Callaway Plant - Notification of an NRC Triennial Fire Protection Baseline Inspection While Transition to 10 CFR Part 50.48 (C) Is in Progress. (05000483-06-008)
ML062620505
Person / Time
Site: Callaway Ameren icon.png
Issue date: 09/19/2006
From: Smith L J
Division of Reactor Safety IV
To: Naslund C D
Union Electric Co
References
IR-06-008
Download: ML062620505 (8)


See also: IR 05000483/2006008

Text

September 19, 2006Charles D. Naslund, Senior Vice President and Chief Nuclear Officer

Union Electric Company

P.O. Box 620

Fulton, MO 65251 SUBJECT:CALLAWAY PLANT - NOTIFICATION OF AN NRC TRIENNIAL FIREPROTECTION BASELINE INSPECTION WHILE TRANSITION TO 10 CFR

PART 50.48 (c) IS IN PROGRESS. (05000483/2006008) Dear Mr. Naslund:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC),Region IV staff will conduct a triennial fire protection baseline inspection at your Callaway Plantin October and November of 2006. The inspection team will be comprised of reactor inspectorsfrom the NRC Region IV office and a contractor. The inspection will be conducted inaccordance with Inspection Procedure 71111.05TTP, the NRC's baseline fire protectioninspection procedure for plants in the process of implementing 10 CFR 50.48(c), NFPA 805.

The inspection guidance is different from the regular triennial inspections in that the inspectors

will concentrate on the fire protection program infrastructure and the adequacy of compensatorymeasures implemented for identified departures for code requirements. The inspectors will notroutinely inspect for or evaluate circuit related issues.The schedule for the inspection is as follows:

  • Information gathering visit: October 23 - 25, 2006*Onsite inspection:November 13 - 17, 2006November 27 - December 1, 2006Members of the inspection team will visit the Callaway Plant on October 23 - 25, 2006, to gatherinformation and documents needed to support the inspection, obtain unescorted access, to

become familiar with your fire protection program, and to select the fire areas of interest for theinspection. The enclosure to this letter provides a list of documents the team will

need toreview. You are requested to transmit copies of some of the documents to the NRC Region IVoffice for team use in preparation for the inspection by the dates listed. We request that during the onsite inspection weeks, you ensure that copies of analyses,evaluations, or documentation regarding the implementation and maintenance of the fireprotection program, including post-fire safe shutdown capability, be readily accessible to theteam for their review. Of specific interest are those documents that establish that your fire

Union Electric Company-2-protection program satisfies NRC regulatory requirements and conforms to applicable NRCand industry fire protection guidance. Also, appropriate personnel knowledgeable of: (1) those

plant systems required to achieve and maintain safe shutdown conditions from inside andoutside the control room, (2) the electrical aspects of the post-fire safe shutdown analyses,

(3) reactor plant fire protection systems, and (4) the fire protection program and itsimplementation should be available to support the team at the site during the inspection. Your cooperation and support during this inspection will be appreciated. If you have questionsconcerning this inspection or the inspection team's information or logistical needs, please

contact John M. Mateychick at 817-276-6560.Sincerely, John M. Mateychick for

Linda J. Smith, ChiefEngineering Branch 2

Division of Reactor SafetyDocket: 50-483License: NPF-30cc w/enclosure:Professional Nuclear Consulting, Inc.

19041 Raines Drive

Derwood, MD 20855John O'Neill, Esq.Pillsbury Winthrop Shaw Pittman LLP

2300 N. Street, N.W.

Washington, DC 20037Keith A. Mills, Supervising Engineer, Regional Regulatory Affairs/

Safety Analysis

AmerenUE

P.O. Box 620

Fulton, MO 65251Missouri Public Service CommissionGovernor's Office Building

200 Madison Street

P.O. Box 360

Jefferson City, MO 65102

Union Electric Company-3-H. Floyd GilzowDeputy Director for Policy

Missouri Department of Natural Resources

P. O. Box 176

Jefferson City, MO 65102-0176Rick A. Muench, President and Chief Executive Officer

Wolf Creek Nuclear Operating Corporation

P.O. Box 411

Burlington, KS 66839Dan I. Bolef, PresidentKay Drey, Representative

Board of Directors Coalition

for the Environment

6267 Delmar Boulevard

University City, MO 63130Les H. Kanuckel, ManagerQuality Assurance

AmerenUE

P.O. Box 620

Fulton, MO 65251Director, Missouri State Emergency Management Agency

P.O. Box 116

Jefferson City, MO 65102-0116Keith D. Young, ManagerRegulatory Affairs

AmerenUE

P.O. Box 620

Fulton, MO 65251David E. Shafer Superintendent, Licensing

Regulatory Affairs

AmerenUE

P.O. Box 66149, MC 470

St. Louis, MO 63166-6149Certrec Corporation4200 South Hulen, Suite 630

Fort Worth, TX 76109

Union Electric Company-4-Keith G. Henke, PlannerDivision of Community and Public Health

Office of Emergency Coordination

930 Wildwood, P.O. Box 570

Jefferson City, MO 65102

Union Electric Company-5-Electronic distribution by RIV:Regional Administrator (BSM1)DRP Director (ATH)DRS Director (DDC)DRS Deputy Director (RJC1)Senior Resident Inspector (MSP)Branch Chief, DRP/B (WBJ)Senior Project Engineer, DRP/B (RAK1)Team Leader, DRP/TSS (RLN1)RITS Coordinator (KEG)DRS STA (DAP)S. O'Connor, OEDO RIV Coordinator (SCO)ROPreports

CWY Site Secretary (DVY)SUNSI Review Completed: ADAMS: Yes G No Initials: LJS Publicly Available

G Non-Publicly Available

G Sensitive Non-SensitiveR:\_REACTORS\CW\2006\CW FPT Notification Letter.wpdRIV: DRS/EB2/SRIC: EB2JMMateychickLJSmith/RA//RA/

09/18/200609/18/2006OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

EnclosureENCLOSURETriennial Fire Protection Inspection Documentation RequestedPlease provide the following documentation prior to the onsite information gathering trip,preferably no later than October 10, 2006. Where practical, please provide copies electronically

on compact discs. 1.The current version of your fire protection program and fire hazards analysis.

2.Post-fire safe shutdown analysis and any supporting calculations which demonstrateacceptable plant response. 3.Copies of the licensing basis documents for fire protection (Safety Evaluation Reports,pertinent sections of the Final Safety Analysis Report, exemptions, deviations, letters

to/from the NRC regarding fire protection/fire safe shutdown, etc.).4.The Fire PRA or portions of the plant's IPEEE addressing fire events.

Please provide the following documentation during the onsite information gathering tripOctober 23 - 25, 2006. Where practical, please provide copies electronically on compact discs. However, drawings should be provided as paper copies of sufficient size that all details arelegible. Fire protection program implementing procedures (e.g., administrative controls,surveillance testing). 5.Operating procedures used for achieving and maintaining hot and cold shutdownconditions from the control room in the event of a fire outside the control room (III.G.2areas).6.Operating procedure(s) used to implement an alternative shutdown (III.G.3 areas)capability with or without control room evacuation.7.Pre-fire plans for the selected fire areas (areas to be selected by the team during theinformation-gathering trip). 8.A list of equipment used to achieve and maintain hot standby and cold shutdowns in theevent of a fire (safe shutdown equipment lists), and two copies of the piping and

instrumentation (flow) diagrams for these systems of a size sufficient to read all details. These should include the systems used for RCS makeup, RCS pressure control, decayheat removal, and reactivity control, including the essential support systems.9.Piping and instrumentation (flow) diagrams showing the components used to achieveand maintain hot standby and cold shutdowns for fires outside the control room and

those components used for those areas requiring alternative shutdown capability.

10.Plant layout and equipment drawings for the selected fire areas that identify (a) thephysical plant locations of major hot standby and cold shutdown equipment; (b) plant fire

-2-Enclosurearea and/or fire zone delineation; and (c) the locations of fire protection equipment, suchas detection, suppression, and post-fire emergency lighting units, and (d) fire area

boundaries. 11.Procedures/instructions that govern the implementation of plant modifications,temporary modifications, maintenance, and special operations, and their impact on fire

protection.12.A listing of design change packages, which were determined to impact fire protectionand post-fire safe shutdowns, performed in the last 3 years.13.A listing of Generic Letter 86-10 evaluations performed in the last 3 years.

14.A listing of open and closed fire protection condition reports initiated in the last 3 yearswhich relate to the fire protection program or equipment.15.A listing of the applicable codes and standards (e.g. NFPA) related to the design ofplant fire protection features and evaluations of any code deviations.16.Drawings the portions of the emergency lighting system which support fire response.17.Procedures used to remove smoke from safety-related areas and the engineeringstudies or calculations which support the design basis.18.Drawings of communication systems credited in the license basis for firefighting andplant operations during fires where control room is occupied and/or evacuated.19.Piping and instrumentation (flow) diagrams for the fire water and sprinkler systems.20.Maintenance and surveillance testing procedures for alternative shutdown capability andfire barriers, detectors, pumps and suppression systems.21.Maintenance Rule performance criteria and 3 years worth of performance history for fireprotection program systems or functions monitored within the Maintenance Ruleprogram.22.A copy of fire protection program requirements (e.g. limiting conditions for operation,surveillance test requirements) covered by Technical Specifications, Technical

Requirements Manual, UFSAR, or similar documents.23.Copies of internal and external self-assessments, audits, peer-assessments or similarreviews related to post-fire safe shutdown capability or the fire protection programcompleted within the last 3 years.24.A list of manual actions taken outside the control room which are credited to mitigate theconsequences of fires in III.G.2 areas (non-alternative shutdown areas). The list shouldgroup actions by the initiating fire area or zone and indicate where the action must take

place.

-3-Enclosure25.Electronic copies of operator study guides (lesson plan text and graphics) or designbasis documents that describe the purpose/function/operating characteristics of the safeshutdown systems (RCS makeup, RCS pressure control, decay heat removal, andreactivity control, including the essential support systems).26.Two copies of one-line diagrams of the electrical distribution system. These shoulddepict how power gets from the switchyard to ESF loads (480V and 4160V). Also,

include the vital DC distribution system one-line diagrams. 27.Please provide a list of automatic and manually initiated gaseous fire suppressionsystems in the plant, giving location and the key equipment being protected. 28.Please provide a list of repairs (and the procedure that controls the actions) needed to: a) reach and/or maintain hot shutdown; b) reach and/or maintain cold shutdowns.28.A list of high to low pressure interface valves.

29.A copy of procedures governing the training and operation of the fire brigade.

30.The team would like to observe a fire brigade drill in the plant, if possible, during theweek of November 27, 2006. Please put us in contact with the appropriate personnel

for planning drills during the onsite information gathering trip October 23 - 25, 2006. 31.Organization charts of site personnel down to the level of fire protection staff personnel.

32.A contact list of key site personnel who will be supporting this inspection, giving locationof their office and phone number onsite.