Pages that link to "Lydon J"
← Lydon J
Jump to navigation
Jump to search
The following pages link to Lydon J:
Displayed 50 items.
- ML20212N826 (← links)
- ML20212L352 (← links)
- ML20212K740 (← links)
- ML20212K034 (← links)
- ML20212J323 (← links)
- ML20212J234 (← links)
- ML20212G678 (← links)
- NUREG-0416, Informs That 851219 Proposed Changes Re Vital Area Barriers & Openings in Vital Area Barriers (Rev 17 to Modified Amended Security Plan) Unacceptable (Ref 10CFR50.54(p) & NUREG-0416) (← links)
- ML20212B301 (← links)
- ML20212A337 (← links)
- ML20211R080 (← links)
- ML20238E460 (← links)
- ML20237G509 (← links)
- ML20236H132 (← links)
- ML20215N925 (← links)
- ML20215N720 (← links)
- ML20215N472 (← links)
- ML20215M460 (← links)
- ML20215H833 (← links)
- ML20215H065 (← links)
- ML20215E617 (← links)
- ML20215D812 (← links)
- ML20215C352 (← links)
- ML20215C314 (← links)
- ML20215B820 (← links)
- ML20214S466 (← links)
- ML20211Q178 (← links)
- ML20211P948 (← links)
- ML20211P308 (← links)
- ML20211N763 (← links)
- ML20211M912 (← links)
- ML20211J146 (← links)
- BECO-86-173, Partially Withheld Security Event Rept:On 861107,HVAC Duct, Penetrating Vital Area,Removed by Contracted Craft Workers Before Notifying Security.Cause Not Stated.Security Oversight of Subj Contract Work Intensified (← links)
- BECO-86-171, Partially Withheld Security Event Rept:On 861106,temporary Vital Area Barrier Insp Found Barrier Could Be Breached. Barrier Modified & Compensatory Security Measures Released (← links)
- BECO-86-125, Partially Withheld Security Event Rept:On 860826,bomb Threat Received.Search Initiated.No Suspicious Objects Found (← links)
- BECO-86-145, Forwards Augmented Insp Program for Piping Susceptible to Igscc,Per Generic Ltr 84-11.Preliminary List of Welds to Be Examined During Refueling Outage 7 & Isometric Drawings, Depicting Location of Subj Welds,Encl (← links)
- BECO-86-186, Forwards Revised Page 81 to Application for Amend to License DPR-35,consisting of Proposed Change 85-113 Re Surveillance Requirements If Three or More Control Rods Have Insertion Times in Excess of 7 (← links)
- BECO-86-148, Forwards Inservice Insp Plan for 1986 Refueling Outage,Per Article IWA-1400(c),ASME Code Section XI to Winter 1980 Addenda.Performance of Ref Exams Will Complete Requirements for First Insp Period of Second 10-yr Interval (← links)
- BECO-86-183, Forwards Rev 18 to Security Plan.Rev Withheld (Ref 10CFR73.21) (← links)
- BECO-86-113, Withdraws 860714 Request for Schedular Exemption from 10CFR50.48(c)(3)(iii) Requirements Re Fire Protection Mods. Exemption Request No Longer Needed (← links)
- BECO-86-178, Submits 1986 Main Breakwater Surveillance Rept,Per Requirements of Breakwater Continuous Monitoring Program.No Damage or Major Stone Movement Occurred Since 1985 Rept. Supporting Photographs & One Oversize Drawing Encl (← links)
- BECO-86-179, Responds to IE Bulletin 86-003, Potential Failure of Multiple ECCS Pumps Due to Single Failure of Air-Operated Valve in Min Flow Recirculation Line. Required Actions Will Be Implemented Per IE Bulletin 86-001 (← links)
- BECO-86-176, Forwards Info to Clarify Exemption Request 13 Re Localized Flame Effect from Open Cable Trays Located Below Structural Beams in Torus Compartment,Per NRC 860922 & 1001 Telcons. W/One Oversize Figure (← links)
- BECO-87-011, Responds to NRC Re Insp Rept 50-293/86-19.Actions Taken in Response to Inspector Followup Items Detailed in Encl.All Commitments Made Have Associated Completion & Target Dates & Assigned Personnel (← links)
- BECO-86-123, Forwards Revised Tech Spec Page 204A,incorporating Modified Footnote Ref in 811002 Application for Amend 49 to License DPR-35 Re Spiral Unloading of Fuel Cells to Facilitate Insp (← links)
- BECO-86-126, Requests Schedular Exemption from 10CFR50,App J Re Type a Test.Exemption Requested to Preclude Necessity of Performing Two Type a Tests During Refueling Outage 7 by Allowing Performance of Only One Test Following Refueling (← links)
- BECO-87-007, Responds to NRC 860106 Request for Submittal Date for Revised Summary Rept for Dcrdr.Supplementary Summary Rept Will Be Submitted,Based Upon Rescreening Plus Addl Planning & Budgeting within 4 Months Following Refueling Outage 7 (← links)
- BECO-87-037, Forwards Info Re Vinyl Baseboard Intended for Use W/Class 1 Carpeting in Control Room.Vinyl Baseboard Not Available as Class a Per Ul Test 723.Util Will Proceed W/Use of Flexco Products as Provided by Life Safety Code (← links)
- BECO-87-036, Requests Continued Review & Approval of 870119 Application to Change Tech Spec 4.7.B.2.a Re Reduction of Differential Pressure from 8 to 6 Inches in Control Room High Efficiency Air Filtration Sys,Per NRC .Related Info Encl (← links)
- BECO-86-188, Forwards Rev 3 to Second 10-yr Inservice Insp Program.Rev Necessary Due to Recirculation Pipe Replacement Project Implemented During 1983-1984 Refueling Outage.Program Updated to Reflect Current Plant Configuration (← links)