ML070530475

From kanterella
Revision as of 20:51, 24 October 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Joseph M. Farley Notification of Inspection and Request for Information
ML070530475
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 02/22/2007
From: Hopper G T
NRC/RGN-II/DRS/EB3
To: Johnson J R
Southern Nuclear Operating Co
References
Download: ML070530475 (9)


Text

February 22, 2007Southern Nuclear Operating Company, Inc.ATTN:Mr. J. Randy JohnsonVice PresidentP. O. Box 1295 Birmingham, AL 35201

SUBJECT:

JOSEPH M. FARLEY NUCLEAR PLANT, UNIT 2 - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION

Dear Mr. Johnson:

From April 16 - 27, 2007, the NRC will perform the baseline inservice inspection (ISI) at theFarley Nuclear Plant, Unit 2 (NRC Inspection Procedure 71111.08). Experience has shown that this inspection is resource intensive both for the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. These documents have been divided into two groups. The first group (section A of the enclosure) identifies information to be provided prior to the inspection to ensure that the inspectors are adequately prepared. The second group (section B of the enclosure) identifies the information the inspectors will need upon arrival at the site. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.We have discussed the schedule for these inspection activities with your staff and understandthat our regulatory contacts for this inspection will be Anna Cook and Danny Cordes of your ISI organization. Our inspection dates are subject to change based on your updated schedule of outage activities. If there are any questions about this inspection or the material requested, please contact the lead inspector Barry Miller at (404) 562-4632 (bwm1@nrc.gov).In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and itsenclosure will be available electronically for public inspection in the NRC PublicDocument Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).Sincerely,\\RA by R. Carrion Acting For\\George T. Hopper, ChiefEngineering Branch 3 Division of Reactor SafetyDocket No. 50-364License No. NPF-8

Enclosure:

See next page SNC2

Enclosure:

Inservice Inspection Document Requestcc w/encl:B. D. McKinney, Licensing Services Manager, B-031 Southern Nuclear Operating Company, Inc.

Electronic Mail DistributionL. M. Stinson,Vice President,Fleet Operations Support-Farley Plant Southern Nuclear Operating Company, Inc.

Electronic Mail DistributionJ. T. GasserExecutive Vice President Southern Nuclear Operating Company, Inc.

Electronic Mail DistributionBentina C. TerrySouthern Nuclear Operating Company, Inc.

Bin B-022 P. O. Box 1295 Birmingham, AL 35201-1295State Health OfficerAlabama Department of Public Health RSA Tower - Administration 201 Monroe St., Suite 700 P. O. Box 303017 Montgomery, AL 36130-3017M. Stanford BlantonBalch and Bingham Law Firm P. O. Box 306 1710 Sixth Avenue North Birmingham, AL 35201William D. OldfieldQuality Assurance Supervisor Southern Nuclear Operating Company Electronic Mail Distribution

_______ML070530475

__OFFICERII:DRSRII:DRSSIGNATUREBWM1RPC1 ForNAMEBMillerGHopperDATE2/22/20072/22/2007 E-MAIL COPY? YESNO YESNO YESNO YESNO YESNO YESNO YESNO INSERVICE INSPECTION DOCUMENT REQUESTInspection Dates:April 16 - 27, 2007Inspection Procedures:IP 71111.08 "Inservice Inspection (ISI) Activities" Inspector:Barry Miller, Reactor Inspector A.Information Requested for the In-Office Preparation WeekThe following information should be sent to the Region II office in hard copy orelectronic format (CD preferred), in care of Barry Miller by April 9, 2007, to facilitate the selection of specific items that will be reviewed during the onsite inspection week. The inspector will select specific items from the information requested below and then request from your staff additional documents needed during the onsite inspection week (section B of this enclosure). We ask that the specific items selected from the lists be available and ready for review on the first day of inspection. *Please provide requesteddocumentation electronically if possible. If requested documents are large and onlyhard copy formats are available, please inform the inspector and provide subjectdocumentation during the first day of the onsite inspection. If you have any questionsregarding this information request, please call the inspector as soon as possible.A.1ISI / Welding Programs and Schedule Informationa)A detailed schedule (including preliminary dates) of:i) Nondestructive examinations (NDEs) planned for Class 1 & 2 systemsand containment, performed as part of your ASME Section XI, Risk Informed (if applicable), and augmented ISI Programs during the upcoming outage.ii) Reactor pressure vessel head (RPVH) examinations planned for theupcoming outage, if any.iii)Examinations planned for Alloy 82/182/600 components that are notincluded in the Section XI scope. (If applicable)iv)Examinations planned as part of your Boric Acid Corrosion ControlProgram (Mode 3 walkdowns, bolted connection walkdowns, etc.)v)Welding activities that are scheduled to be completed during the upcoming outage (ASME Class 1, 2, or 3 structures, systems, or components (SSCs))b)A copy of ASME Section XI Code Relief Requests and associated NRC SafetyEvaluations applicable to the examinations identified above. c)A list of NDE reports (ultrasonic, radiography, magnetic particle, dye penetrant,visual VT-1, VT-2, and VT-3) which have identified recordable indications 2(geometric or flaw) on Code Class 1 & 2 systems since the beginning of the lastrefueling outage. The list of NDE reports should include a brief description of the SSC where the recordable indication was identified.d)A list with a brief description (e.g. system, material, pipe size, weld number, andNDE performed) of the welds in Code Class 1 and 2 systems which have been fabricated due to component repair/replacement activities since the beginning of the last refueling outage, or are planned to be fabricated this refueling outage. e)If reactor vessel weld examinations required by the ASME Code are scheduledto occur during the upcoming outage, provide a detailed description of the welds to be examined, and the extent of the planned examination. Please also provide reference numbers for applicable procedures that will be used to conduct these examinations.f)Copy of any 10 CFR Part 21 reports applicable to your SSCs within the scope ofSection XI of the ASME Code that have been identified since the beginning of the last refueling outage.g) A list of any temporary non-code repairs in service (e.g., pinhole leaks).

h)Please provide copies of the most recent self-assessments for the ISI, Welding,and Alloy 600 Programs. A.2Reactor Pressure Vessel Upper Head (RPVUH)

Not applicableA.3Boric Acid Corrosion Control Program (BACCP)a) Copy of the procedures that govern the scope, equipment and implementation ofthe inspections required to identify boric acid leakage and the procedures for boric acid leakage/corrosion evaluation.b)Please provide a list of leaks (including code class of the components) that havebeen identified since the last refueling outage and associated corrective action documentation. If during the last cycle, the Unit was shutdown, please provide documentation of containment walk-down inspections performed as part of the

BACCP.c)Please provide a copy of the most recent self-assessment performed for the BACCP.

3A.4Steam Generator (SG) Inspectionsa)A detailed schedule of:i) SG tube inspection, data analyses, and repair activities for the upcomingoutage. (If occurring)ii) SG secondary side inspection activities for the upcoming outage. (Ifoccurring)b)Please provide a copy of your SG ISI Inspection Program and Plan. Pleaseinclude a copy of the Operational Assessment from last outage, and a copy of the following documents as they become available: i)Degradation Assessmentii)Condition Monitoring Assessment c)If you are planning on modifying your Technical Specifications such that they areconsistent with TSTF-449, please provide copies of your correspondence with the NRC regarding deviations from the STS.d)Copy of SG history documentation given to vendors performing eddy current(ET) testing of the SGs during the upcoming outage.e)Copy of SG Eddy Current Data Analyst Guidelines, and Site Validated EddyCurrent Technique. Additionally, please provide a copy of EPRI Appendix H Eddy Current Technique Qualification Records.f)Identify and quantify any SG tube leakage experienced during the previousoperating cycle. Also provide documentation identifying which SG was leaking and corrective actions completed or planned for this condition. (If applicable)g) Provide past history of the condition and issues pertaining to the secondary sideof the steam generators (including items such as loose parts, fouling, top of tube sheet condition, crud removal amounts, etc.)h)Please provide copies of your most recent self-assessments of the SGmonitoring, loose parts monitoring, and secondary side water chemistry control programs.i)Please also indicate where the primary, secondary, and resolution analyses arescheduled to take place.j)Please provide a summary of the scope of the SG ISI examinations, includingexamination methods such as Bobbin, Rotating Pancake, or Plus Points, and the percentage of tubes to be examined. *Do not provide these documentsseparately if already included in other information requested.

4A.5Additional information related to all ISI activitiesa) A list with a brief description of ISI, BACCP, and SG ISI related issues (e.g.,condition reports) entered into your corrective action program since the beginning of the last refueling outage (for Units 1 and 2). For example, a list based upon data base searches using key words related to piping or SG tube degradation such as: ISI, ASME Code,Section XI, NDE, cracks, wear, thinning, leakage, rust, corrosion, boric acid, or errors in piping/SG tube examinations.b) Please provide names and phone numbers for the following program leads:ISI contacts (Examination, planning)Containment Exams Snubbers and Supports Repair and Replacement Program Manager Licensing Contact Site Welding Engineer Boric Acid Corrosion Control Program SG Inspection Activities (site lead and vendor contact)B.Information to be provided onsite to the inspector at the entrance meeting(April 16, 2007):B.1ISI / Welding Programs and Schedule Informationa)Updated schedules for ISI/NDE activities, including SG ISI, planned weldingactivities, and schedule showing contingency repair plans, if available.b)For ASME Class 1 and 2 welds selected by the inspector from the lists providedfrom section A of this enclosure, please provide copies of the following documentation for each subject weld:i)Weld data sheet (traveler)ii)Weld configuration and system location iii)Applicable Code Edition and Addenda for weldment iv)Applicable Code Edition and Addenda for welding procedures v)Applicable weld procedures (WPS) used to fabricate the welds vi)Copies of procedure qualification records (PQRs) supporting the WPSfrom B.1.b.vvii)Copies of mechanical test reports identified in the PQRs above viii)Copies of the nonconformance reports for the selected welds. (If applicable)ix)Radiographs of the selected welds and access to equipment to allowviewing radiographs. (If RT was performed)x)Copies of the preservice examination records for the selected welds.

xi)Copies of welder performance qualifications records applicable to WPS,including documentation that welder maintained proficiency in the applicable welding processes specified in the WPS. (At least six months 5prior to date subject work)xii)Copies of NDE personnel qualification (VT, PT, UT, RT), as applicable.c)For the ISI-related corrective action issues selected by the inspector from sectionA of this enclosure, provide a copy of the corrective actions and supporting documentation.d)For the NDE reports with recordable indications on Code Class 1 & 2 systemsselected by the inspector from section A above, provide a copy of the examination records, examiner qualification records, and associated corrective action documents.e)A copy of (or ready access to) most current revision of the ISI Program Manualand Plan for the current Interval. f)For the NDEs selected by the inspector from section A of this enclosure, providea copy of the NDE procedures used to perform the examinations (including calibration and flaw characterization/sizing procedures). For ultrasonic examination procedures qualified in accordance with ASME Code,Section XI, Appendix VIII, provide documentation supporting the procedure qualification(e.g., the EPRI performance demonstration qualification summary sheets). Also, include documentation of the specific equipment to be used (e.g., ultrasonic unit, cables, and transducers including serial numbers) and NDE personnel qualification records.B.2Reactor Pressure Vessel Upper Head (RPVUH)

Not applicableB.3Boric Acid Corrosion Control Program (BACCP)a)Please provide boric acid walkdown inspection results, an updated list of boricacid leaks identified so far this outage, associated corrective action documentation, and overall status of planned boric acid inspections. b)Please provide any engineering evaluations completed for boric acid leaksidentified since the end of the last refueling outage. Please include a status of corrective actions to repair and/or clean these boric acid leaks. Please specify which known leaks, if any, have remained in service or will remain in service as active leaks. c) In accordance with NRC inspection procedure 71111.08, the inspector would liketo conduct an independent boric acid walkdown of the Reactor Building early in the inspection week. Please have knowledgeable BACCP staff available to accompany the inspector during the walkdown.

6B.4Steam Generator (SG) Inspectionsa)Copies of the Examination Technique Specification Sheets (ETSSs) andassociated justification for any revisions.b)Copy of the guidance to be followed if a loose part or foreign material is identifiedin the SGs.c)Please provide a copy of the ET procedures used to perform the SG ISI(specifically calibration and flaw characterization/sizing procedures, etc.). Also include documentation for the specific equipment to be used.d)Please provide copies of your responses to NRC and industry operatingexperience communications such as Generic Letters, Information Notices, etc.

(As applicable to SG inspections) *Do not provide these documents separately ifalready included in other information requested such as the degradation

assessment.e)List of corrective action documents generated by the vendor and/or site withrespect to SG inspection activities.B.5Codes and Standards a)Ready access to: (i.e., copies provided to the inspector to use for the duration ofthe inspection at the onsite inspection location, or room number and location where available)i) Applicable editions of the ASME Code (Sections V, IX, and XI) for theinservice inspection program and the repair/replacement program. ii) EPRI and industry standards referenced in the procedures used toperform the SG tube eddy current examination.Inspector Contact Information

Barry MillerReactor Inspector 404-562-4632 bwm1@nrc.gov Mailing Address
US NRC Region 2 Attn: Barry Miller 61 Forsyth Street SW, Suite 23T85 Atlanta, GA 30303