Pages that link to "05000423/LER-1996-042, Provides Util Revised Plans for Implementation of Commitment Made in LER 96-042-00"
Jump to navigation
Jump to search
The following pages link to 05000423/LER-1996-042, Provides Util Revised Plans for Implementation of Commitment Made in LER 96-042-00:
Displayed 20 items.
- 05000423/LER-1996-032, Forwards LER 96-032-00 Re 960909 Event.Listed Commitments Will Be Completed Including Performance of Hydrostatic Test of Sih Relief Valves (← links)
- 05000336/LER-1996-003, Forwards LER 96-003-01,documenting Event That Originally Occurred at Mnps,Unit 2,on 960205.Encl Provides Final Update on Analyses & Investigation for Event.Commitments Made by Util Are Included in Attachment 1 (← links)
- 05000336/LER-1996-018, Forwards LER 96-018-01,documenting Condition That Was Discovered at Unit 2 on 960319.LER Suppl Provides Update on Analyses & Investigation of Condition.Attachment 1 Is Clarification of Original Commitment Associated W/Ler (← links)
- 05000423/LER-1996-015, Forwards LER 96-015-05,documenting Event That Occurred at Plant,Unit 3 on 960610,per 10CFR50.73(a)(2)(ii)(B). Commitments Made within Ltr Submitted (← links)
- 05000336/LER-1996-024, Forwards LER 96-024-02,documenting Event Which Occurred on 960507 Re Inadequate ESAS & RPS Response Time Surveillance Testing.Commitments Made within Ltr Are Included in Attachment 1 (← links)
- 05000336/LER-1996-017, Forwards LER 96-017-01,documenting Condition That Was Discovered at Unit 2 on 960320.LER Suppl Provides Update on Analyses & Investigation of Condition.Util Commitments Made within Ltr Included in Attachment 1 (← links)
- 05000423/LER-1996-034, Forwards LER 96-034-02,documenting Condition That Was Initially Determined Reportable at Millstone Unit 3 on 960918.Commitments Made in Response to Event Also Encl (← links)
- 05000336/LER-1996-004, Forwards LER 96-004-01,documenting Event That Occurred at Unit 2 on 960131.New Util Commitment Made within Ltr,Listed (← links)
- 05000423/LER-1996-040, Discusses LER 96-040-00, Potential Component Cooling Water Sys Overcooling Due to Loss of Instrument Air Sys Concurrent W/Low Svc Water Inlet Temp. Revised Commitment Provided in Encl (← links)
- 05000423/LER-1996-021, Forwards LER 96-021-02 Re Components Not Included in IST Program as Result of Programmatic Deficiencies.Status of NNECO Commitments from Previous LER Suppl Are Contained in Attachment 1.Addl Commitments Contained in Attachment (← links)
- 05000245/LER-1996-023, Forwards LER 96-023-01,documenting Condition Discovered at Millstone,Unit 1 on 960306.Attachment 1 Contains Commitments Made within Ltr (← links)
- 05000423/LER-1996-004, Forwards LER 96-004-01 Documenting Condition That Was Originally Determined Reportable at Mnps,Unit 3,on 960319. Commitments Made by Util,Encl (← links)
- 05000245/LER-1996-066, Forwards LER 96-066-00 Documenting Event That Occurred at Unit 1 on 960326.Ltr Contains Commitments (← links)
- 05000336/LER-1996-030, Forwards LER 96-030-01,documenting Event That Occurred at Millstone,Unit 2 on 960820.LER Supplement Provides an Update on Analyses & Investigation Currently Underway for Event. Commitments Made within Ltr,Encl (← links)
- 05000245/LER-1996-039, Forwards LER 96-039-02 Re IST of Valves Not Being Performed IAW Program & ASME Code Requirements.Suppl of Completion of Commitments Provided (← links)
- 05000336/LER-1996-025, Provides Update on Status of GL 96-01 Actions as Committed to by Util for Unit 2 in & LER 96-025-01. Commitment Contained in ,Listed.As of 970915, Requested Action of Subj GL Has Been Completed (← links)
- 05000423/LER-1996-029, Forwards Revised Commitments That Were Previously Submitted to NRC in LER 96-029-00, Functional Deficiency in Setting of ECCS Throttle Valve Positions (← links)
- 05000245/LER-1996-035, Forwards LER 96-035-02,documenting Event That Occurred on 960506.Rept Provides Results of Metallurgical Sample from Gamma Plug Per Commitment B15744-3 to Determine Cause of Cracks Found in Gamma Access Port Plug (← links)
- 05000423/LER-1996-036, Forwards LER 96-036-02,documenting Condition Originally Identified on 960926.List of Commitments Provided (← links)
- B16317, Forwards Independent CR Verification Program Response to Questions Re Proposed Contractor for Millstone Nuclear Power Station,Units 1 & 3 (← links)