - Draft RAI for the WBN1 Exigent Amendment (MF6286) Project stage: Draft RAI ML15154A6532015-06-0202 June 2015 NRR E-mail Capture - FW: Clarification Question for the WBN1 Exigent Amendment (MF6286) Project stage: Other ML15152A4732015-06-0303 June 2015 Public Notice of Application for Amendment to Facility Operating License Project stage: Other ML15152A4652015-06-0303 June 2015 Letter Regarding Public Notice of Application for Amendment to Facility Operating License Project stage: Other CNL-15-112, Response to Draft RAI Regarding Watts Bar Nuclear Plant, Unit 1 Exigent Amendment2015-06-0505 June 2015 Response to Draft RAI Regarding Watts Bar Nuclear Plant, Unit 1 Exigent Amendment Project stage: Request ML15160A4072015-06-12012 June 2015 Issuance of Amendment Re. Application for TS Under Exigent Circumstances to Allow Temperature Indicator for Reactor Coolant System Loop 4 to Be Inoperable for the Remainder of Operating Cycle 13 Project stage: Approval CNL-18-006, Technical Specification Change - Reactor Coolant Temperature Indicator Inoperable - Exigent Amendment (391-WBN-TS-2018-01)2018-01-10010 January 2018 Technical Specification Change - Reactor Coolant Temperature Indicator Inoperable - Exigent Amendment (391-WBN-TS-2018-01) Project stage: Other 2015-06-02 |
ML18010B043 | |
Person / Time | |
---|---|
Site: | Watts Bar ![]() |
Issue date: | 01/10/2018 |
From: | Shea J W Tennessee Valley Authority |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
391-WBN-TS-2018-01, CNL-18-006, TAC MC4979, TAC MF6286 | |
Download: ML18010B043 (29) | |
Similar Documents at Watts Bar | |
---|---|
Category:Letter type:CNL
MONTHYEARCNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024
[Table view]Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions CNL-24-016, Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-01-10010 January 2024 Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) CNL-23-052, Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability2024-01-0909 January 2024 Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability CNL-23-062, Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018)2024-01-0808 January 2024 Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018) CNL-23-069, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation CNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)2023-12-18018 December 2023 Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) CNL-23-001, Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01)2023-12-13013 December 2023 Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01) CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-059, Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-2023-09-20020 September 2023 Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 CNL-23-045, License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010)2023-08-0707 August 2023 License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010) CNL-23-028, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)2023-08-0202 August 2023 Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06) CNL-23-055, Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills2023-07-25025 July 2023 Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills CNL-23-053, Tennessee Valley Authority - Radiological Emergency Plan Revisions2023-07-18018 July 2023 Tennessee Valley Authority - Radiological Emergency Plan Revisions CNL-23-020, Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06)2023-06-28028 June 2023 Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06) CNL-23-049, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan .2023-06-26026 June 2023 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan . CNL-23-044, Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out2023-06-0101 June 2023 Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out CNL-23-042, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-05-16016 May 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-043, Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09)2023-05-0404 May 2023 Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09) CNL-23-030, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update2023-04-27027 April 2023 Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-23-032, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 412023-04-27027 April 2023 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 41 CNL-23-033, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-04-24024 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-23-029, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-04-11011 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-023, Annual Insurance Status Report2023-03-30030 March 2023 Annual Insurance Status Report CNL-23-022, Decommissioning Funding Status Report2023-03-29029 March 2023 Decommissioning Funding Status Report CNL-23-024, TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report2023-03-29029 March 2023 TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report CNL-23-002, Application to Revise Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications to Change the Number of Tritium Producing Burnable Absorber Rods (WBN-TS-21-02) and Proposed Revision to Reactor Vessel Surveillance Capsule Removal Sche2023-03-20020 March 2023 Application to Revise Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications to Change the Number of Tritium Producing Burnable Absorber Rods (WBN-TS-21-02) and Proposed Revision to Reactor Vessel Surveillance Capsule Removal Schedu CNL-23-021, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-03-0808 March 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-015, Expedited Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-22-08)2023-02-27027 February 2023 Expedited Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-22-08) CNL-23-003, Browns Nuclear Plant, Units 1, 2 & 3; Sequoyah Nuclear Plant, Units 1 & 2; and Watts Bar Nuclear Plant, Units 1 & 2 - Organizational Topic Report TVA-NPOD89-A2023-01-30030 January 2023 Browns Nuclear Plant, Units 1, 2 & 3; Sequoyah Nuclear Plant, Units 1 & 2; and Watts Bar Nuclear Plant, Units 1 & 2 - Organizational Topic Report TVA-NPOD89-A CNL-23-009, Response to Request for Additional Information Request to Revise Technical Specification 3.4.122023-01-0404 January 2023 Response to Request for Additional Information Request to Revise Technical Specification 3.4.12 CNL-23-008, Tennessee Valley Authority Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-12-22022 December 2022 Tennessee Valley Authority Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-22-109, Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements2022-12-22022 December 2022 Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements CNL-22-101, American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative WBN-2-ISI-012022-11-28028 November 2022 American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative WBN-2-ISI-01 CNL-22-106, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-14, Revision 38, Nuclear Emergency Public Information Organization and Operat2022-11-28028 November 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-14, Revision 38, Nuclear Emergency Public Information Organization and Operatio CNL-22-099, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update2022-10-31031 October 2022 Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-22-098, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC EPIP-7, Rev. 45 & CECC EPIP-8, Rev. 552022-10-17017 October 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC EPIP-7, Rev. 45 & CECC EPIP-8, Rev. 55 CNL-22-085, Response to Request for Additional Information Regarding Sequoyah Nuclear Plant (Sqn), Units 1 and 2 and Watts Bar Nuclear Plant (Wbn), Units 1 and 2, American Society of Mechanical Engineers Operation and Maintenance Code, Request for Al2022-09-0202 September 2022 Response to Request for Additional Information Regarding Sequoyah Nuclear Plant (Sqn), Units 1 and 2 and Watts Bar Nuclear Plant (Wbn), Units 1 and 2, American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alte CNL-22-077, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-08-11011 August 2022 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-22-030, Application to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System for Sequoyah Nuclear Plant (SQN-TSC-22-01) and TS 3.4.12 Cold Overpressure Mitigation System for Watts Bar Nuclear Plant (WBN-TS-22-03)2022-07-27027 July 2022 Application to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System for Sequoyah Nuclear Plant (SQN-TSC-22-01) and TS 3.4.12 Cold Overpressure Mitigation System for Watts Bar Nuclear Plant (WBN-TS-22-03) CNL-22-039, Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04)2022-07-13013 July 2022 Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04) CNL-22-071, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (SQN-TS-21-03 and WBN-TS-21-08)2022-07-13013 July 2022 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (SQN-TS-21-03 and WBN-TS-21-08) CNL-22-070, Status Regarding the Improved Flood Mitigation System Project2022-06-30030 June 2022 Status Regarding the Improved Flood Mitigation System Project CNL-22-008, and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002)2022-06-13013 June 2022 and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002) CNL-22-064, Response to Request for Additional Information Regarding Tennessee Valley Authority License Amendment Request to Revise Emergency Plan Implementing Procedure Regarding Seismic Event Emergency Action Level Change2022-06-0909 June 2022 Response to Request for Additional Information Regarding Tennessee Valley Authority License Amendment Request to Revise Emergency Plan Implementing Procedure Regarding Seismic Event Emergency Action Level Change CNL-22-068, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-06-0808 June 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-22-047, Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2022-05-23023 May 2022 Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions CNL-22-043, Response to Request for Additional Information and Confirmation of Information Regarding Application to Modify Watts Bar Nuclear Plant Units 1 and 2 Technical Specification 3.7.8 to Support Shutdown Board.2022-05-0202 May 2022 Response to Request for Additional Information and Confirmation of Information Regarding Application to Modify Watts Bar Nuclear Plant Units 1 and 2 Technical Specification 3.7.8 to Support Shutdown Board. CNL-22-046, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan.2022-04-28028 April 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan. 2024-01-09 Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50 MONTHYEARCNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)2023-12-18018 December 2023
[Table view]Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) CNL-23-059, Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-2023-09-20020 September 2023 Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 CNL-23-045, License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010)2023-08-0707 August 2023 License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010) CNL-23-028, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)2023-08-0202 August 2023 Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06) CNL-23-043, Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09)2023-05-0404 May 2023 Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09) CNL-23-002, Application to Revise Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications to Change the Number of Tritium Producing Burnable Absorber Rods (WBN-TS-21-02) and Proposed Revision to Reactor Vessel Surveillance Capsule Removal Sche2023-03-20020 March 2023 Application to Revise Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications to Change the Number of Tritium Producing Burnable Absorber Rods (WBN-TS-21-02) and Proposed Revision to Reactor Vessel Surveillance Capsule Removal Schedu CNL-23-015, Expedited Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-22-08)2023-02-27027 February 2023 Expedited Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-22-08) CNL-22-030, Application to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System for Sequoyah Nuclear Plant (SQN-TSC-22-01) and TS 3.4.12 Cold Overpressure Mitigation System for Watts Bar Nuclear Plant (WBN-TS-22-03)2022-07-27027 July 2022 Application to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System for Sequoyah Nuclear Plant (SQN-TSC-22-01) and TS 3.4.12 Cold Overpressure Mitigation System for Watts Bar Nuclear Plant (WBN-TS-22-03) CNL-22-071, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (SQN-TS-21-03 and WBN-TS-21-08)2022-07-13013 July 2022 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (SQN-TS-21-03 and WBN-TS-21-08) CNL-22-039, Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04)2022-07-13013 July 2022 Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04) CNL-22-008, and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002)2022-06-13013 June 2022 and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002) CNL-22-001, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (SQN-TS-21-03 and WBN-TS-21-08)2022-04-0404 April 2022 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (SQN-TS-21-03 and WBN-TS-21-08) CNL-22-003, Application to Modify the Allowable Value for Watts Bar Nuclear Plant, Unit 1 Technical Specification Table 3.3.2-1, Function 6.e(1) (WBN-TS-21-010)2022-02-17017 February 2022 Application to Modify the Allowable Value for Watts Bar Nuclear Plant, Unit 1 Technical Specification Table 3.3.2-1, Function 6.e(1) (WBN-TS-21-010) CNL-21-018, Application to Adopt TSTF-205-A, Revision of Channel Calibration, Channel Functional Test, and Related Definitions, and TSTF-563-A, Revise Instrument Testing Definitions to Incorporate the Surveillance .2021-12-0909 December 2021 Application to Adopt TSTF-205-A, Revision of Channel Calibration, Channel Functional Test, and Related Definitions, and TSTF-563-A, Revise Instrument Testing Definitions to Incorporate the Surveillance . CNL-21-062, Application to Modify Watts Bar Nuclear Plant Units 1 and 2 Technical Specification 3.7.8 to Support Shutdown Board Cleaning (WBN-TS-19-019)2021-09-29029 September 2021 Application to Modify Watts Bar Nuclear Plant Units 1 and 2 Technical Specification 3.7.8 to Support Shutdown Board Cleaning (WBN-TS-19-019) ML21202A2242021-07-0202 July 2021 Tennessee Valley Authority (TVA)- Watts Bar Nuclear Plant (WBN)- NPDES Permit No. TN0020168-Application Request for Permit Renewal CNL-21-038, Application to Revise the Measurement Units for the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for the Containment Vent Isolation Instrumentation and Control Room Emergency Ventilation System Radiation Monitors (W2021-06-0101 June 2021 Application to Revise the Measurement Units for the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for the Containment Vent Isolation Instrumentation and Control Room Emergency Ventilation System Radiation Monitors (WBN CNL-21-045, Bellefonte Nuclear Plant, Units 1 and 2; Browns Ferry Nuclear Plant, Units 1, 2, and 3; Clinch River Nuclear Site; Sequoyah Nuclear Plant, Units 1 and 2; Watts Bar Nuclear Plant, Unit 1 and 2 - Nuclear Quality Assurance Plan, TVA-NQA-PLN82021-04-29029 April 2021 Bellefonte Nuclear Plant, Units 1 and 2; Browns Ferry Nuclear Plant, Units 1, 2, and 3; Clinch River Nuclear Site; Sequoyah Nuclear Plant, Units 1 and 2; Watts Bar Nuclear Plant, Unit 1 and 2 - Nuclear Quality Assurance Plan, TVA-NQA-PLN89- CNL-21-013, Application to Modify Technical Specifications Steam Generator Inspection/Repair Program Provisions and Unit 2 Facility Operating License Condition 2.C.(4) (WBN-TS-20-06)2021-03-11011 March 2021 Application to Modify Technical Specifications Steam Generator Inspection/Repair Program Provisions and Unit 2 Facility Operating License Condition 2.C.(4) (WBN-TS-20-06) CNL-21-015, Expedited Application to Modify Watts Bar Nuclear Plant, Unit 1 Technical Specification 3.7.12, Auxiliary Building Gas Treatment System, for One-Time Exception to Permit Opening of the Auxiliary Building Secondary Containment Enclosure as2021-03-0303 March 2021 Expedited Application to Modify Watts Bar Nuclear Plant, Unit 1 Technical Specification 3.7.12, Auxiliary Building Gas Treatment System, for One-Time Exception to Permit Opening of the Auxiliary Building Secondary Containment Enclosure as N CNL-21-016, License Amendment Request to Revise Technical Specifications to Change the Steam Generator Secondary Side Water Level to Accommodate the Replacement Steam Generators (WBN-TS-20-05)2021-03-0202 March 2021 License Amendment Request to Revise Technical Specifications to Change the Steam Generator Secondary Side Water Level to Accommodate the Replacement Steam Generators (WBN-TS-20-05) CNL-21-010, Correction of Application to Implement the Full Spectrum LOCA (Fsloca) Methodology for Loss-of-Coolant Accident (LOCA) Analysis and New LOCA-specific Tritium Producing Burnable Absorber Rod Stress Analysis Methodology (WBN-TS-19-04) (EPID2021-01-26026 January 2021 Correction of Application to Implement the Full Spectrum LOCA (Fsloca) Methodology for Loss-of-Coolant Accident (LOCA) Analysis and New LOCA-specific Tritium Producing Burnable Absorber Rod Stress Analysis Methodology (WBN-TS-19-04) (EPID L CNL-20-104, Expedited Application for Approval to Use an Alternate Method of Determining Probability of Detection for (WBN TS-391-20-024)2020-12-23023 December 2020 Expedited Application for Approval to Use an Alternate Method of Determining Probability of Detection for (WBN TS-391-20-024) CNL-20-093, Supplement to Application to Modify the Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specifications 5.7.2.19 'Containment Leakage Rate Testing Program' (WBN-TS-19-01)2020-12-15015 December 2020 Supplement to Application to Modify the Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specifications 5.7.2.19 'Containment Leakage Rate Testing Program' (WBN-TS-19-01) CNL-20-087, Non-Voluntary Application to Modify Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specifications Surveillance Requirement 3.6.15.4, Shield Building, (WBN-TS-20-017)2020-12-15015 December 2020 Non-Voluntary Application to Modify Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specifications Surveillance Requirement 3.6.15.4, Shield Building, (WBN-TS-20-017) CNL-20-078, Supplement to Application to Revise Watts Bar Nuclear Plant (Wbn), Unit 1 Technical Specifications for Steam Generator Tube Inspection Frequency and to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sa2020-10-13013 October 2020 Supplement to Application to Revise Watts Bar Nuclear Plant (Wbn), Unit 1 Technical Specifications for Steam Generator Tube Inspection Frequency and to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Samp CNL-20-006, Application to Modify the Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specifications 5.7.2.19 Containment Leakage Rate Testing Program (WBN-TS-19-01)2020-10-0202 October 2020 Application to Modify the Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specifications 5.7.2.19 Containment Leakage Rate Testing Program (WBN-TS-19-01) CNL-20-058, Tennessee Valley Authority, Application to Modify the Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specifications for Function 6.e of Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation (WBN-TS-19-27)2020-08-27027 August 2020 Tennessee Valley Authority, Application to Modify the Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specifications for Function 6.e of Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation (WBN-TS-19-27) CNL-20-041, License Amendment Request to Remove Licensee Control (BFN TS-527, SQN-TS-20-08, and WBN-TS-20-016)2020-08-14014 August 2020 License Amendment Request to Remove Licensee Control (BFN TS-527, SQN-TS-20-08, and WBN-TS-20-016) CNL-20-047, Brown Ferry Nuclear Plant, Sequoyah Nuclear Plant & Watts Bar Nuclear Plant - Tennessee Valley Authority License Amendment Request to Revise Radiological Emergency Plan Regarding On-shift Emergency Medical Technician and Onsite Ambulance2020-07-31031 July 2020 Brown Ferry Nuclear Plant, Sequoyah Nuclear Plant & Watts Bar Nuclear Plant - Tennessee Valley Authority License Amendment Request to Revise Radiological Emergency Plan Regarding On-shift Emergency Medical Technician and Onsite Ambulance Re CNL-20-063, Supplement to License Amendment Request for Measurement Uncertainty Recapture Power Uprate (WBN-TS-19-06)2020-07-27027 July 2020 Supplement to License Amendment Request for Measurement Uncertainty Recapture Power Uprate (WBN-TS-19-06) CNL-20-053, Application to Revise Watts Bar Nuclear Plant, Unit 1, Technical Specifications for Steam Generator Tube Inspection Frequency & to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies & Tube Sample Selection, (WBN-392020-07-17017 July 2020 Application to Revise Watts Bar Nuclear Plant, Unit 1, Technical Specifications for Steam Generator Tube Inspection Frequency & to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies & Tube Sample Selection, (WBN-390- CNL-20-040, License Amendment Request to Adopt TSTF-490, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec (WBN-TS-20-07)2020-07-17017 July 2020 License Amendment Request to Adopt TSTF-490, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec (WBN-TS-20-07) CNL-20-016, Application to Modify Watts Bar Nuclear Plant Unit 1 Technical Specifications 3.3.3, Post Accident Monitoring Instrumentation, (WBN-TS-19-23)2020-06-22022 June 2020 Application to Modify Watts Bar Nuclear Plant Unit 1 Technical Specifications 3.3.3, Post Accident Monitoring Instrumentation, (WBN-TS-19-23) CNL-20-012, Application to Modify the Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-18-16)2020-05-19019 May 2020 Application to Modify the Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-18-16) CNL-20-005, License Amendment Request to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position, (WBN-TS-20-02)2020-04-0303 April 2020 License Amendment Request to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position, (WBN-TS-20-02) CNL-19-115, Non-Voluntary License Amendment Request to Modify Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications 3.2.1, Fq(Z), to Implement Methodology from WCAP-17661, Revision 1, Improved RAOC and CAOC Fq Surveillance Technical Specific2020-03-0202 March 2020 Non-Voluntary License Amendment Request to Modify Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications 3.2.1, Fq(Z), to Implement Methodology from WCAP-17661, Revision 1, Improved RAOC and CAOC Fq Surveillance Technical Specificat CNL-19-084, Second Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program...2020-01-17017 January 2020 Second Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program... CNL-19-051, Application to Implement the Full Spectrum LOCA (Fsloca) Methodology for Loss-of-Coolant Accident (LOCA) Analysis and New LOCA-specific Tritium Producing Burnable Absorber Rod Stress Analysis Methodology2020-01-17017 January 2020 Application to Implement the Full Spectrum LOCA (Fsloca) Methodology for Loss-of-Coolant Accident (LOCA) Analysis and New LOCA-specific Tritium Producing Burnable Absorber Rod Stress Analysis Methodology CNL-20-004, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.3.5, LOP DG Start Instrumentation, (WBN-TS-20-01)2020-01-17017 January 2020 Units 1 and 2, License Amendment Request to Revise Technical Specification 3.3.5, LOP DG Start Instrumentation, (WBN-TS-20-01) CNL-19-110, Application to Revise Technical Specifications 3.8.1, AC Sources - Operating (WBN-TS-18-10)2019-12-17017 December 2019 Application to Revise Technical Specifications 3.8.1, AC Sources - Operating (WBN-TS-18-10) CNL-19-077, Application to Modify Watts Bar Nuclear Plant (WBN) Unit 1 and Unit 2 Technical Specifications 3.6.15, Shield Building, (WBN-TS-19-10)2019-12-0606 December 2019 Application to Modify Watts Bar Nuclear Plant (WBN) Unit 1 and Unit 2 Technical Specifications 3.6.15, Shield Building, (WBN-TS-19-10) CNL-19-067, Application to Revise Watts Bar Nuclear Plant (WBN) Unit 2 - Technical Specifications for Steam Generator Tube Repair Sleeve (WBN-TS-391-19-13)2019-09-30030 September 2019 Application to Revise Watts Bar Nuclear Plant (WBN) Unit 2 - Technical Specifications for Steam Generator Tube Repair Sleeve (WBN-TS-391-19-13) CNL-19-060, Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (WBN-TS-18-14)2019-08-29029 August 2019 Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (WBN-TS-18-14) CNL-19-038, License Amendment Request to Make Miscellaneous Administrative Changes (WBN-TS-19-02)2019-06-0707 June 2019 License Amendment Request to Make Miscellaneous Administrative Changes (WBN-TS-19-02) CNL-19-014, Application to Modify Watts Bar Nuclear Plant Unit 2 Technical Specifications 3.7.8 to Extend the Completion Time for an Inoperable Essential Raw Cooling Water Train on a One-Time Basis (WBN-TS-18-07)2019-02-0707 February 2019 Application to Modify Watts Bar Nuclear Plant Unit 2 Technical Specifications 3.7.8 to Extend the Completion Time for an Inoperable Essential Raw Cooling Water Train on a One-Time Basis (WBN-TS-18-07) CNL-18-118, Application to Revise Technical Specifications Regarding DC Electrical Systems TStf-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360 (WBN-TS-18-09)2018-11-29029 November 2018 Application to Revise Technical Specifications Regarding DC Electrical Systems TStf-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360 (WBN-TS-18-09) CNL-18-068, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors (WBN-TS-17-24)2018-11-29029 November 2018 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors (WBN-TS-17-24) CNL-18-119, Application to Revise Watt Bar Nuclear Plant, Units 1 & 2, Technical Specifications 3.8.1, 3.8.7, 3.8.8, and 3.8.9, Regarding Electrical Power Systems (WBN-TS-1808)2018-11-26026 November 2018 Application to Revise Watt Bar Nuclear Plant, Units 1 & 2, Technical Specifications 3.8.1, 3.8.7, 3.8.8, and 3.8.9, Regarding Electrical Power Systems (WBN-TS-1808) CNL-18-130, Revised Application to Modify the Technical Specifications for Unbalanced Voltage Relays2018-11-19019 November 2018 Revised Application to Modify the Technical Specifications for Unbalanced Voltage Relays 2023-09-20 Category:Technical Specification MONTHYEARCNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)2023-12-18018 December 2023
[Table view]Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) WBL-23-052, Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual2023-11-0808 November 2023 Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual CNL-23-059, Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-2023-09-20020 September 2023 Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 CNL-23-028, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)2023-08-0202 August 2023 Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06) CNL-23-020, Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06)2023-06-28028 June 2023 Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06) ML23122A2322023-06-0707 June 2023 Issuance of Amendment Nos. 162 and 69 Regarding Change to Date in Footnotes for Technical Specification 3.7.11, Control Room Emergency Air Temperature Control System (Creatcs) CNL-23-002, Application to Revise Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications to Change the Number of Tritium Producing Burnable Absorber Rods (WBN-TS-21-02) and Proposed Revision to Reactor Vessel Surveillance Capsule Removal Sche2023-03-20020 March 2023 Application to Revise Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications to Change the Number of Tritium Producing Burnable Absorber Rods (WBN-TS-21-02) and Proposed Revision to Reactor Vessel Surveillance Capsule Removal Schedu CNL-22-008, and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002)2022-06-13013 June 2022 and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002) WBL-22-026, Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual2022-05-11011 May 2022 Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual ML20273A0432020-09-29029 September 2020 Plants Unit 1 and 2 - Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual CNL-20-008, Application to Modify Watts Bar Nuclear Plant (WBN) Unit 2 Technical Specification 5.9.6, Reactor Coolant System Pressure and Temperature Limits Report, (WBN-TS-19-28)2020-07-27027 July 2020 Application to Modify Watts Bar Nuclear Plant (WBN) Unit 2 Technical Specification 5.9.6, Reactor Coolant System Pressure and Temperature Limits Report, (WBN-TS-19-28) CNL-20-016, Application to Modify Watts Bar Nuclear Plant Unit 1 Technical Specifications 3.3.3, Post Accident Monitoring Instrumentation, (WBN-TS-19-23)2020-06-22022 June 2020 Application to Modify Watts Bar Nuclear Plant Unit 1 Technical Specifications 3.3.3, Post Accident Monitoring Instrumentation, (WBN-TS-19-23) CNL-20-004, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.3.5, LOP DG Start Instrumentation, (WBN-TS-20-01)2020-01-17017 January 2020 Units 1 and 2, License Amendment Request to Revise Technical Specification 3.3.5, LOP DG Start Instrumentation, (WBN-TS-20-01) CNL-19-051, Application to Implement the Full Spectrum LOCA (Fsloca) Methodology for Loss-of-Coolant Accident (LOCA) Analysis and New LOCA-specific Tritium Producing Burnable Absorber Rod Stress Analysis Methodology2020-01-17017 January 2020 Application to Implement the Full Spectrum LOCA (Fsloca) Methodology for Loss-of-Coolant Accident (LOCA) Analysis and New LOCA-specific Tritium Producing Burnable Absorber Rod Stress Analysis Methodology CNL-19-097, Non-Voluntary License Amendment Request to Correct Unbalanced Voltage Relay Instrumentation Values (TS-19-22)2019-10-23023 October 2019 Non-Voluntary License Amendment Request to Correct Unbalanced Voltage Relay Instrumentation Values (TS-19-22) CNL-19-105, Supplemental Response to Second-Round NRC Request for Additional Information Regarding Application to Revise Technical Specifications Regarding DC Electrical Systems TSTF-500, Revision 2 (WBN-TS-18-09)2019-10-10010 October 2019 Supplemental Response to Second-Round NRC Request for Additional Information Regarding Application to Revise Technical Specifications Regarding DC Electrical Systems TSTF-500, Revision 2 (WBN-TS-18-09) L-19-023, Periodic Submission for Changes Made to the WBN Technical Specification Bases and Technical Requirements Manual2019-03-19019 March 2019 Periodic Submission for Changes Made to the WBN Technical Specification Bases and Technical Requirements Manual CNL-18-130, Revised Application to Modify the Technical Specifications for Unbalanced Voltage Relays2018-11-19019 November 2018 Revised Application to Modify the Technical Specifications for Unbalanced Voltage Relays CNL-18-006, Technical Specification Change - Reactor Coolant Temperature Indicator Inoperable - Exigent Amendment (391-WBN-TS-2018-01)2018-01-10010 January 2018 Technical Specification Change - Reactor Coolant Temperature Indicator Inoperable - Exigent Amendment (391-WBN-TS-2018-01) CNL-17-149, Revised Additional Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Revision 1, Clarification of Rod Position Requirements (WBN-TS-16-025)2017-12-27027 December 2017 Revised Additional Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Revision 1, Clarification of Rod Position Requirements (WBN-TS-16-025) ML17321A0332017-11-16016 November 2017 Additional Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Revision 1, Clarification of Rod Position Requirements (WBN-TS-16-025) ML17306A8022017-11-0202 November 2017 Periodic Submission for Changes Made to the WBN Technical Specification Bases and Technical Requirements Manual NL-17-128, Application to Modify the Watts Bar Nuclear Plant Unit 2 Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Fluid Oil Pressure (391-WBN-TS-17-23)2017-10-11011 October 2017 Application to Modify the Watts Bar Nuclear Plant Unit 2 Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Fluid Oil Pressure (391-WBN-TS-17-23) CNL-17-128, Application to Modify the Watts Bar Nuclear Plant Unit 2 Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Fluid Oil Pressure (391-WBN-TS-17-23)2017-10-11011 October 2017 Application to Modify the Watts Bar Nuclear Plant Unit 2 Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Fluid Oil Pressure (391-WBN-TS-17-23) CNL-17-123, Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Revision 1, Clarification of Rod Position Requirements (WBN-TS-16-025)2017-09-29029 September 2017 Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Revision 1, Clarification of Rod Position Requirements (WBN-TS-16-025) CNL-17-044, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specification 3.7.12, Auxiliary Building Gas Treatment System (Abgts), for Watts Bar Nuclear Plant, Units 1 and 22017-05-0505 May 2017 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specification 3.7.12, Auxiliary Building Gas Treatment System (Abgts), for Watts Bar Nuclear Plant, Units 1 and 2 CNL-17-022, Application to Modify Technical Specification 5.7.2.19 Regarding One-Time Extension of 10 CFR 50, Appendix J Type C Local Leakage Rate Tests (391-WBN-TS-17-05)2017-02-16016 February 2017 Application to Modify Technical Specification 5.7.2.19 Regarding One-Time Extension of 10 CFR 50, Appendix J Type C Local Leakage Rate Tests (391-WBN-TS-17-05) ML16113A0772016-04-22022 April 2016 Periodic Submission for Changes Made to the WBN Technical Specification Bases and Technical Requirements Manual CNL-15-060, Technical Specifications Change No. WBN2-TS-15-16 - Revise Technical Specifications for Use of Steam Generator Alternate Repair Criterion F2015-12-15015 December 2015 Technical Specifications Change No. WBN2-TS-15-16 - Revise Technical Specifications for Use of Steam Generator Alternate Repair Criterion F ML15267A1832015-09-23023 September 2015 Watts Bar, Unit 2 - Submittal of Final Revision 0 of the Technical Specifications & Technical Specification Bases, and Final Revision 0 of the Technical Requirements Manual & Technical Requirements Manual Bases NL-15-181, Watts Bar Unit 1, Revision to Essential Raw Cooling Water and Component Cooling System License Amendment Request Including Proposed Changes to Auxiliary Feedwater Pump Suction Transfer Instrumentation and Reactor Coolant System Loops - Mod2015-09-0303 September 2015 Watts Bar Unit 1, Revision to Essential Raw Cooling Water and Component Cooling System License Amendment Request Including Proposed Changes to Auxiliary Feedwater Pump Suction Transfer Instrumentation and Reactor Coolant System Loops - Mode CNL-15-181, Revision to Essential Raw Cooling Water and Component Cooling System License Amendment Request Including Proposed Changes to Auxiliary Feedwater Pump Suction Transfer Instrumentation and Reactor Coolant System Loops - Mode 42015-09-0303 September 2015 Revision to Essential Raw Cooling Water and Component Cooling System License Amendment Request Including Proposed Changes to Auxiliary Feedwater Pump Suction Transfer Instrumentation and Reactor Coolant System Loops - Mode 4 CNL-15-133, Response to Request for Additional Information Related to Technical Specification 3.8.1 Regarding Diesel Generator Steady State Frequency (WBN-TS-13-08)2015-07-15015 July 2015 Response to Request for Additional Information Related to Technical Specification 3.8.1 Regarding Diesel Generator Steady State Frequency (WBN-TS-13-08) CNL-15-088, Application to Revise Technical Specifications for Component Cooling Water Snd Essential Raw Cooling Water to Support Dual Unit Operation (TS-WBN-15-13)2015-06-17017 June 2015 Application to Revise Technical Specifications for Component Cooling Water Snd Essential Raw Cooling Water to Support Dual Unit Operation (TS-WBN-15-13) CNL-14-218, Application to Modify Technical Specification 3.8.1 Regarding Diesel Generator Steady State Frequency (WBN-TS-13-08)2015-04-0606 April 2015 Application to Modify Technical Specification 3.8.1 Regarding Diesel Generator Steady State Frequency (WBN-TS-13-08) CNL-15-001, Application to Revise Technical Specification 4.2.1, Fuel Assemblies, (WBN-TS-15-03)2015-03-31031 March 2015 Application to Revise Technical Specification 4.2.1, Fuel Assemblies, (WBN-TS-15-03) CNL-14-217, Responses to Requests for Additional Information - Developmental Revision I Technical Specification Sections 3.8 and 5.72015-03-0505 March 2015 Responses to Requests for Additional Information - Developmental Revision I Technical Specification Sections 3.8 and 5.7 CNL-14-180, Technical Specification Sections 3.0 and 3.10.12015-01-22022 January 2015 Technical Specification Sections 3.0 and 3.10.1 ML14307A9812014-11-0303 November 2014 Periodic Submission for Changes Made to Technical Specification Bases and Technical Requirement Manual ML14170A0442014-06-16016 June 2014 Attachment 5 - WBN Unit 2 TS and Tsb Through Developmental Revision I, and Trm and Trmb Through Developmental Revision D ML14170A0452014-06-16016 June 2014 Attachment 1 - TS Developmental Revision I Changes (Mark-Up) for WBN Unit 2 ML14170A0462014-06-16016 June 2014 Attachment 2 - TS Bases Developmental Revision I Changes (Mark-Up) for WBN Unit 2 ML13357A0512013-12-12012 December 2013 Synopsis of Revisions Included in Watts Bar Unit 2 Developmental Revision H of Technical Specifications and Technical Specification Bases. Part 2 of 2 ML13357A0542013-12-12012 December 2013 Technical Specifications Bases ML13353A4782013-12-12012 December 2013 Fuel Handling Accident Dose Analysis Final Safety Analysis Report and Technical Specification Revision ML12333A2422012-11-20020 November 2012 Application to Modify Technical Specification 4.3.1, Criticality, (WBN-TS-12-03) ML12333A2402012-11-19019 November 2012 Unit I, Application to Modify Technical Specification 3.7.10, Control Room Emergency Ventilation System (WBN-TS-12-01) ML12240A2242012-08-23023 August 2012 Update to Technical Requirements Manual (TRM) Bases Section 3.7.2, Developmental Revision B ML12065A0352012-02-28028 February 2012 Watts Bar, Unit 2 - Technical Specifications Table of Contents Through Page B 3.9-32 ML12065A0362012-02-28028 February 2012 Submittal of Developmental Revision G of the Unit 2 Technical Specification (TS) and Technical Specification Bases 2023-09-20 Category:Bases Change MONTHYEARWBL-23-052, Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual2023-11-0808 November 2023
[Table view]Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual CNL-23-002, Application to Revise Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications to Change the Number of Tritium Producing Burnable Absorber Rods (WBN-TS-21-02) and Proposed Revision to Reactor Vessel Surveillance Capsule Removal Sche2023-03-20020 March 2023 Application to Revise Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications to Change the Number of Tritium Producing Burnable Absorber Rods (WBN-TS-21-02) and Proposed Revision to Reactor Vessel Surveillance Capsule Removal Schedu WBL-22-026, Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual2022-05-11011 May 2022 Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual ML20273A0432020-09-29029 September 2020 Plants Unit 1 and 2 - Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual CNL-19-051, Application to Implement the Full Spectrum LOCA (Fsloca) Methodology for Loss-of-Coolant Accident (LOCA) Analysis and New LOCA-specific Tritium Producing Burnable Absorber Rod Stress Analysis Methodology2020-01-17017 January 2020 Application to Implement the Full Spectrum LOCA (Fsloca) Methodology for Loss-of-Coolant Accident (LOCA) Analysis and New LOCA-specific Tritium Producing Burnable Absorber Rod Stress Analysis Methodology L-19-023, Periodic Submission for Changes Made to the WBN Technical Specification Bases and Technical Requirements Manual2019-03-19019 March 2019 Periodic Submission for Changes Made to the WBN Technical Specification Bases and Technical Requirements Manual CNL-18-130, Revised Application to Modify the Technical Specifications for Unbalanced Voltage Relays2018-11-19019 November 2018 Revised Application to Modify the Technical Specifications for Unbalanced Voltage Relays CNL-18-006, Technical Specification Change - Reactor Coolant Temperature Indicator Inoperable - Exigent Amendment (391-WBN-TS-2018-01)2018-01-10010 January 2018 Technical Specification Change - Reactor Coolant Temperature Indicator Inoperable - Exigent Amendment (391-WBN-TS-2018-01) ML17306A8022017-11-0202 November 2017 Periodic Submission for Changes Made to the WBN Technical Specification Bases and Technical Requirements Manual CNL-17-022, Application to Modify Technical Specification 5.7.2.19 Regarding One-Time Extension of 10 CFR 50, Appendix J Type C Local Leakage Rate Tests (391-WBN-TS-17-05)2017-02-16016 February 2017 Application to Modify Technical Specification 5.7.2.19 Regarding One-Time Extension of 10 CFR 50, Appendix J Type C Local Leakage Rate Tests (391-WBN-TS-17-05) ML16113A0772016-04-22022 April 2016 Periodic Submission for Changes Made to the WBN Technical Specification Bases and Technical Requirements Manual CNL-15-060, Technical Specifications Change No. WBN2-TS-15-16 - Revise Technical Specifications for Use of Steam Generator Alternate Repair Criterion F2015-12-15015 December 2015 Technical Specifications Change No. WBN2-TS-15-16 - Revise Technical Specifications for Use of Steam Generator Alternate Repair Criterion F ML15267A1832015-09-23023 September 2015 Watts Bar, Unit 2 - Submittal of Final Revision 0 of the Technical Specifications & Technical Specification Bases, and Final Revision 0 of the Technical Requirements Manual & Technical Requirements Manual Bases CNL-15-181, Revision to Essential Raw Cooling Water and Component Cooling System License Amendment Request Including Proposed Changes to Auxiliary Feedwater Pump Suction Transfer Instrumentation and Reactor Coolant System Loops - Mode 42015-09-0303 September 2015 Revision to Essential Raw Cooling Water and Component Cooling System License Amendment Request Including Proposed Changes to Auxiliary Feedwater Pump Suction Transfer Instrumentation and Reactor Coolant System Loops - Mode 4 NL-15-181, Watts Bar Unit 1, Revision to Essential Raw Cooling Water and Component Cooling System License Amendment Request Including Proposed Changes to Auxiliary Feedwater Pump Suction Transfer Instrumentation and Reactor Coolant System Loops - Mod2015-09-0303 September 2015 Watts Bar Unit 1, Revision to Essential Raw Cooling Water and Component Cooling System License Amendment Request Including Proposed Changes to Auxiliary Feedwater Pump Suction Transfer Instrumentation and Reactor Coolant System Loops - Mode CNL-14-217, Responses to Requests for Additional Information - Developmental Revision I Technical Specification Sections 3.8 and 5.72015-03-0505 March 2015 Responses to Requests for Additional Information - Developmental Revision I Technical Specification Sections 3.8 and 5.7 CNL-14-180, Technical Specification Sections 3.0 and 3.10.12015-01-22022 January 2015 Technical Specification Sections 3.0 and 3.10.1 ML14307A9812014-11-0303 November 2014 Periodic Submission for Changes Made to Technical Specification Bases and Technical Requirement Manual ML13357A0542013-12-12012 December 2013 Technical Specifications Bases ML13353A4782013-12-12012 December 2013 Fuel Handling Accident Dose Analysis Final Safety Analysis Report and Technical Specification Revision ML13357A0512013-12-12012 December 2013 Synopsis of Revisions Included in Watts Bar Unit 2 Developmental Revision H of Technical Specifications and Technical Specification Bases. Part 2 of 2 ML12333A2422012-11-20020 November 2012 Application to Modify Technical Specification 4.3.1, Criticality, (WBN-TS-12-03) ML12333A2402012-11-19019 November 2012 Unit I, Application to Modify Technical Specification 3.7.10, Control Room Emergency Ventilation System (WBN-TS-12-01) ML12240A2242012-08-23023 August 2012 Update to Technical Requirements Manual (TRM) Bases Section 3.7.2, Developmental Revision B ML12065A0352012-02-28028 February 2012 Watts Bar, Unit 2 - Technical Specifications Table of Contents Through Page B 3.9-32 ML12065A0362012-02-28028 February 2012 Submittal of Developmental Revision G of the Unit 2 Technical Specification (TS) and Technical Specification Bases ML11321A3082011-11-14014 November 2011 Changes Made to the Technical Specification Bases ML11228A0482011-08-10010 August 2011 Technical Specifications Bases (Developmental Revision F), Enclosure 2 ML11227A2562011-08-10010 August 2011 Application to Modify Watts Bar Nuclear Plant, Unit 1, Technical Specifications in Support of Watts Bar Nuclear Plant, Unit 2, Testing and Operation (TS-WBN-11-02) ML1104905702011-02-16016 February 2011 Supplemental Information for Review of Developmental Revision a of the Unit 2 Technical Specifications (TS) and Technical Specifications Bases (TS Bases) ML1015400652010-05-28028 May 2010 Technical Specifications Change WBN-TS-10-05 - Control Rod Assemblies ML1011701482010-04-20020 April 2010 Changes Made to the Technical Specification Bases ML1005506002010-02-0202 February 2010 Developmental Revision B - Technical Specifications Bases B 3.9 - Refueling Operations ML1005504822010-02-0202 February 2010 Developmental Revision B - Technical Specifications Bases B 2.0 - Safety Limits ML1005505972010-02-0202 February 2010 Developmental Revision B - Technical Specifications Bases B 3.8 - Electrical Power Systems ML1005505942010-02-0202 February 2010 Developmental Revision B - Technical Specifications Bases B 3.7 - Plant Systems ML1005505902010-02-0202 February 2010 Developmental Revision B - Technical Specifications Bases B 3.6 - Containment Systems ML1005505052010-02-0202 February 2010 Developmental Revision B - Technical Specifications Bases B 3.4 - Reactor Coolant System ML1005504972010-02-0202 February 2010 Developmental Revision B - Technical Specifications Bases B 3.2 - Power Distribution Limits ML1005504882010-02-0202 February 2010 Developmental Revision B - Technical Specifications Bases B 3.0 - Limiting Condition for Operation (LCO) Applicability ML1005504782010-02-0202 February 2010 Developmental Revision B - Technical Specifications Bases, Table of Contents ML1005505012010-02-0202 February 2010 Developmental Revision B - Technical Specifications Bases B 3.3 - Instrumentation ML1005505372010-02-0202 February 2010 Developmental Revision B - Technical Specifications Bases B 3.5 - Emergency Core Cooling Systems ML1005504942010-02-0202 February 2010 Developmental Revision B - Technical Specifications Bases B 3.1 - Reactivity Control Systems ML0919401912009-07-0909 July 2009 Watts, Unit 1 - Technical Specifications Change - Core Power Distribution Monitoring System. ML0916100682009-06-0505 June 2009 Change to TS 3.6.3, Containment Isolation Valves, Regarding Position Verification Requirements (TSTF-269-A, TSTF-45-A, and TSTF-440-A) ML0826610312008-09-22022 September 2008 Changes Made to the WBN Technical Specification Bases and Technical Requirements Manual ML0826703612008-09-18018 September 2008 Unit 1 - License Amendment (TS-08-09) to Revise the Technical Specifications (Ts), Bases and Updated Final Safety Analysis Report (UFSAR) for the Unit 2 Vital Inverters ML0826705432008-09-18018 September 2008 Technical Specification (TS) Change No. 08-07, Auxiliary Feedwater Auto-Start Upon Trip of the Turbine Driven Main Feedwater Pumps ML0821800932008-08-0101 August 2008 Watt'S Bar, Unit 1, Technical Specifications Change - Revision of Boron Requirements for Cold Leg Accumulators and Refueling Water Storage Tank. 2023-03-20 |
Text
J. W. Shea Digitally signed by J. W. Shea DN: cn=J. W. Shea, o=Tennessee Valley
Authority, ou=Nuclear Licensing, email=jwshea@tva.gov, c=US
Date: 2018.01.10 16:32:25 -05'00'