ML17339A724

From kanterella
Revision as of 17:25, 14 September 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Proposed Tech Spec Change,Table 4.1-1 Re Test of Instrument Channels
ML17339A724
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 01/25/1977
From:
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17339A722 List:
References
NUDOCS 8003240543
Download: ML17339A724 (2)


Text

1'ABLE 4 1-J.IQlVillm FREQUENCIES FOR CHECKS, CALYBRATEONS AND.TEST OP XNSTRUHENT CHANNELS I'hannel Deacri ti.on Calibrate Test Remarks 2..Nuclear Power Range (Check, Calibrate and Test only applicable above 10X of rated power.}S (l)~.l.lIII (4)O (2}'M(4)H (3)l)Load.v.s.flux curve or AT vs.reactor power curve 2}Thermal power calculation

.3)Signal to ATl bistable~action (permissive, ro~s top, trips)4)Upper&lower detectors for o'ymmetric offset (+5 to-5X'.2.-Nuclear Intermediate Range 3~Nuclear Source Range$(1)r S (1).Noho N.h.~~P (2)1)Once/shift up to 50X R.P.2)Log level;bistable action (permissive, rod'top, trip)1)Once/shift when in's'ervice 2)Bistable action (alarm, trip)4~Reactor Coolant Temperature 5.Rooctor Cool/nt Pico 6.Pressurizer Vater Level St e~st~~.R B/W (1)f.1)Overtemperature-AT

'2)r 2}Overpower-AT

'f'Hj'.Js 7, Pressuqi.zer Pressure 8.4 kv Voltage 5 Frequency St,., R N.Ao.R*" Hj'R'eactor protection circuLts oddly 9.Analog Rod Position 8o03ago~"~R With step counters 1/25/77

<