ML103130472

From kanterella
Revision as of 02:37, 19 September 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Kewaunee Power Station, Supplemental Information for the Review of the Kewaunee Power Station License Renewal Application
ML103130472
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 11/09/2010
From: Price J A
Dominion Energy Kewaunee
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
10-665
Download: ML103130472 (6)


Text

Do min ion EnergyKewaunee, Inc.5000 Dominion Boulevard,GlenAllen,VA23060 DominionNovember 9, 2010UnitedStates Nuclear Regulatory Commission Attention:

DocumentControlDeskWashington,DC20555-0001SerialNo.: LR/MWH Docket No.:LicenseNo.:

10-665 RO 50-305 DPR-43 DOMINION ENERGYKEWAUNEE,INC.KEWAUNEEPOWERSTATION SUPPLEMENTAL INFORMATIONFORTHEREVIEWOFTHEKEWAUNEEPOWERSTATIONLICENSERENEWALAPPLICATIONDuringa telephone conferenceheldon Thursday , November 5 ,2010,membersoftheNRCandDominionEnergyKewaunee,Inc

.(DEK)staffsdiscussedthelicenserenewal commitment43to inspectASMEClass1 small-bore piping socketweldsinsupporttheKewauneePowerStation(KPS)licenserenewalapplication(LRA)(reference1).Asaresultofthe conferencecall,DEKis supplementingitsresponsetoRAI82.1.2-2,whichwassubmittedtotheNRCinReference2

.Attachment1tothisletterprovidesthe supplementalresponsetoRAI82.1.2-2.Shouldyouhaveanyquestionsregardingthissubmittal,pleasecontactMr.PaulC

.Aitkenat(804)273

-2818.Verytrulyyours, J.ViCOMMONWEALTHOF VIRGINIACOUNTYOFHENRICO GINGER LYNN MELTON Notary Public Commonwealth of Virginia 310847 My Commlilion expires Apr 30.2013.-..-.------------------.---MyCommissionExp ires:_----'--'----'---=-

_Theforegoingdocumentwasacknowledgedbeforeme,inandfortheCountyandStateaforesaid,today by J.AlanPrice ,whoisVicePresident-NuclearEngineeringofDominionEnergyKewaunee,Inc

.HehasaffirmedbeforemethatheisdulyauthorizedtoexecuteandfiletheforegoingdocumentinbehalfofthatCompany

,andthatthestatementsinthedocumentaretruetothebestofhisknowledgeandbelief

.Acknowledgedbeforemethis c,-WLdayof

,2010.\.:d o\'U+/-fCotaryPublic

r d-l cs,\\"G,{\

Y>f ro+o.v'j Q:b.U--""'-

SerialNo.10-665DocketNo.50-305Page2of3

Attachment:

1.SupplementalResponsetoRAI82.1

.2-2 References

1.LetterfromD.

A.Christian(DEK)toNRC,"KewauneePowerStationApplicationforRenewed OperatingLicense,"dated August12,2008.[ADAMSAccessionNo

.ML082341020]2.Letterfrom L.N.Hartz(DEK)toNRC,"ResponsetoRequestforAdditionalInformationfortheReviewoftheKewauneePowerStationLicenseRenewal Application," dated September 23 ,2010.[ADAMS AccessionNo.ML102700162]

Commitmentsmadeinthisletter:1.LicenseRenewal Commitment43willberevised consistentwiththesupplementalresponsetoRAI82.1.2-2.Therevised commitmentisproposedtosupportapprovaloftherenewedoperatinglicense

,andmay changeduringtheNRCreviewperiod

.

cc:U.S.Nuclear Regulatory Commission Regional Administrator

, Region III 2443 Warrenville RoadSuite210 Lisle , IL 60532-4532Mr.K.D.Feintuch, Senior Project Manager U.S.Nuclear Regulatory Commission One White Flint ,MailStop 08-H4A 11555 Rockville PikeRockville,MD 20852-2738Mr.DanielDoyle Environmental Project Manager U.S.Nuclear Regulatory Commission

.MailStop 0-11 F1 Washington

,DC20555-0001Mr.JohnDailyLicenseRenewalProject Manager U.S.Nuclear Regulatory CommissionMailStop 0-11 F1 Washington

,DC20555-0001 NRC Senior Resident Inspector Kewaunee Power Station N490 Highway 42 Kewaunee ,WI54216 Public Service Commission of WisconsinElectricDivision P.O.Box7854Madison,WI53707 David Hardtke Chairman-TownofCarlton E2334 Lakeshore Road Kewaunee ,WI54216SerialNo.10-665DocketNo.50-305Page3of3 SerialNo.10-665 DocketNo.50-305 ATTACHMENT 1 SUPPLEMENTAL RESPONSETORAI 82.1.2-2 KEWAUNEEPOWERSTATION DOMINION ENERGY KEWAUNEE, INC.---

SerialNo.10-665DocketNo.50-305 Attachment 1/Page1of2 Supplemental ResponsetoRAI 82.1.2-2 Dur ing a telephone conferenceheldonThursday, November 5 ,2010,membersoftheNRCandDominionEnergyKewaunee

,Inc.(DEK)staffsdiscussedtheKewauneelicenserenewal commitment43toinspectASMEClass1 small-borepipingsocketwelds.TheNRC staffindicatedthatapositionon appropriate samplesizeforClass1 small-borepipingweldshadbeenestablishedandwillbeincludedinNUREG-1801

,Revision2, Generic Aging Lessons Learned (GALL)Report ,SectionXI.M35.ThestatedNRC staffpositionisasfollows:

If an applicant has never experienced a failure (a through-wall crack detectedinthe subject component by evidence of leakage , or through nondestructive or destructive examination)initsClass 1 small bore piping and has extensive operating history(morethan30 years of operationattime of submittingtheapplication)

, the inspection sample size may be as lowas3%oftheweld population or a maximum of10welds ofeachweldtypeforeach operating unit.For socket welds , opportunistic destructive examinationcanbe performedinlieu of volumetric examination

.Because more informationcanbe obtained from a destructive examinationthanfrom nondestructive examination

, the applicant maytakecreditforeachweld destructively examined equivalent to having volumetrically examined two welds.Asaresultofthe conference call ,DEKis supplementingitsresponsetoRAI82.1.2-2

,whichwas previously submitted ,asamended ,inDEKletter10-548datedSeptember 23 ,2010[ADAMSML 102700162]

.AtKewaunee

,thereare currentlyatotalof345socketweldsinASMEClass1 small-borepipingsystems.

Therefore ,thetotalnumberofASMEClass1 socketweldsthatwillbesubjectto volumetricexaminationis10welds.Intheeventthata demonstrated

, nuclear-industryendorsed,inspection methodologyisnotavailable, destructive examinations of socketweldswillbesubstitutedfor volumetr ic non-destructiveexaminations.Each destructive weldexaminationwillbeconsidered equivalenttoperformingtwo volumetric weld examinations

,suchthatamaximumoffive destructive examinationswillbeperformed

.Aminimumoffour volumetric examinationsortwo destructive examinations(oran equivalent combination of examinations)willbeperformedpriortotheperiodofextendedoperation.Toallowfororderlyplanningand schedulingofplantresourcesandoutageworkload,theremaining examinationswillbe performedwithinthreeyearsofenteringtheperiodofextendedoperation

.Theextended scheduleforperformanceoftheremaining examinationsisreasonablebasedonthe plant-specific operatingexperiencefortheASMEClass1 small-borepipingwelds.

SerialNo.10-665DocketNo.50-305 Attachment1/Page2of2 Commitment43inLRA AppendixA,USARSupplement,TableA6

.0-1issupersededbythefollowing:

Item Commitment Source Schedule 43 Ten volumetric examinationsofASMELetter10-665; FourClass1 small-bore socketweldswillbe Supplemental volumetricperformedusinga demonstrated, nuclear-Responseto examinationsindustryendorsed,inspectionRAI82.1.2-2ortwo methodologythatcandetectcracking destructivewithinthe specified examinationvolume,if examinations a methodologybecomesavailable.Inthe(oraneventthata demonstrated, nuclear-equivalentindustryendorsed

, inspectioncombinationof methodologyisnotavailable

, destructive examinations) examinationsofsocketweldswillbepriortothesubstitutedfor volumetric non-destructiveperiodof examinations

.Each destructive weld extended examinationwillbeconsidered equivalent operation.toperformingtwo volumetric weld examinations,suchthatamaximumoffive Remaining destructive examinationswillbe examinations performed.withinthreeyearsofenteringtheperiodof extended operation