Tech Spec Pages for Amendment 180 Regarding Replacing Containment Sump Trash Racks and Screens with Strainers and Relocate the Containment Ph Control System from Current Location
ML070520614
Person / Time
Site: Callaway Ameren icon.png
Issue date: 02/21/2007
From:
NRC/NRR/ADRO/DORL/LPLIV
To:
Donohew J N, NRR/DORL/LP4, 415-1307
Shared Package
ML063420043 List:
References
TAC MD2363
Download: ML070520614 (5)


Text

(4)

UE, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source of special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5)

UE, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.

C.

This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1)

Maximum Power Level UE is authorized to operate the facility at reactor core power levels not in excess of 3565 megawatts thermal (100% power) in accordance with the conditions specified herein.

(2)

Technical Specifications and Environmental Protection Plan*

The Technical Specifications contained in Appendix A, as revised through Amendment No. 180 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

(3)

Environmental Qualification (Section 3.11, SSER #3)**

Deleted per Amendment No. 169 Amendments 133, 134, &135 were effective as of April 30, 2000 however these amendments were implemented on April 1, 2000.

The parenthetical notation following the title of many license conditions denotes the section of the Safety Evaluation Report and/or its supplements wherein the license condition is discussed.

Amendment 180 (11)

Steam Generator Tube Rupture (Section 15.4.4, SSER #3)

Deleted per Amendment No. 169.

(12)

Low Temperature Overpressure Protection (Section 15, SSER #3)

Deleted per Amendment No. 169.

(13)

LOCA Reanalysis (Section 15, SSER #3)

Deleted per Amendment No. 169.

(14)

Generic Letter 83-28 Deleted per Amendment No. 169.

(15)

Additional Conditions The Additional Conditions contained in Appendix C, as revised through Amendment No. 180, are hereby incorporated into this license. UE shall operate the facility in accordance with the Additional Conditions.

D.

An Exemption from certain requirements of Appendix J to 10 CFR Part 50, are described in the October 9, 1984 staff letter. This exemption is authorized by law and will not endanger life or property or the common defense and security and are otherwise in the public interest. Therefore, this exemption is hereby granted pursuant to 10 CFR 50.12. With the granting of this exemption the facility will operate, to the extent authorized herein, in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission.

E.

UE shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contain Safeguards Information protected under 10 CFR 10 CFR 73.21, are entitled: "Callaway Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 0" submitted by letter dated October 20, 2004, as supplemented by the letter October 22, 2004.

F.

Deleted per Amendment No. 169.

Amendment 180 Amendment Number 133 Additional Conditions For SRs that existed prior to this amendment that have modified acceptance criteria, the first performance is due at the end of the first surveillance interval that began on the date the surveillance was last performed prior to the implementation of this amendment.

For SRs that existed prior to this amendment whose intervals of performance are being extended, the first extended surveillance interval begins upon completion of the last surveillance performed prior to implementation of this amendment.

Technical Specification (TS) 3.6.7 requires the Recirculation Fluid pH Control System to be OPERABLE and Surveillance Requirement (SR) 3.6.7.2 requires verification that the sump pH be

> 7.1. Trisodium phosphate crystalline (TSP-C) will be used for pH control as described in TS Bases 3.6.7. NRC approval is required prior to using a different chemical for pH control.

Implementation Date The amendment shall be implemented by April 30, 2000.

180 Prior to MODE 4 ascending during startup from the Refuel 15 outage.

Amendment No. 180

ECCS - Operating 3.5.2 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.5.2.5 Verify each ECCS automatic valve in the flow path 18 months that is not locked, sealed, or otherwise secured in position, actuates to the correct position on an actual or simulated actuation signal.

SR 3.5.2.6 Verify each ECCS pump starts automatically on an 18 months actual or simulated actuation signal.

SR 3.5.2.7 Verify, for each ECCS throttle valve listed below, 18 months each mechanical position stop is in the correct position.

Valve Number EMV0095 EMV0107 EMV0089 EMV0096 EMV0108 EMV0090 EMV0097 EMV0109 EMV0091 EMV0098 EMV0110 EMV0092 SR 3.5.2.8 Verify, by visual inspection, each ECCS train 18 months containment sump suction inlet is not restricted by debris and the suction inlet strainers show no evidence of structural distress or abnormal corrosion.

I CALLAWAY PLANT 3.5-5 Amendment No. 180

Recirculation Fluid pH Control System 3.6.7 3.6 CONTAINMENT SYSTEMS 3.6.7 Recirculation Fluid pH Control (RFPC) System LCO 3.6.7 The RFPC System shall be OPERABLE.

APPLICABILITY:

ACTIONS MODES 1, 2, 3, and 4.

COMPLETION CONDITION REQUIRED ACTION TIME TIME A.

RFPC System inoperable.

A.1 Restore RFPC System 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to OPERABLE status.

B. Required Action and B.1 Be in MODE 3.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.

AND B.2 Be in MODE 5.

84 hours9.722222e-4 days <br />0.0233 hours <br />1.388889e-4 weeks <br />3.1962e-5 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.7.1 Verify the integrity of the RFPC System.

18 months SR 3.6.7.2 Verify the RFPC System ensures an equilibrium sump 18 months pH Ž_7.1.

CALLAWAY PLANT 3.6-21 Amendment No. 180