Letter Sequence Withholding Request Acceptance |
---|
|
|
MONTHYEARML0714103002007-05-16016 May 2007 Submittal of Stress Evaluation, Preliminary Engineering Evaluation of Insurge/Outsurge Tranients and Examination Results for the Completed Alloy 600 Pressurizer Nozzle Alternative Weld Repair CMP-023R1 Project stage: Request ML0717205282007-05-24024 May 2007 Use of Weld Overlays (TAC Nos. MD3903/3904) Project stage: Other ML0717002682007-06-15015 June 2007 Response to Request for Additional Information on 05/24/2007 Weld Overlays as an Alternative Repair Technique Project stage: Response to RAI ML0715000152007-06-26026 June 2007 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML0720703562007-07-25025 July 2007 CMP-022R1 and Unit 2, CMP-023R1, Response to Request for Additional Information Weld Overlays as an Alternative Repair Technique Project stage: Response to RAI ML0727500642007-10-0101 October 2007 Relief Request CMP-022R1 Revised Non-Destructive Examination Requirements for the 'A' Safety Valve Pressurizer Nozzle Using Weld Overlay as an Alternative Repair Technique Project stage: Request ML0722202282007-12-19019 December 2007 Relief Requests CMP-022 and CMP-023 Regarding Use of Weld Overlays as an Alternative Repair Technique Project stage: Other 2007-05-24
[Table View] |
|
---|
Category:Letter
MONTHYEARML24032A1112024-02-0101 February 2024 Owner'S Activity Report for North Anna, Unit 2, Refueling Outage N2R29 - First Period of the Fifth ISI Interval ML24032A4662024-01-16016 January 2024 Response to Comments on Draft Vpdes Permit No. VA0052451 ML24017A0802024-01-11011 January 2024 Notification of Licensed Operator Initial Examination 05000338/2024301 and 05000339/2024301 ML24003A8372024-01-0909 January 2024 Letter to Elizabeth Toombs, Thpo, Cherokee Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8412024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8502024-01-0909 January 2024 Letter to Wenonah Haire, Thpo, Catawba Indian Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A7272024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8382024-01-0909 January 2024 Letter to G. Anne Richardson, Chief, Rappahannock Tribe, Inc., Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8482024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8392024-01-0909 January 2024 Letter to Gerald Stewart, Chief, Chickahominy Indian Tribe, Eastern Division Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8472024-01-0909 January 2024 Letter to Tom Jonathan, Chief, Tuscarora Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8492024-01-0909 January 2024 Letter to W. Frank Adams, Chief, Upper Mattaponi Tribe Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8462024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8352024-01-0909 January 2024 Letter to Acee Watt, Thpo, United Keetoowah Band of Cherokee Indians in Oklahoma Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8422024-01-0909 January 2024 Letter to Paul Barton, Thpo, Eastern Shawnee Tribe of Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8432024-01-0909 January 2024 Letter to Robert Gray, Chief, Pamunkey Indian Tribe, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8362024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8442024-01-0909 January 2024 Letter to Russell Townsend, Thpo, Eastern Band of Cherokee Indians ML24003A8402024-01-0909 January 2024 Letter to Katelyn Lucas, Thpo, Delaware Nation, Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8452024-01-0909 January 2024 Letter to Stephen Adkins, Chief, Chickahominy Indian Tribe, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML23332A1852024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A0872024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23360A6352024-01-0404 January 2024 Letter to Dominion Availability for North Anna Units 1 and 2 Draft Site Specific Environmental Impact Statement ML23332A1472023-12-21021 December 2023 Issuance of Environmental Scoping Summary Report Associated with the Staff'S Review of the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23346A0972023-12-11011 December 2023 License Amendment Request to Revise the Emergency Plan Relocation of the Technical Support Center - Response to NRC Request for Additional Information ML23346A1022023-12-11011 December 2023 2024 North Anna Power Station Brq Inspection Notification Letter ML24012A0942023-12-0707 December 2023 GL Report from Dominion Virginia Power Regarding Transfer of Devices ML24012A0892023-12-0707 December 2023 GL Registration from Dominion Virginia Power ML23334A2432023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23362A0602023-11-29029 November 2023 ISFSI, Submittal of Cask Registration for Spent Fuel Storage IR 05000339/20234022023-11-27027 November 2023 Security Baseline Inspection Report 05000338 and 05000339/2023402 IR 05000338/20230032023-11-13013 November 2023 Integrated Inspection Report 05000338/2023003 and 05000339/2023003 ML23311A2042023-10-0909 October 2023 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.d IR 05000338/20234032023-10-0505 October 2023 Reissue - North Anna Power Station - Cyber Security Inspection Report 05000338/2023403 and 05000339/2023403 (Cover Letter) ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23275A0992023-09-28028 September 2023 Subsequent License Renewal Application Third 10 CFR 54.21(b) Annual Amendment IR 05000338/20230112023-09-26026 September 2023 Quadrennial Focused Engineering Inspection Commercial Grade Dedication Report 05000338/2023011 and 05000339/2023011 ML23242A3482023-09-11011 September 2023 Cyber Security Inspection Report 05000338/2023403 and 05000339/2023403 - Cover ML23254A0242023-09-0606 September 2023 Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23249A2592023-09-0606 September 2023 Core Operating Limits Report Cycle 30, Pattern Ukr, Revision 0 ML23214A2022023-09-0505 September 2023 Staff Assessment of Updated Seismic Hazards Following the NRC Process for the Ongoing Assessment of Natural Hazards Information 2024-02-01
[Table view] Category:Proprietary Information Review
MONTHYEARML23101A0422023-05-0303 May 2023 Request for Withholding Information from Public Disclosure for North Anna Power Station Units 1 & 2, Surry Units 1 & 2 and Millstone Units 2 & 3, Request for Withholding, Appendix F of Fleet Report DOM-NAF-2-P ML22355A1832023-03-0101 March 2023 Request for Withholding Information from Public Disclosure for North Anna Station, Units 1 & 2, Surry Station, Units 1 & 2, and Millstone Station, Units 2 & 3 - Request for Withholding Appendix F of Fleet Report DOM-NAF-2 ML22335A4142022-12-21021 December 2022 Request for Withholding Information from Public Disclosure for Dominion Fleet Response to Request for Additional Information Regarding NRC Generic Letter 2004-02 ML21148A1502021-06-0808 June 2021 Request for Withholding Information from Public Disclosure for North Anna Power Station, Units 1 & 2, Surry Power Station, Units 1 & 2, and Millstone Power Station, Units 2 & 3, Request for Withholding Response to NRC Request for Additional ML21097A0272021-04-14014 April 2021 Request for Withholding from Public Disclosure Regarding Subsequent License Renewal Application ML21075A2592021-03-18018 March 2021 Request for Withholding Information from Public Disclosure for North Anna Power Station, Units 1 and 2, Surry Power Station, Units 1 and 2, and Millstone Power Station, Units 2 and 3, Request for Withholding, Appendix E of Fleet Report Dom- ML20178A3212020-07-16016 July 2020 Request for Withholding Information from Public Disclosure for North Anna Power Station, Unit 1, Proposed Inservice Inspection Interval Alternative N1 I5 NDE-002 ML19043A7452019-02-14014 February 2019 Request for Withholding Information from Public Disclosure for North Anna Power Station, Unit 2, Related to Inservice Inspection Alternative Request N2-I4-NDE-007 ML18024A2732018-01-24024 January 2018 Letter to D. G. Stoddard U.S. NRC Approval of Virginia Electric and Power Company Request for Withholding Information from Public Disclosure for North Anna Power Station ISFSI (Cac/Epid Nos. 001028/L-2017-RNW-0010 and 000993/L-2017-LNE-0008 ML13053A3612013-03-0707 March 2013 Request for Withholding Information from Public Disclosure for DNC, DEK, Virginia Kewaunee Unit 1, Millstone Power Station, Units 1, 2 & 3, North Anna Units 1 & 2, Surry Units 1 & 2 Information Pertaining to Foreign Interests ML13051A9652013-02-26026 February 2013 Request for Withholding Information from Public Disclosure ML12172A0532012-06-26026 June 2012 Request for Withholding Information from Public Disclosure ML1025601852010-09-28028 September 2010 ME4600 (Dominion Fleet) Proprietary Determination Ltr 2010-09-13 ML0934504082009-12-23023 December 2009 Millstone Power Station, Units 2 & 3, North Anna Power Station, Units 1 &2, Surry Power Station Units 1 & 2 - Withholding of Information Determined to Be Proprietary ML0913207042009-06-0909 June 2009 Request for Withholding Information from Public Disclosure for North Anna Power Station, Units 1 & 2 Regarding Measurement Uncertainty Recapture Power Uprate - Cameron Supporting Documents (TAC ME0965 & ME0966) ML0732400982007-11-29029 November 2007 Request for Withholding Information from Public for Surry Power Station, Units 1 and 2, North Anna Power Station, Units 1 and 2, and Millstone Power Station and Kewaunee Power Station (TAC Nos. MD6144, MD6145, MD6146, MD6147, MD6148, MD6149 ML0715000152007-06-26026 June 2007 Request for Withholding Information from Public Disclosure ML0621903542006-08-0707 August 2006 Withholding Information from Public Disclosure. ML0618004712006-07-18018 July 2006 Units 2 & 3, Withholding from Public Disclosure, CD-ROM Containing Electronic Gothic Input & Output Files from Benchmark Cases in Sections 4.3, 4.4, 4.5, & 4.6 of TR DOM-NAF-3, Gothic Methodology for Analyzing. ML0316204982003-06-11011 June 2003 Framatome Anp Request for Withholding Information from Public Disclosure ML0316106732003-06-10010 June 2003 Withholding from Public Disclosure, Document Response to Request for Additional Information and Revised Pages for March 2002 Evaluation Report - Framatome Fuel Transition Program Technical Specification Change ML0302402942003-01-24024 January 2003 Withholding from Public Disclosure, Equipment Specifications 676413, Rev. 1, General Reactor Vessel Specification & 953069, Rev. 0, Addendum to Equipment Specification 676433, Rev. 1 ML0235801542002-12-24024 December 2002 Request for Withholding Information from Public Disclosure, TAC Nos. MB5435, MB5436, MB5433, MB5434 ML0213606382002-05-13013 May 2002 Request for Withholding Information from Public Disclosure by Letter Dated 02/11/2002 2023-05-03
[Table view] |
Text
June 26, 2007Mr. David A. ChristianSenior Vice President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
SUBJECT:
NORTH ANNA POWER STATION, UNIT NOS. 1 AND 2, REQUEST FORWITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (TAC NOS.
MD3903 AND MD3904)
Dear Mr. Christian:
By letter dated May 16, 2007, and affidavit dated May 2, 2007, executed by Ms. Gale F. Elliottof AREVA NP Inc., you requested that the information contained in the following documents associated with relief request CMP-023, Revision 1 for North Anna Power Station, Unit No. 2, be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations(10 CFR), Part 2, Section 2.390:*Document Identifier 32-9038239-000, "North Anna Units 1 & 2, Pressurizer SurgeNozzle Weld Overlay Analysis," dated February 2007.*Document Identifier 32-9038441-001, "North Anna Units 1 & 2 Pressurizer Safety/ReliefNozzle Weld Overlay Analysis," dated March 2007.*Document Identifier 32-9035736-001, "North Anna Units 1 & 2 Pressurizer-Spray NozzleWeld Overlay Analysis," dated March 2007.*Document Identifier 32-9035736-002, "North Anna Units 1 & 2 Pressurizer-Spray NozzleWeld Overlay Analysis," dated April 2007.*Document Identifier 32-9043013-000, "North Anna Units 1 & 2 PZR Safety/Relief NozzleWeld Overlay Crack Growth Evaluation," dated March 2007.*Document Identifier 32-9043015-000, "North Anna Units 1 & 2 PZR Spray Nozzle WeldOverlay Crack Growth Evaluation," dated March 2007.*Document Identifier 32-9042735-000, "North Anna Units 1 & 2 PZR Surge Nozzle WeldOverlay Crack Growth Evaluation," dated March 2007.*Document Identifier 32-9038670-001, "North Anna Units 1 & 2 Weld Overlay - PipingEvaluation," dated March 2007.*Document Identifier 32-9045275-001, "North Anna Units 1 & 2, Pressurizer SurgeNozzle Weld Overlay Engineering Evaluation of Insurge/Outsurge Transients," dated April 2007.A nonproprietary copy of these documents has been placed in the Nuclear RegulatoryCommission's (NRC's) Public Document Room and added to the Agencywide Documents Access and Management System Public Electronic Reading Room.The affidavit stated that the submitted information should be considered exempt frommandatory public disclosure for the following reasons:
D. Christian-2-(a)Use of the information by a competitor would permit the competitor tosignificantly reduce its expenditures, in time or resources, to design, produce, or market a similar product or service.(b)The information includes test data or analytical techniques concerning aprocess, methodology, or component, the application of which results in a competitive advantage for AREVA NP.We have reviewed your application and the material in accordance with the requirements of10 CFR 2.390 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. Therefore, the version(s) of the submitted information marked as proprietary will be withheldfrom public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.Withholding from public inspection shall not affect the right, if any, of persons properly anddirectly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.If the basis for withholding this information from public inspection should change in the futuresuch that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.If you have any questions regarding this matter, I may be reached at 301-415-1564. Sincerely,/RA/Siva P. Lingam , Project ManagerPlant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket Nos. 50-338 and 50-339 cc: See next page
D. Christian-2-June 26, 2007(a)Use of the information by a competitor would permit the competitor tosignificantly reduce its expenditures, in time or resources, to design, produce, or market a similar product or service.(b)The information includes test data or analytical techniques concerning aprocess, methodology, or component, the application of which results in a competitive advantage for AREVA NP.We have reviewed your application and the material in accordance with the requirements of10 CFR 2.390 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. Therefore, the version(s) of the submitted information marked as proprietary will be withheldfrom public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.Withholding from public inspection shall not affect the right, if any, of persons properly anddirectly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.If the basis for withholding this information from public inspection should change in the futuresuch that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.If you have any questions regarding this matter, I may be reached at 301-415-1564. Sincerely,/RA/Siva P. Lingam , Project ManagerPlant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket Nos. 50-338 and 50-339 cc: See next pageDISTRIBUTION:
PUBLICRidsRgn2MailCenter(EGuthrie)
LPL2-1 RdgRidsNrrPMSLingam (hard copy)
RidsNrrDorlLpl2-1(EMarinos)RidsNrrLAMO'Brien (hard copy)
RidsOgcMailCenterRidsAcrsAcnwMailCenter RidsNrrCpnb(TChan)ADAMS Accession No: ML071500015NRR084OFFICELPL2-1/PMLPL2-1/LA NRR/CPNB/BCLPL2-1/BCNAMESLingamMO'BrienTChanEMarinosDATE 05 / 29 /0706 / 25 /0706 / 25 /0706 / 26 /07OFFICIAL AGENCY RECORD D. Christian North Anna Power Station, Units 1 & 2 cc:
Mr. David A. ChristianSenior Vice President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrooks Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711Mr. C. Lee LintecumCounty Administrator Louisa County Post Office Box 160 Louisa, Virginia 23093Ms. Lillian M. Cuoco, Esq.Senior Counsel Dominion Resources Services, Inc.
Building 475, 5 th floorRope Ferry Road Waterford, Connecticut 06385Dr. W. T. LoughVirginia State Corporation Commission Division of Energy Regulation Post Office Box 1197 Richmond, Virginia 23218Old Dominion Electric Cooperative4201 Dominion Blvd.
Glen Allen, Virginia 23060Mr. Chris L. Funderburk, DirectorNuclear Licensing & Operations Support Dominion Resources Services, Inc.
Innsbrook Technical Center 5000 Dominion Blvd.
Glen Allen, Virginia 23060-6711Office of the Attorney GeneralCommonwealth of Virginia 900 East Main Street Richmond, Virginia 23219Senior Resident InspectorNorth Anna Power Station U. S. Nuclear Regulatory Commission P. O. Box 490 Mineral, Virginia 23117Mr. Daniel G. StoddardSite Vice President North Anna Power Station Virginia Electric and Power Company Post Office Box 402 Mineral, Virginia 23117-0402Dr. Robert B. Stroube, MD, MPHState Health Commissioner Office of the Commissioner Virginia Department of Health Post Office Box 2448 Richmond, Virginia 23218Ms. Gayle F. Elliott, ManagerProduct Licensing AREVA NP Inc.
3315 Old Forge Road Lynchburg, Virginia 24501