ML17353A711

From kanterella
Revision as of 10:46, 10 September 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Proposed Tech Specs Section 6.0, Administrative Controls.
ML17353A711
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 05/28/1996
From:
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17353A710 List:
References
NUDOCS 9606040148
Download: ML17353A711 (3)


Text

PROPOSED TECHNICAL SPECIFICATIONS Marked-up Technical Specifications Page 6-3 l 9606040148 960528 PDR PDR ADQCK 05000250 ADHIN I STRATI VE CONTROLS PLANT STAFF Continued 1.An individual should not be permitted to work more than 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> straight, excluding shift turnover time.2.An individual should not be permitted to work more than 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> in any 24-hour period, nor more than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in any 48-hour period, nor more than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in any 7-day period, all excluding shift turnover time.3.A break of at least 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> should be allowed between work periods, including shift turnover time.4~Except during extended shutdown periods, the use of overtime should be considered on an individual basis and not for the entire staff on a shift.h.Any deviation from the above guidelines shall be authorized by the applicable department manager or higher levels of management, in accordance with established procedures and with documentation of the basis for granting the deviation.

Controls shall be included in the procedures such that individual overtime shall be reviewed monthly by the Plant General Hanager or his designee to assure that excessive hours have not been assigned.Routine deviation from the above guidelines is not authorized.

The Operations Supervisor shall hold a Senior Reactor Operator License.The Operations Hanager shall either: hold or have held a Senior Reactor Operator License on the Turkey Point Plant;or, 2.3.have held a Senior Reactor Operator License on a similar plant (i.e., another pressurized water reactor);or, have e-ter-0 n-a-b'eactor-and-completed the Turkey Point Nuclear ant Senior Hanagemen Operations Training Course.(;e, c~4,-g.<g a4 e.~g/'p~op>aK s&u~a.fox go~e~,~~(<<+ype~e+ay)(~a~l Age/~ye(.TURKEY POINT-UNITS 3 8L 4 6-3 AHENDHENT NOS.155 AND 149 0 7 gl h il