Grand Gulf Nuclear Station, Unit 1, Response to Request for 3-Month Extension, Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems (TAC MD7831)
ML081130449
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 04/30/2008
From: Hiltz T G
NRC/NRR/ADRO/DORL/LPLIV
To:
Entergy Operations
Donohew J N, NRR/DORL/LPL4, 415-1307
References
GL-08-001, TAC MD7831
Download: ML081130449 (3)


Text

April 30, 2008

Vice President, Operations Entergy Operations, Inc.

Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150

SUBJECT:

GRAND GULF NUCLEAR STATION, UNIT 1 - GENERIC LETTER 2008-01, "MANAGING GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS,"

RESPONSE TO EXTENSION REQUEST (TAC NO. MD7831)

Dear Sir or Madam:

Generic Letter (GL) 2008-01, "Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal, And Containment Spray Systems," was issued by the Nuclear Regulatory Commission (NRC) on January 11, 2008 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML072910759). In GL 2008-01, the NRC requested licensees to submit information to demonstrate that the emergency core cooling, decay heat removal, and containment spray systems are in compliance with the applicable regulatory requirements, and that suitable design, operational, and testing control measures are in place for maintaining this compliance. The GL 2008-01 states that each licensee is requested to submit a written response within 9 months to provide requested information and that if a licensee cannot meet the requested 9-month response date, a 3-month written response is required that describes the licensee's proposed alternative course of action, including the basis for the acceptability of the proposed alternative course of action. The 3-month response was due April 11, 2008.

By letter dated April 10, 2008 (ADAMS Accession No. ML081020366), Entergy Operations, Inc.

(the licensee), stated that it had a telephone conversation with Jared Wermiel, Deputy Director, Division of Safety Systems, Office of Nuclear Reactor Regulation, NRC, on April 10, 2008, in which the licensee requested an extension to the date for the above 3-month response to the GL for the Grand Gulf Nuclear Station, Unit 1 (GGNS). In the call, the licensee verbally requested an extension to May 8, 2008, to provide the 3-month response to the GL so that it can accurately assess the scope of work required to complete the 9-month response to the GL. There is no planned outage for the station prior to the due date for the 9-month response. The licensee stated that it was granted the request.

This letter is to formally acknowledge the approval of the requested extension to the due date for submitting the 3-month response to GL 2008-01 and to document the telephone call(s) with the NRC staff. Specifically, Entergy Operations, Inc. requested an extension for providing the above 3-month response from April 11, 2008, to May 8, 2008, for GGNS. The NRC staff finds that the justification for GGNS to extend the due date for the 3-month written response to GL 2008-01 to May 8, 2008, is acceptable, and the extension request is granted. This letter does not alter or change the required 9-month response date of October 11, 2008.

If you have any questions regarding this issue, please contact Jack Donohew, your assigned project manager, at 301-415-1307 or, via email, at jack.donohew@nrc.gov.

Sincerely,

/RA/

Thomas G. Hiltz, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Docket No. 50-416

cc: See next page

ML081130449 NRR-106 OFFICE DORL/LPL4/PM DORL/LPL4/LA DSS/DD DPR/PGCB/BC DORL/LPL4/BC NAME JDonohew JBurkhardt JWermiel MMurphy THiltz DATE 4/28/08 4/28/08 4/28/08 4/29/08 4/30/08 Grand Gulf Nuclear Station (2/25/08)

cc:

Senior Vice President Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995

Vice President, Oversight Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995

Senior Manager, Nuclear Safety

& Licensing Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995

Senior Vice President

& Chief Operating Officer Entergy Operations, Inc.

P.O. Box 31995 Jackson, MS 39286-1995

Associate General Counsel Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995

Manager, Licensing Entergy Operations, Inc.

Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150

State Health Officer State Health Board P.O. Box 1700 Jackson, MS 39215

Attorney General Asst. Attorney General State of Mississippi P.O. Box 22947 Jackson, MS 39225-2947 Office of the Governor State of Mississippi Jackson, MS 39201

Attorney General Department of Justice State of Louisiana P.O. Box 94005 Baton Rouge, LA 70804-9005

President Claiborne County Board of Supervisors P.O. Box 339 Port Gibson, MS 39150

Richard Penrod, Senior Environmental Scientist/State Liaison Officer Office of Environmental Services Northwestern State University Russell Hall, Room 201 Natchitoches, LA 71497

Chief, Energy and Transportation Branch Environmental Compliance and Enforcement Division Mississippi Department of Environmental Quality P.O. Box 10385 Jackson, MS 39289-0385

Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064

Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 399 Port Gibson, MS 39150