E-mail from J. Mateychick, Riv to A. Blough, Ri, Et Al., Wolf Creek Potential Failure to Meet Required Response TimeML060690272 |
Person / Time |
---|
Site: |
Wolf Creek, Callaway |
---|
Issue date: |
11/21/2005 |
---|
From: |
Mateychick J NRC Region 4 |
---|
To: |
Acosta C E, Allsopp D K, Andersen J, Architzel R E, Garry Armstrong, Arndt S A, Benner E J, Bennett B, Benvenuto P L, Blough A R, Bobiak J, Boland A T, Bongarra J, Bonnett F P, Brady B M, Burrows F H, Christopher Cahill, Jason Cai, Caldwell R K, Calvo J A, Caniano R J, Cassidy J G, Casto C A, Chelliah E, Christensen H O, Chyu D, Concepcion-Robles M, Howard Crouch, Crowe E L, D'Antonio J M, Alan Dahbur, Dahbur A K, Desaulniers D R, Karl Diederich, Downs J R, James Drake, Drake J F, Frank Ehrhardt, Ehrhardt F J, Fillion P J, Foster J, Frumkin D M, Gage P C, Galloway M, Gallucci R H, Garg H C, Russell Gibbs, Goodman C, Gordon D, Gray K, Guha D, Mark Haire, Haire M S, Hausman G M, John Hickman, Hills D E, Hodge A, Hodge C V, Holian B E, David Holman, Holman D A, Huyck D G, Hyslop J S, Ibarra J, Jackson T W, Ronaldo Jenkins, Dante Johnson, Jones W B, Julian C A, Ian Jung, Kang P J, Mark King, Klein A, Klett A L, Kozak T J, Langstaff R A, Lara J F, Larsen J R, Laura R A, Chang Li, Lois E, Lorson R K, Madeda T J, Marinos E C, John Marshall, Martin K, McCree V M, McKirgan J B, Merriweather N, Moore C R, Morris G, Nease R, Ninh S O, Ninh S Q, Pascarelli R J, Peck M S, Pedersen R L, Pederson C D, Pelton R M, Persensky J J, Phillips M P, Presby P A, Pruett T W, Radinski R, Sheila Ray, Rebstock P J, Rini B A, Rogers W G, Roque-Cruz C P, Ross-Lee M J, Markhenry Salley, Selim Sancaktar, Schoppy J G, Sheldon S N, Simpkins D S, Beverly Smith, Smith C F, Galen Smith, James Smith, Otis Smith, Staples N L, Sykes M D, Szabo A J, Omid Tabatabai, Tardiff A N, Ross Telson, Thomas G S, Usova G M, Vora J P, Wallo J H, Walton R K, Waterman M E, Blake Welling, Wescott R G, West S K, Willoughby L M, Adam Wilson, Wiseman G R, Young K A Office of Nuclear Reactor Regulation, NRC Region 1 |
---|
References |
---|
FOIA/PA-2006-0095 |
Download: ML060690272 (7) |
|
|
---|
Category:E-Mail
MONTHYEARML24263A0832024-09-19019 September 2024 NRR E-mail Capture - Acceptance Review Wolf Creek Revision to Technical Specification to Adopt TSTF-569-A, Revision 2, Revision of Response Time Testing Definitions ML24250A0252024-09-0606 September 2024 NRR E-mail Capture - Acceptance Review Wolf Creek Revision to Technical Specification 3.2.1, Heat Flux Hot Channel Factor (Fq(Z)) (Fq Methodology) ML24193A0362024-07-10010 July 2024 NRR E-mail Capture - LIC-109 Acceptance Email - Callaway Plant, Unit 1 - Application to Revise Technical Specifications to Adopt TSTF-569, Rev. 2, Revise Response Time Testing Definition - EPID L-2024-LLA-0076 ML23362A0572023-12-28028 December 2023 NRR E-mail Capture - Callaway Plant, Unit 1 - SUNSI Review of the Final Safety Analysis Report (FSAR) Revision OL-26 ML23360A1562023-12-26026 December 2023 NRR E-mail Capture - Acceptance Review Wolf Creek Request to Revise the Ventilation Filter Testing Program in Technical Specifications ML23338A0392023-12-0101 December 2023 NRR E-mail Capture - LIC-109 Acceptance Review - Unacceptable with Opportunity to Supplement - Callaway - RR from Requirements of ASME BPV Code, Section Xl, Subsect IWL-Exam & Test-Unbonded Post Tensioning System - EPID L-2023-LLR-0061 ML23208A1052023-07-27027 July 2023 NRR E-mail Capture - Callaway Plant, Unit No. 1 - Regulatory Audit Questions - LAR to Clarify Support System Requirements for the Residual Heat Removal & Control Room Air Conditioning Systems ML23200A2982023-07-19019 July 2023 NRR E-mail Capture - Callaway Plant, Unit 1 - Final Request for Additional Information (RAI) - Request for Approval of Oqam, Revision 36a - EPID L-2023-LLQ-0000 ML23166A0622023-06-15015 June 2023 NRR E-mail Capture - Acceptance Review - Wolf Creek Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded post-tensioning System Components ML23121A0112023-04-28028 April 2023 NRR E-mail Capture - Callaway Plant, Unit 1 - LIC-109 Acceptance of License Amendment Request to Revise TS to Adopt TSTF-501-A Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control - EPID L-2023-LLA-0046 ML23114A2302023-04-24024 April 2023 NRR E-mail Capture - Regulatory Audit Question - Callaway LAR and Exemption for Fuel Transition to Framatome Gaia Fuel - EPIDs - L-2022-LLA-0150 and L-2022-LLE-0030 ML23107A1812023-04-17017 April 2023 NRR E-mail Capture - Regulatory Audit Questions - Callaway LAR and Exemption for Fuel Transition to Framatome Gaia Fuel - EPIDs - L-2022-LLA-0150 and L-2022-LLE-0030 ML23096A0072023-04-0505 April 2023 NRR E-mail Capture - Final Request for Additional Information - Callaway Plant, Unit 1 - License Amendment Request to Revise TS 5.5.16 for Permanent Extension of Integrated Leak Rate Testing - EPID L-2022-LLA-0165 ML23090A1042023-03-31031 March 2023 NRR E-mail Capture - Acceptance Review Wolf Creek Request for Removal of the Power Range Neutron Flux Rate - High Negative Rate Trip Function from Technical Specifications ML23090A0072023-03-31031 March 2023 NRR E-mail Capture - Acceptance Review Wolf Creek Request for Relief for Follow-Up Examination Requirements for Reactor Pressure Vessel Head Penetration Nozzles with Peened Surface ML23080A0652023-03-21021 March 2023 NRR E-mail Capture - Wolf Creek Generating Station Evacuation Time Estimate Analysis Review ML23073A0262023-03-13013 March 2023 NRR E-mail Capture - Final - Request for Additional Information - Callaway Plant, Unit 1 - SG Inspection Report Review - EPID L-2022-LRO-0143 ML23037A7092023-02-0606 February 2023 April 2023 Emergency Preparedness Exercise Inspection - Request for Information ML23037A0022023-02-0303 February 2023 NRR E-mail Capture - Callaway - LAR to Adopt AST - EPID L-2021-LLA-0177 - Revised Schedule for Completion of the Project ML23026A0222023-01-25025 January 2023 NRR E-mail Capture - Acceptance Review Wolf Creek Request to Revise Technical Specifications to Adopt Technical Specification Task Force (TSTF)-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements ML23026A0212023-01-24024 January 2023 NRR E-mail Capture - Final - Request for Additional Information - Callaway Plant, Unit 1 - LAR for Proposed Changes to TS for SFP - ML23010A2902023-01-10010 January 2023 NRR E-mail Capture - LIC-109 Acceptance Review - Callaway Plant, Unit 1 - License Amendment Request to Clarify Support System Requirements for the RHR & Crac Systems - ML23009A4082023-01-0909 January 2023 NRR E-mail Capture - Acceptance Review Wolf Creek Request to Revise TS to Adopt Technical Specification Task Force (TSTF)-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ML22361A0052022-12-27027 December 2022 NRR E-mail Capture - Request for Additional Information Wolf Creek Request for Deviation from Fire Protection Program Requirements ML22346A0132022-12-0909 December 2022 NRR E-mail Capture - Callaway Plant, Unit 1 - LIC-109 Acceptance of LAR to Revise TS 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies - EPID L-2022-LLA-0165 ML22322A0062022-11-17017 November 2022 NRR E-mail Capture - Final - LIC-109 Acceptance Review (Unacceptable for Review with Opportunity to Supplement) Callaway - LAR for Proposed Changes to TS and Exemption Request Use of Framatome Gaia Fuel - L-2022-LLA-0150 & L-2022-LLE-0030 ML22321A2662022-11-16016 November 2022 January 2023 Emergency Preparedness Program Inspection - Request for Information ML22307A1372022-11-0202 November 2022 August 2022 Emergency Preparedness Exercise Inspection Unresolved Item - Request for Information ML22287A0952022-10-14014 October 2022 NRR E-mail Capture - Final - Request for Additional Information - Callaway Plant, Unit 1 - License Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications - EPID L-2021-LLA-0177 ML22280A1322022-10-0707 October 2022 NRR E-mail Capture - Final - LIC-109 Acceptance Review (Unacceptable for Review with Opportunity to Supplement) - Callaway - License Amendment Request for Proposed Changes to Tech Spec Changes for Spent Fuel Pool Storage - EPID L-2022-LLA-0 ML22278A0122022-10-0404 October 2022 NRR E-mail Capture - Draft - LIC-109 Acceptance Review (Unacceptable for Review with Opportunity to Supplement) - Callaway License Amendment Request for Proposed Changes to Tech Spec Changes for Spent Fuel Pool Storage - EPID L-2022-LLA-013 ML22269A4312022-09-26026 September 2022 November 2022 Emergency Preparedness Program Inspection - Request for Information NRC-2100-2022, EN 55999 Valcor Coil Shell Assemblies Final Notification (004)2022-09-12012 September 2022 EN 55999 Valcor Coil Shell Assemblies Final Notification (004) ML22251A1312022-09-0808 September 2022 NRR E-mail Capture - Acceptance Review - Wolf Creek Request for Deviation from Fire Protection Program Requirements to Allow Use of Portable Lighting ML22251A0122022-09-0707 September 2022 NRR E-mail Capture - Callaway Plant, Unit 1 - LIC-109 Acceptance of License Amendment Request for Application to Revise TS to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections - EPID L-2022-LLA-0110 ML22215A2742022-08-0202 August 2022 Inservice Inspection Request for Information ML22208A1322022-07-27027 July 2022 NRR E-mail Capture - Wolf Creek Table of Contents LAR NRC 2110-2022, EN 55999 - Valcor Engineering Corporation (009)2022-07-18018 July 2022 EN 55999 - Valcor Engineering Corporation (009) ML22216A0072022-07-0808 July 2022 NRR E-mail Capture - Callaway Plant, Unit No. 1 - Draft Acceptance Review (Unacceptable for Review with Opportunity to Supplement) for Framatome Fuel Transition LAR and Exemption - EPIDs L-2022-LLA-0083 and L-2022-LLE-0019) ML22167A0252022-06-15015 June 2022 NRR E-mail Capture - Final - Request for Additional Information - Callaway Plant, Unit 1 - LAR for Proposed Revision to Radiological Emergency Response Plan Regarding Response & Notification Goals - EPID L-2022-LLA-0024 ML22166A3222022-06-14014 June 2022 August 2022 Emergency Preparedness Exercise Inspection - Request for Information ML22157A0102022-06-0303 June 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood Ultimate Heat Sink Temporary Temperature Increase to 102.8 Degrees Fahrenheit ML22154A0122022-06-0202 June 2022 NRR E-mail Capture - Final - Request for Additional Information - Callaway Plant, Unit 1 - License Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications - EPID L-2021-LLA-0177 ML22151A0512022-05-27027 May 2022 NRR E-mail Capture - Final - Request for Additional Information - Columbia Generating Station - LAR to Change TS 3.4.11 - Reactor Coolant System Pressure and Temperature Limits - EPID L-2021-LLA-0191 ML22137A0292022-05-16016 May 2022 NRR E-mail Capture - Draft - Request for Additional Information - Callaway Plant, Unit 1 - License Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications - EPID L-2021-LLA-0177 ML22131A0522022-05-11011 May 2022 NRR E-mail Capture - Draft Supplemental Information Needed for Acceptance - Wolf Creek Inservice Inspection Relief Request for Reactor Pressure Vessel Head Penetration Nozzles with Peened Surface ML22096A0232022-04-0505 April 2022 NRR E-mail Capture - Callaway Plant - Final RAIs - License Amendment and Regulatory Exemptions for a Risk-Informed Approach to Address Generic Safety Issue - 191 and Respond to GL 2004-02 (EPIDs L-2021-LLA-0059 and L-2021-LLE-0021) ML22089A0222022-03-29029 March 2022 NRR E-mail Capture - Callaway Plant, Unit 1 - LAR to Adopt TSTF-505 and TSTF-439 - Follow Up Clarifications for the Audit Questions - EPID L-2021-LLA-0197 ML22087A4022022-03-28028 March 2022 NRR E-mail Capture - Callaway - Draft RAIs - License Amendment and Regulatory Exemptions for a Risk-Informed Approach to Address Generic Safety Issue - 191 and Respond to Generic Letter 2004-02 (EPIDs L-2021-LLA-0059 and L-2021-LLE-0021) ML22070A1362022-03-10010 March 2022 NRR E-mail Capture - Callaway Plant, Unit 1 - LIC-109 Acceptance of License Amendment Request for Proposed Revision to Radiological Emergency Response Plan Regarding Response and Notification Goals - EPID L-2022-LLA-0024 2024-09-06
[Table view] |
Text
Alex Klen -Re: Wolf Creek potential failure to meet required response times for S/D outside control room Page 1 From: John Mateychick To: as A. Randolph Blough; Adam Wilson; Al Tardiff; Alan Dahbur; Alex Klein; Anne Boland;Audrey Klett; Autumn Szabo; Bennett Brady; Blake Welling; Brett Rini; Brian Holian; Brian Smith; C.Vernon Hodge; Carl Moore; Carla Roque-Cruz; Caroline Acosta; Caswell Smith; Caudle Julian; Chang Li; Charles Casto; Christopher Cahill; Clare Goodman; Cynthia Pederson; Daniel Frumkin; David Allsopp; David Desaulniers; David Hills; David Holman; Debbie Guha; Dennis Gordon; Don Johnson;Doris Chyu; Douglas Huyck; Douglas Simpkins; Eddy Crowe; Erasmia Lois; Eric Benner; Erulappa Chelliah; Evangelos Marinos; F. Paul Bonnett; Frank Ehrhardt; Frederick Burrows; Garry Armstrong; George Hausman; George Morris; George Thomas; George Usova; Gerald Wiseman; Gregory Smith;Harold Christensen; Howard Crouch; Hukam Garg; Ian Jung; J. S. Hyslop; Jack Foster; James Andersen; James Bongarra; James Downs; Jarnes Drake; James Larsen; James Smith; Jane Marshall; Jay Lennartz; Jennifer Bobiak; Jitenda Vora; John Cassidy; John Hickman; John McKirgan;Jon Wallo; Jose Calvo; Jose Ibarra; Joseph D'Antonio; Joseph Schoppy; Julio Lara; Julius Persensky; June Cai; Kamishan Martin; Karl Diederich; Kaihy Gray; Keith Young; Leonard M. Willoughby; Mark Haire; Mark King; Mark Salley; Marvin Sykes; Mary Jane Ross-Lee; Melanie Galloway; Michael S.Peck; Michael Waterman; Milton Concepcion-Robles; Monte Phillips; Necota Staples; Norman Merriweather; Omid Tabatabai; Otis Smith; Pablo L. Benvenuto; Paul Fillion; Paul Gage; Paul Rebstock; Peter Kang; Peter Presby; Ralph Architzel; Ray Gallucci; Raymond Lorson; Raymond Walton; Rebecca Nease; Rex Wescott; Richard Laura; Richard Pelton; Robert Caldwell; Robert Pascarelli; Robert Radlinski; Roger Pedersen; Ronald Langstaff; Ronaldo Jenkins; Ross Telson; Roy Caniano; Russell Gibbs; Selim Sancaktar; Sheila Ray; Son Ninh; Steven Arndt; Steven West; Stuart Sheldon(...)
Date: 11/21/05 9:59AM
Subject:
Re: Wolf Creek potential failure to meet required response times for S/D outside control room Note that this issue was actually identified by NRC Inspectors during the first onsite week of Wolf Creek's Triennial Fire Protection Inspection.
CC: John Kauffman; Kathleen O'Donohue; Les Cupidon; Michael Case; Patrick Hiland I cAtemp\GW)00001.TMP Page I c:\temp\GW}OOOO1 .TMP Page 1 I Mail Envelope Properties (4381EOB4.043:
20: 59365)
Subject:
Re: Wolf Creek potential failure to meet required response times for S/D outside control room Creation Date: 11/21/05 9:59AM From: John Mateychick Created By: JMM3@nrc.gov Recipients nrc.gov ARLPO.ARLDO DAH2 (David Holman)ELC 1 (Eddy Crowe)HXC4 (Howard Crouch)JFD (James Drake)jrll (James Larsen)LMWl (Leonard M. Willoughby)
MSH2 (Mark Haire)MSP (Michael S. Peck)PCG (Paul Gage)PLB2 (Pablo L. Benvenuto)
RJC1 (Roy Caniano)RLNI (Rebecca Nease)TWJ (Terry Jackson)TWP (Troy Pruett)WBJ (William B. Jones)nrc.gov ATLPO.ATLDO CACI (Charles Casto)CAJ (Caudle Julian)CFS1 (Caswell Smith)DSS (Douglas Simpkins)FJE (Frank Ehrhardt)GRW (Gerald Wiseman)HOC (Harold Christensen)
JHW2 (Jon Wallo)NLS2 (Necota Staples)NXM (Norman Merriweather)
OXS1 (Otis Smith)PJF (Paul Fillion)SON (Son Ninh)VMM (Victor McCree)WGRI (Walt Rogers)
I c:\temp\GW}00001.TMP Page 2 lc:\temp\GW}OQOO1 .TMP Page 2 I nrc.gov chpo.CHDO AKD (Alan Dahbur)ALKI (Audrey Klett)ATB (Anne Boland)CDPI (Cynthia Pederson)CEA4 (Caroline Acosta)CPRI (Carla Roque-Cruz)
CRM4 (Carl Moore)DEH (David Hills)DXC (Doris Chyu)GMHI (George Hausman)JAL3 (Jay Lennartz)JFL (Julio Lara)jgc3 (John Cassidy)KSW (Steven West)MPP (Monte Phillips)RAL4 (Ronald Langstaff)
RKW (Raymond Walton)SNS2 (Stuart Sheldon)TJK4 (Thomas Kozak)TJM4 (Terry Madeda)ZXF nrc.gov OWGWPOO1 .HQGWDOOI DRD GLA JAC7 JRD2 JXB JXC1I REA nrc.gov OWGWPOO2.HQGWDOO 1 ARKI CPG DAJ3 HCG MSKI PLH CC RAGI RVJ c:\temp\GW)00001.TMP TAHM WEK nrc.gov TWGWPOO 1 .HQGWDO0 1 BAR3 ECM GWM2 MCR1 PJR1 RALI RLP1 SXR4 TXN2 nrc.gov TWGWPOO2.HQGWDOO I AAW GMU MXS3 RDT wxs1 nrc.gov kpl-po.KP.DO ARB BDW BEH CGC GCS JAB JGS JMD KAY KXD2 MDS I PAP3 RKL TLOI TPS 1 nrc.gov owflpo.OWFNDO MJR2 Page 3 I cAtemp\GW}OOOQ1 .TMP Page 4 I c.:\temp\GWIOOOO1.TMP Page 4 nrc.gov owf2_po.OWFNDO CYLI DXF1 GXT KOM2 RFRI RHG RMP1 nrc.gov owf4_po.OWFNDO AXTI CVH DKA DXG DXG4 FPB JWA jwf KAG MJC CC RJP3 TLT TXK nrc.gov ttclpo.TTQCDO KFO CC nrc.gov twf2_po.TWFNDO BMB1 DGH2 EJB1 IxJ JBM4 JEMI JVK CC LRC CC RKCI WSR nrc.gov twf4_po.TWFNDO c:\temp\GW}00001.TMP BWS1 FHB JAS4 JBH MAM OTY RGW Page 5 1 nrc.gov twf5_po.'AXS7 ESC EXL1 JGI JJP2 JPV JSH2 MEWI PJK SAA SXS9 TWFN_DO Post Office ARLPO.ARLDO ATLPO.ATLDO ch_po.CHDO OWGWPOOI.HQGWDOOI OWGWPO02.HQGWDO01 TWGWPO01.HQGWDOO1 TWGWPOO2.HQGWDOOI kpl-po.KPDO owfl-po.OWFNDO owf2_po.OWFNDO owf4_po.OWFNDO ttclpo.TTCDO twf2_po.TWFNDO twf4_po.TWFNDO twf5_po.TWFNDO Route nrc.gov nrc.gov nrc.gov nrc.gov nrc.gov nrc.gov nrc.gov nrc.gov nrc.gov nrc.gov nrc.gov nrc.gov nrc.gov nrc.gov nrc.gov Files MESSAGE Options Expiration Date: Priority: Size 488 Date & Time 11/21/05 09:59AM None Standard Lc:\temp\GW}00001.TMP Page 6]Reply Requested:
No Return Notification:
None Concealed
Subject:
No Security:
Standard