Callaway Plant, Unit 1 - Correction to Amendment No. 180 Replacing Containment Sump Trash Racks and Screens with Strainers and Relocate Containment Ph Control System from Current Location (TAC No. MD2033)
ML071010354
Person / Time
Site: Callaway Ameren icon.png
Issue date: 04/18/2007
From: Donohew J N
NRC/NRR/ADRO/DORL/LPLIV
To: Naslund C D
Union Electric Co
Donohew J N, NRR/DORL/LP4, 415-1307
References
EA-06-037, TAC MD2363, ULNRC-05293, ULNRC-05347, ULNRC-05353
Download: ML071010354 (4)


Text

April 18, 2007Mr. Charles D. NaslundSenior Vice President and Chief Nuclear Officer Union Electric Company Post Office Box 620 Fulton, MO 65251

SUBJECT:

CALLAWAY PLANT, UNIT 1 - CORRECTION TO AMENDMENT NO. 180 RE: REPLACING CONTAINMENT SUMP TRASH RACKS AND SCREENS WITH STRAINERS AND RELOCATE CONTAINMENT PH CONTROL SYSTEM FROM CURRENT LOCATION (TAC NO. MD2363)

Dear Mr. Naslund:

In our letter to you dated February 21, 2007, the Nuclear Regulatory Commission (NRC) issuedAmendment No. 180 to Facility Operating License No. NPF-30 for the Callaway Plant, Unit 1.

The amendment consisted of changes to the Technical Specifications, in response to yourapplication dated May 30, 2006 (ULNRC-05293), as supplemented by letters dated November 22 and December 19, 2006 (ULNRC-05347 and ULNRC-05353, respectively).Inadvertently, in the amendment, the NRC staff also issued an out-of-date Page 5 of thelicense. Enclosed is a corrected Page 5 of the license with the correct reference to the revised Callaway Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan that implemented NRC Order EA-06-037, which was issued on February 13, 2007.Please replace Page 5 of the license with the enclosed page. We apologize for any problemscaused by this mistake.Sincerely,/RA/Jack Donohew, Senior Project ManagerPlant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-483

Enclosure:

Revised Page 5 of the license cc w/encl: See next page April 18, 2007Mr. Charles D. Naslund Senior Vice President and Chief Nuclear Officer Union Electric Company Post Office Box 620 Fulton, MO 65251

SUBJECT:

CALLAWAY PLANT, UNIT 1 - CORRECTION TO AMENDMENT NO. 180 RE: REPLACING CONTAINMENT SUMP TRASH RACKS AND SCREENS WITH STRAINERS AND RELOCATE CONTAINMENT PH CONTROL SYSTEM FROM CURRENT LOCATION (TAC NO. MD2033)

Dear Mr. Naslund:

In our letter to you dated February 21, 2007, the Nuclear Regulatory Commission (NRC) issuedAmendment No. 180 to Facility Operating License No. NPF-30 for the Callaway Plant, Unit 1.

The amendment consisted of changes to the Technical Specifications, in response to yourapplication dated May 30, 2006 (ULNRC-05293), as supplemented by letters dated November 22 and December 19, 2006 (ULNRC-05347 and ULNRC-05353, respectively).Inadvertently, in the amendment, the NRC staff also issued an out-of-date Page 5 of thelicense. Enclosed is a corrected Page 5 of the license with the correct reference to the revised Callaway Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan that implemented NRC Order EA-06-037, which was issued on February 13, 2007.Please replace Page 5 of the license with the enclosed page. We apologize for any problemscaused by this mistake.Sincerely,/RA/Jack Donohew, Senior Project ManagerPlant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-483DISTRIBUTION

PUBLICLPLIV Reading

Enclosure:

Revised Page 5 of the licenseRidsNrrDorlDprGHill (2)RidsNrrDorlcc w/encl: See next pageRidsNrrDorlLpl4RidsNrrPMJDonohew RidsNrrLALFeizollahi RidsOgcRp RidsAcrsAcnwMailCenter RidsRegion4MailCenterACCESSION NO.: ML071010354OFFICENRR/LPL4/PMNRR/LPL4/LANRR/LPL4/BCNAMEJDonohewLFeizollahiTHiltz DATE04/17/074/18/074/18/07OFFICIAL RECORD COPY (11)Steam Generator Tube Rupture (Section 15.4.4, SSER #3)Deleted per Amendment No. 169.(12)Low Temperature Overpressure Protection (Section 15, SSER #3)Deleted per Amendment No. 169.(13)LOCA Reanalysis (Section 15, SSER #3)Deleted per Amendment No. 169.(14)Generic Letter 83-28Deleted per Amendment No. 169.(15)Additional ConditionsThe Additional Conditions contained in Appendix C, as revised throughAmendment No. 180, are hereby incorporated into this license. UE shall loperate the facility in accordance with the Additional Conditions.D.An Exemption from certain requirements of Appendix J to 10 CFR Part 50, aredescribed in the October 9, 1984 staff letter. This exemption is authorized by law and will not endanger life or property or the common defense and security and are otherwise in the public interest. Therefore, this exemption is hereby granted pursuant to 10 CFR 50.12. With the granting of this exemption the facility will operate, to the extent authorized herein, in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission.E.UE shall fully implement and maintain in effect all provisions of theCommission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contain Safeguards Information protected under 10 CFR 73.21, are entitled: "Callaway Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 0" submitted by letter dated October 20, 2004, as supplemented by the letter May 11, 2006.F.Deleted per Amendment No. 169.Amendment 180 June 2006Callaway Plant, Unit 1 cc:Professional Nuclear Consulting, Inc.

19041 Raines Drive Derwood, MD 20855John O'Neill, Esq.Pillsbury Winthrop Shaw Pittman LLP 2300 N. Street, N.W.

Washington, D.C. 20037Mr. Keith A. Mills, Supervising EngineerRegional Regulatory Affairs/Safety Analysis AmerenUE P.O. Box 620 Fulton, MO 65251U.S. Nuclear Regulatory CommissionResident Inspector Office

8201 NRC Road Steedman, MO 65077-1302Mr. Les H. KanuckelManager, Quality Assurance AmerenUE P.O. Box 620 Fulton, MO 65251Missouri Public Service CommissionGovernor Office Building 200 Madison Street Jefferson City, MO 65102-0360Regional Administrator, Region IVU.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005Mr. H. Floyd GilzowDeputy Director for Policy Missouri Department of Natural Resources P.O. Box 176 Jefferson City, MO 65102-0176Mr. Rick A. MuenchPresident and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KA 66839Mr. Dan I. Bolef, PresidentKay Drey, Representative Board of Directors Coalition for the Environment 6267 Delmar Boulevard University City, MO 63130Mr. Lee Fritz, Presiding CommissionerCallaway County Court House 10 East Fifth Street Fulton, MO 65151Mr. David E. Shafer Superintendent, Licensing Regulatory Affairs AmerenUE P.O. Box 66149, MC 470 St. Louis, MO 63166-6149Manager, Regulatory AffairsAmerenUE P.O. Box 620 Fulton, MO 65251Mr. Keith G. Henke, PlannerDivision of Community and Public Health Office of Emergency Coordination 930 Wildwood P.O. Box 570 Jefferson City, MO 65102Certrec Corporation4200 South Hulen, Suite 630 Fort Worth, TX 76109Director, Missouri State Emergency Management Agency P.O. Box 116 Jefferson City, MO 65102-0116