MONTHYEARML23331A8922023-11-22022 November 2023 Supplement - Braidwood Security Rule Exemption Request ISFSI Docket No. Reference ML23321A2012023-11-17017 November 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds (L-2023-LLR-0062) ML23311A1682023-11-0707 November 2023 NRR E-mail Capture - Constellation - Fleet Request - Acceptance of Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections (L-2023-LLR-0053 and L-2023-LLR-005 ML23311A1692023-11-0707 November 2023 NRR E-mail Capture - Constellation - Fleet Request - Acceptance of Proposed Alternative for Examinations of Exam Categories B-B, B-D, and C-A SG Pressure Retaining Welds and Full Penetration Welded Nozzles (L-2023-LLR-0055 and L-2023-LLR-00 ML23304A0222023-10-30030 October 2023 NRR E-mail Capture - Final RCI - Constellation Energy Generation, LLC - Braidwood 1 & 2 - Exemption from Security Rule (L-2023-LLE-0030) ML23187A0092023-07-0606 July 2023 NRR E-mail Capture - NRC Acceptance Review of Byron and Braidwood Request to Adopt TSTF-370 ML23103A4692023-04-12012 April 2023 NRR E-mail Capture - NRC Acceptance Review of Braidwood Request for Amendment to Revise TS 3.7.9 ML23069A0332023-03-0606 March 2023 Email to K. Lueshen Byron and Braidwood Commitment 10 - Request for Additional Information Set 1 ML22354A2622022-12-20020 December 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI NRC-2100-2022, EN 55999 Valcor Coil Shell Assemblies Final Notification (004)2022-09-12012 September 2022 EN 55999 Valcor Coil Shell Assemblies Final Notification (004) ML22255A0132022-09-0909 September 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood, Byron, Calvert Cliffs, Ginna - License Amendment Request to Adopt TSTF-577 ML22200A0782022-07-19019 July 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request to Use Honeywell Mururoa V4F1 R Supplied Air Suits NRC 2110-2022, EN 55999 - Valcor Engineering Corporation (009)2022-07-18018 July 2022 EN 55999 - Valcor Engineering Corporation (009) ML22189A0602022-07-0707 July 2022 NRR E-mail Capture - Draft RAI for Byron/Braidwood TSTF-501 ML22136A2722022-05-16016 May 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood and Byron Adoption of TSTF-501 ML22129A0132022-05-0606 May 2022 NRR E-mail Capture - Draft RAIs for Requests for Alternatives I4R-17, I4R-23, ISI-05-018, I6R-10 ML22271A0772022-05-0606 May 2022 NRR E-mail Capture - Final RAIs 9.1.2021 Constellation Relief Request ML22116A0242022-04-25025 April 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood, Byron, and Ginna Request to Adopt TSTF-246 ML22105A0722022-04-15015 April 2022 NRR E-mail Capture - Braidwood/Byron Verbal Authorization for Proposed Alternative I4R-15/I4R-21 ML22091A0852022-04-0101 April 2022 NRR E-mail Capture - Braidwood and Byron - Final RAI Regarding Proposed Alternative for Various Pressurizer Welds (EPID L-2021-LLR-0035 and 0036) ML22088A1562022-03-0202 March 2022 NRR E-mail Capture - Byron, Braidwood, Calvert Cliffs, and Ginna - Non-acceptance of Application to Revise Technical Specifications 5.6.5.b, the Core Operating Limits Report (COLR) ML22091A0842022-02-24024 February 2022 NRR E-mail Capture - Braidwood and Byron - Withdrawal of Draft RAI Regarding Proposed Alternative for Various Pressurizer Welds (EPID L-2021-LLR-0035 and 0036) ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML23089A0172022-01-0505 January 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood - Proposed Alternative for Examinations of Categories B-B, B-D, and C-A SG Welds and Nozzles ML21301A0672021-10-28028 October 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-541 ML21272A1492021-09-29029 September 2021 NRR E-mail Capture - NRC Acceptance Review of Braidwood and Byron - Proposed Alternative for Examinations of Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21252A0172021-09-0303 September 2021 NRR E-mail Capture - NRC Acceptance Review - Braidwood - License Amendment to Revise Technical Specification 3.7.9, Ultimate Heat Sink ML21252A0042021-08-26026 August 2021 NRR E-mail Capture - NRC Acceptance Review - Braidwood/Byron/Clinton - Adoption of TSTF-273, Safety Function Determination Program Clarifications ML21215A3502021-08-0303 August 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-554 ML21189A1602021-07-0808 July 2021 NRR E-mail Capture - Request for Additional Information - Braidwood, Byron, and Ginna - Amendment to Address the Issues in Westinghouse NSALs ML21154A0162021-06-0202 June 2021 NRR E-mail Capture - NRC Acceptance Review of Braidwood - Proposed Alternative for Exam of Pzr Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Shell Welds ML21154A0112021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0142021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0132021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21123A2442021-05-0303 May 2021 NRR E-mail Capture - NRC Acceptance Review of Braidwood/Byron/Ginna - Application to Address the Issues Identified in Westinghouse Documents NSAL-09-5 and NSAL-15-1 (L-2021-LLA-0066) ML21117A0442021-04-26026 April 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21084A2532021-03-24024 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Transfer Application ML21062A0652021-03-0101 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21049A2572021-02-18018 February 2021 Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) ML21033A8552021-02-0202 February 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Alternative Request to Expand the Use ASME Codes Cases N-878 and N-880 ML21029A3302021-01-29029 January 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Fleet Alternative Request to Use ASME Code Case N-885 ML21004A1452020-12-30030 December 2020 NRR E-mail Capture - Request for Additional Information Regarding Relief Requests Braidwood I4R-11 and Byron I4R-18 ML20350B5582020-12-14014 December 2020 NRR E-mail Capture - Exelon Generation Company, LLC -Alternative Request for Documentation of Replacement of Pressure Retaining Bolting ML20346A1012020-12-11011 December 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Request for an Alternative to Use ASME Code Case N-893 (EPIDs L-2020-LLR-0147 and L-2020-LLR-0148) ML20289A1142020-10-0909 October 2020 NRR E-mail Capture - Preliminary RAIs for LAR Regarding Non-conservative TS EDG Frequency Tolerance ML20266G3032020-09-22022 September 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Request to Use Paragraph IWA-5120 of the 2017 Edition of the ASME B&PV Code, Section XI ML20261H4122020-09-11011 September 2020 NRR E-mail Capture - (External_Sender) License Amendment to Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink ML21145A0572020-08-18018 August 2020 NRR E-mail Capture - NRC Acceptance Review for Braidwood Relief Request I4R-11 2023-07-06
[Table view] |
Text
Anne Boland -Fwd: Questions from Bwd semi-public mtg on tritium 12/12e From: Wayne Slawinski
/ Jig To: Anne Boland Date: Tue, Dec 13, 2005 5:07 PM
Subject:
Fwd: Questions from Bwd semi-public mtg on tritium 12/12 Attachei are the Q & A's from the Braidwood meeting last evening as transcribed by Nick Shah. This was the one document you did not have.
Anne Boland -Questions from Bwd semi~-public rntg on tritiumn 12112 j ]ge~From: To: Date: Subjec-t: Nirodh Shah / 11 Jan Strasma Tue,'Dec 13, 2005 4:02 AM Questions from Bwd semi-public mtg on tritium 12/12 Jan, here are the questions asked by the local residents (and the answers provided by the licensee) that I wrote down during the meeting. Please take a look and let me know if you remember a different answer or if there were some questions that I missed.thanks ...CC: Gregory Roach; John House; Richard Skokowski; Steven Orth
!Anne Boland -Questions from 12.wpdf Page 1 11Boland -Questions from 12.wpd Page 11 Questions from 12/12 Tritium Meeting at Braidwood Unless stated, all answers are those provided by the licensee (John Moser).1. When did the licensee dig the sampling wells ?The wells were dug in Nov and Dec 2005.2. Is there any tritium in the blowdown pipe today ?There is no tritium in the pipe since liquid radwaste releases were suspended.
The pipe contains normal blowdown from the lake.3. What is being done with the liquid radwaste since the licensee has suspended radwaste releases ?It is being stored on-site in tanks.4. How much liquid radwaste is currently being stored on-site ?About 80,000 gal.5. How much liquid radwaste is normally discharged from the site ?About 250,000 gal/year.
The radwaste is held in tanks and periodically discharged into the blowdown line.6. When did you start suspending liquid radwaste discharges
?About 2 weeks ago.7. Since you stopped discharging have you seen an Increase or decrease in the tritium levels ?Have not collected many duplicate samples, as still doing characterization.
However, samples to date show no significant variation.
- 8. Since you can't store forever, does this mean you have to fix this problem this year ?We have obtained additional tanks and we are reviewing our options for future discharges.
- 9. What is the blowdown line made of ?Stainless Steel.10. Do you plan to do a pressure test on the blowdown line ? How long will your evaluation take ?
- Anne Boland -Questions from 12.wpd Page 2 1I Ann.Bo-and_
ue.sti _n- f o m _ 1 w P 2_ __ __ --I irk A pressure test was one of several options considered, but we decided that acoustical monitoring of the piping was the best choice. We expect this monitoring to take 3-4 days and begin next Monday. If you wish, we will share the results of the monitoring with you.11. If a vacuum valve fails where does the water go ? Into the water table ?The water will collect in the valve pit and then overflow into the environment.
- 12. When did you start inspecting the blowdown line and valves ? Did you start after the 2000 event ?We had performed walkdowns of the blowdown line and valves prior to the 2000 event, but we increased our inspection frequency after the event.13. What is the normal concentration of tritium in the blowdown line ?About 90,000 pCVL in 2000, but since then about 30,000 pCiL.14. This concentration Is higher than the EPA limit. Is this ok ?Yes. The release is diluted by the river. Before each release we monitor both river flow and level to assure adequate dilution.15. How often did you test the liquid radwaste for tritium ?Before each discharge and on a 30 day average.16. What do you mean by "background levels ?" Background levels are those levels of tritium that can be attributed to natural sources or as fallout from atomic bomb testing.17. What is the EPA limit based on (dose to adult or child)? I have an 18 month old baby and expensive show horses--do I need to be concerned
?The EPA limit is based on an adult. If you were to imbibe water having a tritium concentration equal to this limit, you would get a dose of 4 mrem/yr. The highest well sample measured so far, would equate to a dose of 0.3 mrem/yr.18. Which well had the highest tritium sample ?The highest well water sample result was 1524 pCVL. We cannot divulge whose well had that sample due to personal privacy concerns.19. What should I do with my horses if you see >20,000 pCi/L in the residential well samples?We do not expect to see these tritium levels in the samples.
0 I: Anne Boland -Questions from 12.WDd Pacie 31'An Boland+/-W &~ 1I -Qeston fro 12.wodPaae 3 ._ ---. ._ -.----.--.-, -. .1 20. What testing frequency do you plan for the future ?That has yet to be determined.
- 21. Do you plan to do sampling in the vicinity of the blowdown piping by the river ?Yes.22. What are the EPA standards/requirements for future testing ?Don't know. We will get back to you.23. Why are you concerned if the well samples are below the EPA drinking water limits ?Even though the levels are below the EPA limits, because the tritium migrated offsite we are concerned.
- 24. If the spill occurred in 1998, why are you concerned so many years after the fact ?What did you do for the 1998 event ?This question will be reviewed during the root cause evaluation.
- 25. Was any testing done for tritium during site construction
? What were the results? Was any testing done for the 1998 spill ? Who was responsible for sampling the 1998 event?Yes, testing was done in 1976, but I don't know the results. Don't know what was done for the 1998 spill. This will be evaluated as part of the root cause.26. How many gallons of water were spilled in the 2000 event ? How come nobody noticed the leakage for so long ?About 3 million gallons were spilled during the 2000 event. -Why it went undetected will also be evaluated as part of the root cause evaluation.
- 27. Did the leakage (1 998 and 2000) occur from the 8 Inch diameter vent piping ?No. The leakage occurred in the valve pit and escaped through the manhole.28. What caused the failure of the vacuum breaker valve ? Is there a way to stop the water flow if the valve failed ?A leak detection system was being evaluated, but does not appear to be very reliable.29. What else Is In the water besides tritium ? Is Co-60 present ?Besides tritium, the samples were analyzed for radioactive particulates; none were found. 0o-60 is a particulate and, as stated, was not identified.