February 19, 1987 e

Docket No. 50-293 DISTRIPUTION Eunsuetfive:/

BGrimes NRC PDR JPartlow Local PDR NThompson BWD1 Reading RAuluck Mr. James M. Lydon RBernero CJamerson Chief Operating Officer OGC-BETH (Info)

JZwolinski Boston Edison Company EJordan ACRS (10) 800 Boylston Street RDiggs Pilgrim File Boston, Massachusetts 02199 Glainas

Dear Mr. Lydon:

SUBJECT:

APPENDIX J REVIEW, PENETRATION X-21 (TAC 64406)

Re:

Pilgrim Nuclear Power Station Your letter of October 5,1984 stated that an exemption from 10 CFR Part 50 Appendix J local leak rate testing requirements is still requested for the 2-inch check valves in the service air line to the drywell through penetration X-71.

These valves are included in Table 2 - Valves Disqualified as PCIVs -

which is attached to your letter of January 27, 1976. Footnote 2 of the Table states that "...this line is a spare line capped inside the drywell. Line is exposed to Type A leak test pressure and any leakage is recorded in the Type A results."

Boston Edison staff informed us by telephone on' October 27, 1986 that the-

?-inch line consists of carbon steel, schedule 80. It has a wye configuration inside the drywell and both branches have welded-on caps. There is a test connection on the section of line outside the drywell which is capped except during Type A testing.

The NRC staff has determined that, since the line in question is capped, the check valves, in the line are not subject to the local leak rate testing requirements of Appendix J and therefore, an exemption is not necessary.

Sincerely, Original signed by 0703020215 870219 ADOCK 0b000293 g?

Rajender Auluck, Pro.iect Manager BWR Project Directorate #1 Division of BWR Licensing cc: See next page DBL:BWD1()

D L-

? I Pg CJamerso uck:jg T RA ck (g

,W d 02/A/87 02/9/87 2/q/87 pq g, gk

v..

..ec_.

'.)

^

. "h_

Mr. James M. Lydon Boston Edison Company Pilgrim Nuclear Power Station cc:

hr. Alfred E. Pedersen, Station Manager Easton Edison Company RFD #1, Rocky Hill Road Plymouth, Massachusetts 02360

+

Resident Inspector's Office

-1 U. S. Nuclear Regulatory Commission Post Office Box 867 Plymouth, Massachusetts 02360 Chairman, Board of Selectmen 11 Lincoln Street Plymouth, Massachusetts 02360 Office of the Commissioner Massachusetts Department of Environmental Quality Engineering One Winter Street Boston, Massachusetts 02108 Office of the Attorney General 1 Ashburton Place 19th Floor Boston, Massachusetts 02108

~

Mr. Robert M. Hallisey, Director Radiation Control Program Massachusetts Department of Public Health 150 Tremont Street, 2nd Floor Boston, Massachusetts 02111 Pegional Administrator, Region I U. S. Nuclear Pegulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 Mr. James D. Keyes Boston Edison Company 25 Braintree Hill Office Park Braintree, Massachusetts 02184 l

l l

_