ML081130449

From kanterella
Jump to navigation Jump to search

Response to Request for 3-Month Extension, Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems
ML081130449
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 04/30/2008
From: Hiltz T
NRC/NRR/ADRO/DORL/LPLIV
To:
Entergy Operations
Donohew J N, NRR/DORL/LPL4, 415-1307
References
GL-08-001, TAC MD7831
Download: ML081130449 (3)


Text

April 30, 2008 Vice President, Operations Entergy Operations, Inc.

Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150

SUBJECT:

GRAND GULF NUCLEAR STATION, UNIT 1 - GENERIC LETTER 2008-01, MANAGING GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS, RESPONSE TO EXTENSION REQUEST (TAC NO. MD7831)

Dear Sir or Madam:

Generic Letter (GL) 2008-01, Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal, And Containment Spray Systems, was issued by the Nuclear Regulatory Commission (NRC) on January 11, 2008 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML072910759). In GL 2008-01, the NRC requested licensees to submit information to demonstrate that the emergency core cooling, decay heat removal, and containment spray systems are in compliance with the applicable regulatory requirements, and that suitable design, operational, and testing control measures are in place for maintaining this compliance. The GL 2008-01 states that each licensee is requested to submit a written response within 9 months to provide requested information and that if a licensee cannot meet the requested 9-month response date, a 3-month written response is required that describes the licensee's proposed alternative course of action, including the basis for the acceptability of the proposed alternative course of action. The 3-month response was due April 11, 2008.

By letter dated April 10, 2008 (ADAMS Accession No. ML081020366), Entergy Operations, Inc.

(the licensee), stated that it had a telephone conversation with Jared Wermiel, Deputy Director, Division of Safety Systems, Office of Nuclear Reactor Regulation, NRC, on April 10, 2008, in which the licensee requested an extension to the date for the above 3-month response to the GL for the Grand Gulf Nuclear Station, Unit 1 (GGNS). In the call, the licensee verbally requested an extension to May 8, 2008, to provide the 3-month response to the GL so that it can accurately assess the scope of work required to complete the 9-month response to the GL. There is no planned outage for the station prior to the due date for the 9-month response. The licensee stated that it was granted the request.

This letter is to formally acknowledge the approval of the requested extension to the due date for submitting the 3-month response to GL 2008-01 and to document the telephone call(s) with the NRC staff. Specifically, Entergy Operations, Inc. requested an extension for providing the above 3-month response from April 11, 2008, to May 8, 2008, for GGNS. The NRC staff finds that the justification for GGNS to extend the due date for the 3-month written response to GL 2008-01 to May 8, 2008, is acceptable, and the extension request is granted. This letter does not alter or change the required 9-month response date of October 11, 2008.

If you have any questions regarding this issue, please contact Jack Donohew, your assigned project manager, at 301-415-1307 or, via email, at jack.donohew@nrc.gov.

Sincerely,

/RA/

Thomas G. Hiltz, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-416 cc: See next page

ML081130449 NRR-106 OFFICE DORL/LPL4/PM DORL/LPL4/LA DSS/DD DPR/PGCB/BC DORL/LPL4/BC NAME JDonohew JBurkhardt JWermiel MMurphy THiltz DATE 4/28/08 4/28/08 4/28/08 4/29/08 4/30/08 Grand Gulf Nuclear Station (2/25/08) cc:

Senior Vice President Office of the Governor Entergy Nuclear Operations State of Mississippi P.O. Box 31995 Jackson, MS 39201 Jackson, MS 39286-1995 Attorney General Vice President, Oversight Department of Justice Entergy Nuclear Operations State of Louisiana P.O. Box 31995 P.O. Box 94005 Jackson, MS 39286-1995 Baton Rouge, LA 70804-9005 Senior Manager, Nuclear Safety President

& Licensing Claiborne County Entergy Nuclear Operations Board of Supervisors P.O. Box 31995 P.O. Box 339 Jackson, MS 39286-1995 Port Gibson, MS 39150 Senior Vice President Richard Penrod, Senior Environmental

& Chief Operating Officer Scientist/State Liaison Officer Entergy Operations, Inc. Office of Environmental Services P.O. Box 31995 Northwestern State University Jackson, MS 39286-1995 Russell Hall, Room 201 Natchitoches, LA 71497 Associate General Counsel Entergy Nuclear Operations Chief, Energy and Transportation Branch P.O. Box 31995 Environmental Compliance and Jackson, MS 39286-1995 Enforcement Division Mississippi Department of Environmental Manager, Licensing Quality Entergy Operations, Inc. P.O. Box 10385 Grand Gulf Nuclear Station Jackson, MS 39289-0385 P.O. Box 756 Port Gibson, MS 39150 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission State Health Officer 611 Ryan Plaza Drive, Suite 400 State Health Board Arlington, TX 76011-8064 P.O. Box 1700 Jackson, MS 39215 Senior Resident Inspector U.S. Nuclear Regulatory Commission Attorney General P.O. Box 399 Asst. Attorney General Port Gibson, MS 39150 State of Mississippi P.O. Box 22947 Jackson, MS 39225-2947