Forwards Safety Insp Rept 50-293/86-29 on 860805-0908.No Violations Observed.Concern Expressed Re Lack of Effective & Aggressive Followup by Plant Mgt to Two Incidents Involving Inadequate Investigation of Release of Unsurveyed Matl
ML20215H065
Person / Time
Site: Pilgrim
Issue date: 10/14/1986
From: Kister H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Lydon J
BOSTON EDISON CO.
Shared Package
ML20215H067 List:
References
NUDOCS 8610210414
Download: ML20215H065 (2)


See also: IR 05000293/1986029

Text

.

,-

.

Oct 2 4 g

Docket No. 50-293

Boston Edison Company M/C Nuclear

ATTN: Mr. James M. Lydon

Chief Operating Officer

800 Boylston Street

Boston, Massachusetts 02199

Gentlemen:

Subject: Inspection Report No. 50-293/86-29

This letter refers to the routine safety inspection (50-293/86-29) conducted by

Dr. M. McBride and Mr. J. Lyash of this office on August 5,1986 to September 8,

1986 at the Pilgrim Nuclear Power Station, Plymouth, Massachusetts. Areas

examined during this inspection are described in the NRC Region I Inspection

Report which is enclosed with this letter.

We are' concerned about the lack of effective and aggressive followup by plant

management to two incidents during the inspection period. These incidents in-

volved an inadequate investigation following the release of unsurveyed and

potentially contaminated material from the site and the excessive time required

for repair of instrument lines needed to provide an indication of shutdown

cooling flows in the control' room. These incidents demonstrate the need for

your continued attention.

Within the scope of this inspection, no violations were observed.

No reply to this letter is required. Your cooperation with us in this matter

is appreciated.

Sincerely,

original sisnod By

Harry B. Kister, Chief

Projects Branch No. 1

Enclosure: NRC Region I Inspection Report No. 50-293/86-29

8610210414 e61014

PDR

G

ADOCK 05000293

PDR

OFFICIAL RECORD COPY IR PILGRIM 86-29 - 0001.0.0

10/14/86 TEOl g

.

.

Boston Edison Company M/C Nuclear 2

cc w/ encl:

L. Oxsen, Vice President, Nuclear Operations

A. E. Pedersen, Station Manager

Paul Levy, Chairman, Department of Public Utilities

Chairman, Board of Selectmen

J. D. Keyes

Plymouth Civil Defense Director

Congressman E. J. Markey

Senator Edward P. Kirby

The Honorable Peter V. Forman

Sharon Pollard

i Public Document Room (PDR)

Local Public Document Room (LPDR)

>

Nuclear Safety Information Center (NSIC)

l

NRC Resident Inspector

1

Commonwealth of Massachusetts (2)

bec w/ encl:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

DRP Section Chief

P. Leech, LPM, NRR

>

Robert J. Bores, DRSS

L. Doerflein

R. Fuhrmeister .

.,

d

i

)r d-

'

' EI:DRP '

}RI:DRP  : tRP

McBride -

Strosnider Kister

10/8/86 10/df/86 10//l//86

0FFICIAL RECORD COPY IR PILGRIM 86-29 - 0002.0.0

10/07/86

I

. - , . - - - - - - - - , . - _ - , _ . . - - - - - - , . _ - - _ . - . - . -.- -