- ML20247H855 (← links)
- PNO-I-89-036, on 890519,reactor High Level Water Feed Pump Tripped.Caused by Shifting of Feedwater Level Control Sys by Reactor Operator from Single Element to Three Element Control.Water Level Recovered & Isolations Reset (← links)
- PNO-I-89-060, facility Authorized to Proceed to 100% Power. Evaluation by NRC Determined to Be Satisfactory.Insp on Site Will Continue w/around-clock Coverage (← links)
- ML20247D442 (← links)
- ML20246P582 (← links)
- ML20246H591 (← links)
- PNO-I-89-050, on 890627,confirmatory Action Ltr Issued on Util & Commonwealth of PA Agreement to Satisfy Concerns Re Restart Plan.Agreement Should Form Basis for Concluding Hearing on Util Reorganization (← links)
- PNO-I-89-052, facility Authorized to Proceed to 70% Power. Insp on Site Will Continue During Power Ascension from 35% to 70% Power & Subsequent Transient Testing (← links)
- PNO-I-89-014, on 890227 Commonwealth of PA & Util Announced Agreement on Proposed Actions to Address Commonwealth Concerns Re Mgt & Safety at Plant & to Provide Exchange of Info W/Commonwealth for Next 8 Yrs (← links)
- PNO-I-89-034, on 890426,Unit 2 Initiated Startup After Receiving Approval to Operate at Power Levels Not Exceeding 35% Full Power.Licensee Will Be Performing Control Rod Manipulations.Addl NRC Inspectors on Site to Monitor Plant (← links)
- ML20236R575 (← links)
- ML20236M087 (← links)
- ML20236L505 (← links)
- ML20236F300 (← links)
- PNO-I-87-057, on 870621,plant Manager Found Security Watchman Asleep at Drywell Access.Watchman Escorted Offsite by Sergeant of Guards & Employment Terminated.Licensee Investigating Incident & Residents Reviewing Actions (← links)
- PNO-I-86-083, on 861015,licensee Manually Scrammed Unit & Placed in Cold Shutdown for Condensate Pump Repairs.Damaged Thrust Bearing Will Be Repaired & Pump Will Be Returned to Svc on 861019.Startup Planned on 861019 (← links)
- ML20211E357 (← links)
- PNO-I-83-038A, on 830427,recirculation Loop a Riser Exam Completed.One Weld in Each of Two Risers Had Crack Indications.Data Forwarded to GE for More Detailed Analysis. Licensee Addressing Repair Method & Impact on Outage (← links)
- PNO-I-88-042A, on 880414,updated PNO Re Alcohol Bottle Found in Control Room by Engineers Performing Inventory of Agastat Relays Inside Electrical Distribution Panel.Senior Resident Inspector Notified & Investigation Continuing (← links)
- PNO-I-88-042, licensee Notified NRC That on 870414,brandy Bottle Found Inside Control Room Panel.Further Licensee Investigation Is to Include Confirmation of Bottle Contents, Check for Fingerprints & Search for Date of Liquor Seal (← links)
- PNO-I-87-108A, on 871118,FBI Arrested Four Licensee & Two Contractor Employees Accused of Drug Distribution at Plant & Surrounding Area.One Util & Contractor Employees Found Guilty & Remaining Two Util Defendants Suspended (← links)
- PNO-I-87-108B, on 871118,FBI Arrested Six Individuals Accused of Drug Distribution at Plant.Based on Util Review of Info from trial,16 People Were Implicated.Util Terminated Four Employees & Intends to Terminate Seven Other Employees (← links)
- PNO-I-90-073, on 900830,licensee Identified That Reactor Vessel Level Monitoring Instruments Reading About 10 Inches Higher than Expected.Caused by Ref Leg Being Less than Completely Full.Manual Scram from Low Power Initiated (← links)
- PNO-I-90-058, on 900727,cooling Water Supply Valve to Offgas Recombiner Condenser Failed & Closed.Reactor Power Reduced & Manual Reactor Scram Initiated.Plant Will Remain Shutdown Pending Completion of Licensee post-event Investigation (← links)