NRC Comments to Initial Exam Submittal Including ES-401-9 and Operating Comments for the Monticello Initial Examination February 2007
ML071230740
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 05/03/2007
From: Valos N A
NRC/RGN-III/DRS/OLB
To:
Shared Package
ML070660508 List:
References
50-263/07-301, ES-401-9
Download: ML071230740 (22)


Text

NRC COMMENTS TO INITIAL EXAM SUBMITTAL INCLUDING ES-401-9 AND OPERATING COMMENTS FOR THE MONTICELLO INITIAL EXAMINATION FEBRUARY 2007 I. 1. 2. 3. Psychometric Flaws

4. Job Content Flaws Q# LOK LOD (FIH) (1-5) Stem Cues TIF Cred. Partial Job- Minutia
  1. I Back- Focus Dist. Link units ward 1H3 2H3 11. At a minimum, explain any "U" ratings (e.g., how the Appendix E3 psychometric attributes are not being met).
5. Other 6. 7. Q= SRO UIWS Explanation WA Only S New. E Modified.
1) Re-word the first sentence in the question stem to state: Thc reactor was shutdown and "A" loop of RHR was placed in Shutdown Cooling (SDC). 2) In distractors B. C, and D, add the word RPV water level. 3) In distractor B, fully capitalize the word "Only" for emphasis and delete the second part of the distractor that states "and can be re-opened after the group 2 isolation is reset." RESOLUTION: Comments incorporated.

A "+" in the "Q#" column indicates that question was reviewed as part of the representative sample of 30 questions.

The stem lacks sufficient focus to elicit the correct answer (e.g., unclear intent, more information is needed, or too much needless information).

The answer choices are a collection of unrelated truelfalse statements. The distractors are not credible; single implausible distractors should be repaired, more than one is unacceptable. . . The stem or distractors contain cues (i.e., clues, specific determiners, phrasing, length, etc). One or more distractors is (are) partially correct (e.g., if the applicant can make unstated assumptions that are not contradicted by stem). 1. Check the appropriate box if a job content error is identified: . . . The question is not linked to the job requirements (i.e., the question has a valid WA but, as written, is not operational in content). The question requires the recall of knowledge that is too specific for the closed reference test mode (Le., it is not required to be known from memory). The question contains data with an unrealistic level of accuracy or inconsistent units (e.g., panel meter in percent with question in gallons).

The question requires reverse logic or application compared to the job requirements.

Check questions that are sampled for conformance with the approved WA and those that are designated SRO-only (WA and license level mismatches are unacceptable). Based on the reviewer's judgment, is the question as written (U)nsatisfactory (requiring repair or replacement), in need of (E)ditorial enhancement, or (S)atisfactory?

I. 3.

ES-401 2 Form ES-401-9 zi SRO U/E/S 7. Explanation New. 1) Fully capitalize the word "Only" in distractors A and B for emphasis.

2) In distractor D, change the word "AND" to a lower case word, since othewise it is ambiguous as to which part of the "OR" expression the "AND applies. RESOLUTION:
1) Comment incorporated.
2) Inserted a comma after the word "normal" to clarify the logical break in the conjunction.

New. 1) In the question stem, add the word "each after "3000 gpm" 2) In distractor D, add the word "Repeated" at the beginning of the distractor.

RESOLUTION: Comments incorporated.

New. 1) Change distractor B to state that the

"... area temperature in not within 5°F ..." (Le., add the word "not"). 2) In the question stem, adc "SBLC" before the words "boron concentration." - NOTE: Question requires a reference.

RESOLUTION:

1) Changed distractor B to say "No action is required." 2) Comment incorporated.

New. New. In the question stem, add the title to procedure C.4-A.

m: Question requires a reference. RESOLUTION: Comment incorporated.

~ New. On the question worksheet it lists NX-7843-67-12 as one of the prints to be supplied during the exam.

However, this print is not in the RO exam reference book?

NOTE: Question requires a reference. RESOLUTION: Deleted the reference to NX-7843-67-12 as one of the prints to be supplied during the exam.

New. NOTE: Question has an attached reference.

New. Bank. NOTE: Question has an attached reference.

New

7. Explanation
4. Job Content Flaws 5. Other 3. Psychometric Flaws - red. )ist. - Yew. 1) Tech Spec 3.5.3, Required Action 8.2 has a Completion Time If 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> to be below an RPV pressure of 150 psig if RClC is noperable. There appears to be no correct answer. 2) The "or" statements in distractors C and D are ambiguous, in that it is not clear that the intent is that if the first part of the distractor is not met, then the

'or" statement applies.

NOTE: Question requires a reference.

RESOLUTION:

1) and 2) Question was replaced with a New question at the Higher Cognitive Level. New. Re-word distractor A in the following way to make the wording similar to distractor C: One Core Spray pump with its associated 4160 KV power supply breaker closed will satisfy the ADS logic blowdown permissive.

RESOLUTION: Comment incorporated.

Bank. S S E - - 16+ 3 3 - - 3 New. New. Question

  • WA, since the question is not associated with the RPL water level control system design features and/or interlocks for 3-element control. The question is associated with when 3-element control is placed in service (an operational question as opposed to a design question).

RESOLUTION:

Question was determined to meet WA, since it requires knowledge of system design and limitations to correctly determine when FW is placed in 3-element control.

However, made the following changes: 1) Clarified question stem to mention design limitations, and 2) Changed distractor D to increase the plausibility of the distractor..

Bank. NOTE: Question has an attached reference.

New. 17 - 18 19+ - S S S - - 3 3 - 20 New.

- E 21 22 - 23+ 24 25 26+ 27 28 29+ 30 31 - - - - - - - 32 33+ 7. 2. I 3. Psvchometric Flaws 4. Job Content Flaws

5. Other ;red. Dist. - - - UIEIS Explanation E - Bank. 1) In the question stem, change the word "should" to "are requirec to." 2) In distractors B and D, re-pharse to say " ... place the TRANSFER CONTROL SWITCH in MANUAL.." 3) Replace or significantly modify question to ensure that only 4 RO questions are repeated from the last 2 NRC exams. RESOLUTION: Replaced question with a New question at the Higher Cognitive Level.

H - F F F - - E Bank. In the question stem, change the word "should to "would." NOTE: Question requires a reference. RESOLUTION: Comment incorporated.

S New. S New. S New. I H H F - - S New. S Bank. S New. I F F H - - - F S New. S New. U New. Distractors B and C are also correct answers, since neither the Drywell spray inboard or outboard valves would open with RPV water level less than 2/3 core height. NOTE: Question requires a reference. RESOLUTION: Question was replaced with a New question at the Higher Cognitive Level.

S Modified.

H U - New. 1) Distractors A and B are not plausible that the turbine stop valves, control valves, or intercept valves would be open following a turbine trip. 2) Need information from facility that shows that the turbinc bypass valves would close if the Aux Oil Pump was not available.

RESOLUTION:

1) and 2) Question was replaced with a New question a the Higher Cognitive Level..
3. Psychometric Flaws
4. Job Content Flaws J/E/S 6' I 7. Explanation
5. Other - artial = - Ainutia - I S New. il 34 35 36+ 37 - - - 39+ - 40 41 42 - - - 43+ - 44 3 S INew. S IBank. S Bank. U New. Distractor B could also be correct as demonstrated on the simulator. - NOTE: Question has an attached reference.

NOTE: Question requires a reference. RESOLUTION: Re-worded question stem and the distractors to ensure that distractor C is the only correct answer. S New. S S - _. E _I E New. 3 New. This question is at the SRO level, since it is associated with 10CFR55.43(b)(2) (Tech Spec Bases), unless there is a Learning Objective for the RO that states that the RO is required to know the basis for the Main Turbine Trip function. RESOLUTION: Ops Man 8.05.06-01, RPS Equipment Description, provides a basis for the Main Turbine Trip that includes providing additional margin for core safety limits. Lesson Plan M-8170L-072 for the Reactor Protection System, Learning Objective 6.1, requires knowin RPS operations and scram logic. Question is thus satisfactory for the RO exam. New. 1) Would the reactor period meter in the Control Room indicate with the 11 IRM on Range 3? 2) Change distractor A from an odd number of 37 seconds to a more rounded off number (e.g., 35 seconds) similar to the other distractors. RESOLUTION: Comments incorporated.

New. In the question stem, fully capiatalize the word EARLIEST to provide emphasis.

NOTE: Question requires a reference. RESOLUTION: Comment incorporated.

3 - 3

~~ E S New. In the question stem add the following words to the question asked: Which ... 2 minutes later assumlnq that (other than the above stated actions)

ONLY the immediate Operator Actions of C.4-B.02.05A have been comdeted?" Otherwise, one could argue thai in 2 minutes one could have performed some subsequent actions of the procedure and re-opened the RBCCW drywell isolation valves, and there is no correct answer. RESOLUTION: Comment incorporated.

New. E E S S S S E New. In distractor D, delete the words "with the recirc pump suction and discharge valves open," since these valves would be open for an operating recirc loop. RESOLUTION: Comment incorporated.

Bank. 1) This question is at the SRO level, since it is associated with lOCFR55.43(b)(7) (Fuel Handling procedures), unless there is a Learning Objective for the RO that states that the RO is required to knov the subject from memory.

2) Distractor D discusses directing the Refueling SRO ..., which an RO would not be expected to do. RESOLUTION:
1) No change required, since there is a Learning Objective for the RO. 2) Deleted the phrase "Direct the Refueling SRO to". New. New. NOTE: Question requires a reference.

New. New. New. Typo:

In distractor A, change "wip" to "whip." RESOLUTION: Comment incorporated.

E ~~~~ Bank. This question should be classified as a Bank question, since there is no pertinent condition changed in the question stem, and all the distractors are the same. RESOLUTION: Comment incorporated.

3. Psychometric Flaws JIEIS 6' I 7. Explanation
1. OK :/H 1 4. Job Content Flaws 5. Other - artial - - #I Back- Q= inits Ill- ward WA ob- Minutia .ink I hes TIF I 46+ 47 - - 48 3 49+ 50 - - 51 2 2 - - 2 3 2 - - 3 52 53t - - 54

~~ S E S ~~ New. This question is at the SRO level, since it is associated with lOCFR5543(b)(2) (Tech Spec Bases), unless there is a Learning Objective for the RO that states that the RO is required to know the basis for SDM criteria from memory. RESOLUTION:

Question is satisfactory, since there is a Learning Objective for the RO. Bank. Distractor C is not plausible, since it is a subset of distractor A (Le., if distractor A were correct, then distractor C would also be correct Suggest adding the word "ONLY at the beginning of distractor C. RESOLUTION: Comment incorporated.

New. 55 - 56+ - 57 58 59+ - - 61 62 63+ 64 - - - - S U E S ~ New. NOTE: Question has an attached reference.

New. 1) One could interpret the data given in the question stem and state that there is no correct answer.

The correct answer is obtained b) assuming that condenser pressure remains below 7.5" Hg Abs. After the time 0710 hours0.00822 days <br />0.197 hours <br />0.00117 weeks <br />2.70155e-4 months <br />. However, one could also reasonably assume tha condenser pressure is continuing to decrease (after 0710) at the same rate as that observed between 0708 and 0710 hours0.00822 days <br />0.197 hours <br />0.00117 weeks <br />2.70155e-4 months <br />.

If one makes this assumption, then a reactor scram at 7.5" Hg Abs. would be required at 071 1 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> based on a rate of decrease in condenser vacuum of 0.45" Hg per minute. 2) In the question stem, fully capitalize the word EARLIEST to provide emphasis.

NOTE: Question requires a reference.

RESOLUTION:

1) Changed the fifth bullet in the question stem by adding the words "and remains stable" at the end of the item.
2) Comment incorporated.

New. This question appears to be at the Fundamental level instead of i the Higher Cognitive level, since only a flow value and a reason are required to answer the question. RESOLUTION: Comment incorporated.

New. S S Bank. New. ~ 6. J/WS 7. Explanation

3. Psychometric Flaws 4. Job Content Flaws
5. Other - artial - - - lack- @ - 3 X 2 3 3 - - - 3 2 3 3 - - ~ S INew. 3 -
5. Other 6. Q= SRO UIWS WA Only S S 7. Explanation New. New. S S S Bank. NOTE: Question requires a reference.

Bank. The question appears to require knowledge that may not be required to be known from memory.

Is there a Lesson Plan Objective that would require an RO to know this information from memory? RESOLUTION: Question is satisfactory, since there is a Learning Objective for the RO. New. 2. LOD (1 -5) - - 3 3. Psychometric Flaws I 4. Job Content Flaws Ainutia 65 F 66+ F 67 F 68 H 69+ F 70 F 71 F 72 H 73+ F 74 H 75 F 76+ H 77 H 78 F 79+ F 80 H 2 ~- I I S IBank. E Bank. Editorial: Add the The" in the question stem (Le., "if authorized by the"). RESOLUTION: Comment incorporated.

Modified. - S E - New. Editorial:

In distractor D, delete the comma after the words "Group 2." RESOLUTION: Comment incorporated.

3 2 2 - - ~- New. Modified.

Bank. 1) In the question stem, change the word "should to %would." 2) On the question worksheet, change the line that says no references provided to "EOP Flow Charts" (similar to question 77).

NOTE: Question requires a reference. RESOLUTION: Comments incorporated.

3 New. NOTE: Question requires a reference.

3 3 - X New. New. New. NOTE: Question requires a reference.

2 -

N m 1 X I E a W i a B rn i-- I I 11 W X E 1x E 3 S !?! 0 0) 0 al a - W X I 91 7 92 - 93+ 94 - - 95 96+ - - 97 98 7 - I RO )nly 1. .OK FIH) - - H U/E/S Explanation 3 - 3 2 - E 1 U 1 2 1 - - 3 2 - - New. Distractor A Is not plausible that there would be an ATWS condition with a manual scram not required. RESOLUTION: Changed distractor A to say entry into the ATWS procedure was required.

New. Distractor B (correct answer) is not correct, since the last sentence in the distractor that says to isolate power to the ball valve is not correct. Would only isolate power if did not have an elevated release but the question stem implies that an elevated release is in progress. 3. Psychometric Flaws 4. Job Content Flaws Ainutia - - - 5. Other I 6. I 7. X - X ~~ xs XE xs xu New. Q: Question requires a reference.

Bank. 1) Editorial:

In distractor D, change the Phrase "as either" to "at either the." 2) Distractor 6 is not specific as to why the requirement for five, 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> shifts was not already satisfied (since the question Stem states that 4 shifts as OATC and 4 shifts as BOP had already been stood). Did the distractor mean to say that the requirement is to stand E 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> shifts in the OATC position?

RESOLUTION:

1) Comment incorporated.
2) Changed distractor D to mention that 5, 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> shifts per quarter in the OATC positionh required. Typo:

"quarters" to "quarter as."

New. Bank. LOD = 1. RESOLUTION:

Question was replaced with a Bank question at the Higher Cognitive Level. New. NOTE: Question requires a reference.

New. 1) Distractor B is literally only correct if 450 mrem TEDE has beer exceeded at the time of declaration of the pregnancy. However, in the question stem 450 mrem TEDE has NOT been exceeded, since the person is 450 mrem. 2) Change distractor D from 450 mrem to 500 mrem. RESOLUTION:

1) Changed question stem from "450 mrem" to "460 mrem." 2) Comment incorporated.

99+ 100 ic Flaws I H 2 F 2 Cred. Partial Dist. t X X - 6. u/E/s - E E - (I 7. Explanation I IBank. In the question stem, fully capitalize the word "NEXT" to provide emphasis. Question requires a reference. RESOLUTION: Comment incorporated Bank. 1) Distractor B is not plausible, since it mentions evacuating 5 and 10 miles down wind (which is it?). 2) In the question stem, fully capitalize the word "INITIALLY" for emphasis.

RESOLUTION:

1) Changed distractor B to say to evacuate "10 miles down wind." 2) Comment incorporated MONTICELLO FEBRUARY 2007 INITIAL LICENSE EXAM OPERATING EXAM COMMENTS Source Admin JPM A RO and SRO [Bulk DMI Temperature Manual Calculation] Admin JPM B RO [Control Room Shift Turnover Checklist]

~ Admin JPM B RO [Control Room Shift Turnover Checklist]

Admin JPM B SRO [Determine Shift Staffing]

Admin JPM B SRO [Determine Shift Staffing]

Admin JPM C RO [Daily Jet Pump Operability Check Test 01 331 Comment 1) On page 4, need to more specifically identify the Task Standard (e.g., Perform Operator Aid for Bulk Drywell Temperature Manual Calculation").

2) Editorial:

On page 5, in Step 3, put in the Closed parentheses after "23.1 4." 1) On page 4, need to more specifically identify the Task Standard.

2) Editorial:

On page 10, in the Terminating Cue, change "is been completed" to "has been completed." 1) On page 5, step 3, in the "Standard", change to 2) Change step 14 to have the Low Flow FW Reg Valve properly in MANUAL (instead of incorrectly in AUTO. This step then becomes a non-critical step. 3) Add new steps 23 and 24, such that step 24 has HPCl incorrectly in MANUAL, instead of in AUT, with this step being a Critical Step. [Comments during onsite validation]

1765 - 1775 MWT. 1) On page 3, in the Initial Conditions, need to identify which "Rose" is on shift (i.e., M. Rose or H. Rose). 2) Change JPM set up such that can not meet at least one requirement.

[This JPM was initially Unsatisfactory due to Comment #2 above] 1) On pages 2 and 7, in the Initial Conditions, add the names of the Shift Chemist and the Shift Rad Protection Specialist.

2) On pages 2 and 7, in the Initiating Cues, state to provide a roster with the appropriate names. [Comments during onsite validation]

The expected readings for this JPM are shown in RED. However, how would one determine that a reading is unacceptable (i.e., a Critical Step failure).

~ Resolution Comments incorporated.

Comments incorporated. Comments incorporated.

~ 1) Changed the names of the Operators to reference fictitious names instead of real names. 2) JPM changed such that can not meet shift staffing requirements for a Toxic Gas event. Comments incorporated. Acceptable ranges were added to the JPM for the readings taken.

MONTICELLO FEBRUARY 2007 INITIAL LICENSE EXAM OPERATING EXAM COMMENTS 10 # Source [Review Daily Jet Pump Operability Check Test 01331 Admin JPM D RO and SRO 7 Admin JPM C RO [Daily Jet Pump Operability Check Test 01 331 l8 - 9 Admin JPM C SRO [Review Daily Jet Pump Operability Check Test 01 331 Admin JPM C SRO - 11 Admin JPM D RO and SRO [High Radiation Area Entry] 1) On page 8, step 14, change such that these readings are already marked in on the surveillance sheet. Also, change this step to a non- critical step. 2) On page IO, step 17, change this to be a non- critical step, with an asterisk to say that the step is Critical if step 16.e is calculated to not meet the Acceptance Criteria. [Comments during onsite validation]

1) On page 4, need to more specifically identify the Task Standard.
2) On page 3, change the Initiating Cue to : "Review for satisfactory completion the provided

..." 1) On page 1, change the 'Time for Completion" from 15 minutes to 25 minutes. 2) On page 4, step 1, add "x103" to the values for Recirc Loop Flow. 3) On page 5, step 3, change the "Values" for the "Variables" G thru N to reflect less significant digits. [Comments during onsite validation]

1 ) On page 4, need to more specifically identify the Task Standard.

2) On pages 3 and 8 in the Initiating Cues, delete "[State Operator's Name]." 3) On page 5, step 2, it states: "Determines neither condition applies as the entry is for a high radiation area." However, the attached RWP states that the area is a LHRA. 4) On page 6, step 4, where does it state the proper method to read the RWP (i.e., that 2200*/1200 means 1200 mredhr at the valve). If the '2200*" means that there is a hot spot of 2200 mrem/hr at the valve, where would it state that it would be incorrect to conservatively use 2200 mrem/hr for the calculation of a dose? On pages 3 and 8, change the Initiating Cues to reference section 4.4.2 of the procedure. [Comment during onsite validation]

~~~ Resol ut ion 1) Comment incorporated.

2) Comment incorporated. Comments incorporated.

Comments incorporated. 1) Comment incorporated.

2) Comment incorporated.
3) The statement was deleted. 4) The 2200" was deleted from the RWP. ~~ Comment incorporated.

- # 12 - - 13 14 16 MONTICELLO FEBRUARY 2007 INITIAL LICENSE EXAM OPERATING EXAM COMMENTS Source Admin JPM E SRO [Protective Action Recommendation] ~~~ ~~ Admin JPM E SRO [Protective Action Recommendation] JPM A Simulator

[Perform the Reactor Scram Functional Test 0010 / Rod Drift I Scram] ~ JPM A Simulator

[Perform the Reactor Scram Functional Test 001 0 / Rod Drift / Scram] JPM B Simulator

[Reactor Feed Pumps Cold Startup] JPM B Simulator [Reactor Feed Pumps Cold Startup] Comment 1) On page 4, need to more specifically identify the Task Standard.

2) On pages 3 and 7, in the Initiating Cues, need to state: 'This JPM is Time Critical?"
3) Change 12 minutes to 15 minutes for the time allowed to complete the JPM. 4) To make it easier to grade the JPM, would like to have an Answer Key sheet for form 5790-102-02.

~ ~ On the Answer Key sheet, make the following changes: - Box 7 - circle B (Not a Critical Step) - Box 9 - circle E (Not a Critical Step) - BOX 10 - circle B instead of C (Critical Step) [Comments during onsite validation] 1) On page 4, need to more specifically identify the Task Standard.

2) Typo: On page 7, step 10, change "on" to "one." ~~ ~ 1) On page 6, step 8, add an Evaluator Cue that states that the computer point is reset. 2) On page 10, add to the Simulator Set Up to provide 4 keys for the performance of the JPM. [Comments during onsite validation]
1) On page 4, need to more specifically identify the Task Standard.
2) On pages 3 and 10, add to Initiating Cues that an out plant operator is available to support evolutions required to be performed locally in the plant.

On page 11, add to the Simulator Set Up to place the Low Flow RN Reg Valve in AUTO. [Comment during onsite validation]

Resolution ~ ~ ~ 1 ) Comment incorporated.

2) Comment incorporated.
3) Comment incorporated.
4) Answer Key sheet provided for Evaluator.

Comment incorporated.

Comments incorporated. Comments incorporated.

Comments incorporated.

Comment incorporated.

- # - 18 19 20 MONTICELLO FEBRUARY 2007 INITIAL LICENSE EXAM OPERATING EXAM COMMENTS Source JPM C Simulator

[Perform SRV Operability and Position Indication Check IAW Test 01 121 JPM C Simulator

[Perform SRV Operability and Position Indication Check IAW Test 01 121 JPM D Simulator [Manual Initiation of RClC] JPM E Simulator

[Drywell to Suppression Chamber Vacuum Breaker Leakage Operational Check] Comment ~~~~~~~~ 1) On page 4, need to more specifically identify the Task Standard.

2) Typo: On page 4, in Task Standard, change "RELIEVE TO "RELIEF."
3) On page 8, step 13, in the Standard, it should state that the "red indicating light is ON instead of the "green indicating light is ON". 4) On page 12, the 4" bullet in the Initiating Cue should be re-worded to say: A marked-up copy of Test No. 112 is provided.

Also, this bullet is not shown on page 3, and should be added to page 3. 1) On pages 3 and 12, change the "Initial Conditions" to state that the reactor is at approximately 2% power. 2) On page 7, step 8, delete mention of verifying the amber light on local panel S21 (C-292).

3) On page 18, delete step 18, to refer to procedure to verify that the immediate operator actions are complete.

[Comments during onsite validation]

On page 4, need to more specifically identify the Task Standard (i.e., take manual control of RClC speed, etc.) 1) On page 4, need to more specifically identify the Task Standard.

2) On pages 3 and 14, add to Initiating Cues that an out plant operator is available to support evolutions required to be performed locally in the plant. 3) On page 4, step 1 .a should be a Critical Step, since this local action required to perform the task. 4) On page 11, step 20, under Evaluator Cue, change to "When containment pressure is 0.5 psig lor at discretion of Evaluator), ..." Resolution

~ ~ Comments incorporated. Comments incorporated.

Comment incorporated.

Comments incorporated.

MONTICELLO FEBRUARY 2007 INITIAL LICENSE EXAM OPERATING EXAM COMMENTS Source JPM E Simulator

[Drywell to Suppression Chamber Vacuum Breaker Leakage Operational Check] JPM F Simulator [Manually Start No. 11 EDG (Control Room Actions)]

JPM F Simulator [Manually Start No. 11 EDG (Control Room Actions)]

JPM G Simulator [Perform the Service Water Effluent Monitor Functional Test] Comment 1) On page 7, step 8, change to a Critical Step, with the Critical Step being to inform the CRS of the test failure. Change the Evaluator Cue to state that, if informed of the test failure, to direct performing test 0213. 2) In step 19, change the "Standard" to recognize the need to have SBGT placed in service. Add to the Evaluator Cue to state that another operator will place SBGT Train A in service, and that when the Simulator Booth operator informs the examiner that SBGT is in service, to then inform the candidate that SBGT is in service. 3) Onpage 1 1, step 21, add an Evaluator Cue that the DP indicator reads 0.2 psid, which may be different than the panel indicator.

4) On page 13, step 24, change the Evaluator Cue such that when 2 sets of data have been recorded to say that the JPM is complete.
5) On page 15, in thew Simulator Set Up, state to place the Vacuum Breaker Selector Switch to any position except A. [Comments during onsite validation]

On pages 3 and 14, in the Initiating Cues, delete "[State Operator's Name]." 1) On page 7, step 7, have the Simulator Booth Operator insert speed droop for the EDG only if the local operator has requested the speed droop to be placed in. 2) On page 8, step 11, add an Evaluator Cue that the Sync switch on Panel (3-313 is in the OFF position.

3) On page 15, in the Simulator Set Up, delete mention of the Speed Droop being placed in on the #11 EDG. Change IC-237 to re-shoot with the Speed Droop removed. [Comments during onsite validation]

On page 4, need to more specifically identify the Task Standard.

Resolution Comments incorporated. Comment incorporated. Comments incorporated.

Comment incorporated.

MONTICELLO FEBRUARY 2007 INITIAL LICENSE EXAM OPERATING EXAM COMMENTS Source JPM G Simulator

[Perform the Service Water Effluent Monitor Functional Test] JPM H Simulator

[Restore SBGT to a Normal Standby Lineup] JPM H Simulator

[Restore SBGT to a Normal Standby Lineup] JPM I In-Plant RO and SRO(I) [Transfer EDG Cooling from Service Water] EDG-ESW to Comment 1) On page 5, step 2, change to specify that verifying the computer point has typed out is not a Critical Step. Also, add a NOTE to the Evaluator Cue that the printer is not modeled on the simulator.

2) On page 7, step 8, change to specify that verifying the computer point has typed out is not a Critical Step. Also, add a NOTE to the Evaluator Cue that the printer is not modeled on the simulator.
3) On page 8, step1 1, add a NOTE to the Evaluator Cue that the printer is not modeled on the simulator. [Comments during onsite validation] 1) On page 7, step 7, change "b)"

to "d)". 2) On page 7, step 7, under Standard, add at the end: "Notifies Shift Supervision to exit Tech Spec 3.6.4.3 Condition A." 3) On page 14, delete the 2"d bullet in the Initiating Cues (NOTE: This cue is not shown on Paae 3). 1) On page 7, step 7, change the "Standard to reference steps 9 thru 14 instead of steps 9 thru 16. Also, add a NOTE to the Evaluator Cue that states that JPM steps 9-14 may be completed before JPM steps 7 and 8. 2) On page 9, step 13, change the Evaluator Cue to reference fan V-AC-1OB instead of fan V-AC-1OAB.

Also, add a NOTE that fan V-EF-10 may be requested to be started at this time.

3) Make step 14 the last step of the JPM(i.e., delete steps 15-21), with an Evaluator Cue that another Operator will be assigned to complete the procedure. [Comments during onsite validation] 1) On pages 3 and 7, add to Initiating Cue: 'This JPM is Time Critical."
2) On page 5, step 5, add a space to record Critical Start Time. 3) What is the basis for the 10 minute Critical Time? 4) On page 6, step 6, add a space to record Critical Stop Time. Resolution Comments incorporated.

~~ Comments incorporated.

Comments incorporated. Comments incorporated.

.- MONTICELLO FEBRUARY 2007 INITIAL LICENSE EXAM OPERATING EXAM COMMENTS Source JPM I In-Plant RO and SRO(I) [Transfer EDG Cooling from Service Water]

EDG-ESW to JPM I In-Plant SRO(U) [No. 11 EDG Operation Without Division 1 Battery] JPM I In-Plant SRO(U) [No. 11 EDG Operation Without Division 1 Battery] JPM K In-Plant [Startup of Air Driven Compressors for Main Air Supply to Outboard MSIVs] JPM K In-Plant [Depressurize the Scram Air Header Locally Per C.5-3101, Part B] Comment On page 4, step 2, change to a non Critical Step, since the step is only a verification step. [Comment during onsite validation]

On page 7, step 9, in the Standard, change to " ... an operator is rewired to be stationed

..." 1) On page 7, step 11, add to the Evaluator Cue, that if asked about barring and/or draining the air box, that time does not allow.

Also, in the Evaluator Cue, delete "EDG RPM is rising" (since there is no RPM meter to observe), and replace with 'You can hear the engine start." 2) On page 8, step 12, change the Evaluator Cue from "49 psig" to "50 psig", since the pressure gage is only in 5 psi increments.

3) On page 8, step 15, change this step to be a Critical Step. Also, add to the "standard" that the candidate may elect to locally close the breaker. [Comments during onsite validation]

On page 4, step 2, add to the Evaluator Cue that one hears noise coming from the compressor.

[Comment during onsite validation]

1) On page 4, need to more specifically identify the Task Standard.
2) Typo: On page 5, step 3, change "scam" to "scram." Resolution Comment incorporated.

Comment incorporated.

~ Comments incorporated.

Comment incorporated.

Comments incorporated.

MONTICELLO FEBRUARY 2007 INITIAL LICENSE EXAM OPERATING EXAM COMMENTS - # 35 - 37 39 41 - 42 Source ES-PI form for Scenario # NRC-01 ES-D-1 form for Scenario # NRC-01 Scenario # NRC-01 Page 5 Scenario # Event 3 Page 12 NRC-01 Scenario # Event 6 Page 15 NRC-01 Scenario # Event 6 Page 16 NRC-01 Scenario # NRC-01 Event 7 Page 18 Scenario # Simulator Input Summary Page 20 NRC-01 Comment For Event 7, change from "Recirc line break to "Steam line break," since a recirc line break failed to give a drywell temperature high enough to require an Emergency Depressurization. [Comment during onsite validation] [This event was initially Unsatisfactory due to Com ment above] Change the form to recognize an Event 8 of the "Failure of 1 ADS SRV to open." [Comment during onsite validation] For Event 7, change from "Recirc line break to "Steam line break." [Comment during onsite validation]

Add "Function 4.b and "within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />" after Table 3.3.5.1 -1. [Comment during onsite validation] Typo: In step 9.b, change the word "lose' to "loose." Editorial:

In step 9.b, change the word "recommend to "recommends."

Reference performing placing the first and second FRVs in Automatic per 6.05.07-05.

[Comment during onsite validation]

1) Reference placing torus sprays in service (instead of torus cooling) per C.5-3502.
2) State why Division 2 of torus sprays will not be available. 3) State why Division 1 and Division 2 of drywell sprays will not be available.

[Comments during onsite validation] Make changes to reference a Recirc line break instead of a Steam line break. [Comment during onsite validation]

Resolution Comment incorporated Comment incorporated.

Comment incorporated.

Comment incorporated.

Comment incorporated.

Comment incorporated. Comments incorporated.

Comment incorporated.

- # 43 - 44 45 46 40 49 - MONTICELLO FEBRUARY 2007 INITIAL LICENSE EXAM OPERATING EXAM COMMENTS Source ES-P1 form for Scenario # NRC-02 ES-D-1 form for Scenario # NRC-02 Scenario # NRC-02 Malfunctions Page 3 Scenario # NRC-02 Page 5 Scenario # Event 3 Page 11 NRC-OP Scenario # Event 5 (New Event

6) Page 13 NRC-02 Scenario # NRC-02 Event 6 (New Event
7) Page 15 Comment Typo: For Event 3, under Event Description, change "MRP" to "MPR". Add a new Event 5 for a 11 Steam Packing Exhauster trip (to ensure that the BOP will have the required number of events to address) and renumber remaining events.

[Comment during onsite validation]

[The previous Event 5 (current Event

6) was initially Unsatisfactory due to Comment above, since it could not be assured that the BOP would receive credit for actions performed during a 12 Recirc Pump Trip]

Add a new Malfunction 4 for a 11 Steam Packing Exhauster trip and renumber remaining malfunctions [Comment during onsite validation]

1) For Event 3, change the Tech Spec references to LCO 3.2.1, 3.2.2, and 3.3.3. 2) Add a new Event 5 for a Gland Steam Exhauster trip and renumber remaining events.
3) For Event 5 (new Event 6), change the Tech Spec references to LCO 2.1.1 , 3.4.1, and 3.3.1.1, [Comments during onsite validation]
1) Add a statement that procedure C.4-B.05.09.A may be entered to place the EPR 00s. 2) Change the Tech Spec references to LCO 3.2.1, 3.2.2, and 3.3.3. [Comments during onsite validation] Change the Tech Spec references to LCO 2.1.1, 3.4.1 RA B.l, and 3.3.1.1 Function 2.a. [Comment during onsite validation]

Add a statement that when SBLC Tank level is s 1040 gallons, then direct RPV water level be restored to 9 - 48 inches. [Comment during onsite validation]

Resolution Comment incorporated. Comment incorporated.

Comment incorporated.

Comments incorporated. Comments incorporated.

Comment incorporated.

Comment incorporated.

MONTICELLO FEBRUARY 2007 INITIAL LICENSE EXAM OPERATING EXAM COMMENTS

  1. Source I - 51 Scenario # Event 6 (New Event 7) Page 16 Scenario # Simulator Input Summary Page 17 NRC-02 NRC-02 52 Scenario # NRC-03 Event 4 Page 11 53 Scenario ## Event 6 NRC-03 Page 13 L Comment 1) Delete statement that Division 2 Torus Cooling will not be able to be initiated.
2) Revise to place the proper sequence of steps to establish torus cooling. [Comments during onsite validation] Change the "Severity or Value" of Malfunction TC05A from 25 to 40. [Comment during onsite validation] Change the Tech Spec reference to LCO 3.3.1.1 [Comment during onsite validation]
1) In the "Expected Students Responses", add "and HOLD when depressing the HPCl TURBINE TRIP pushbutton.
2) In the "Expected Students Responses", add another bullet to release the HPCl TURBINE TRIP pushbutton. [Comments during onsite validation]

Resolution Comments incorporated.

Comment incorporated.

Comment incorporated.

Comments incorporated.