Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Start dateSiteTitle
IR 05000220/20210015 May 2021Nine Mile PointIntegrated Inspection Report 05000220/2021001 and 05000410/2021001
IR 05000220/202100210 August 2021Nine Mile Point
07201036
Integrated Inspection Report 05000220/2021002 and 05000410/2021002 and Independent Spent Fuel Storage Installation Report 07201036/2021002
IR 05000220/20210039 November 2021Nine Mile Point
07201036
Integrated Inspection Report 05000220/2021003 and 05000410/2021003 and Independent Spent Fuel Storage Installation Report 07201036/2021001
IR 05000220/202101024 August 2021Nine Mile PointTriennial Fire Protection Inspection Report 05000220/2021010 and 05000410/2021010
IR 05000220/202140222 June 2021Nine Mile PointSecurity Baseline Inspection Report 05000220/2021402 and 05000410/2021402
IR 05000220/202150114 October 2021Nine Mile PointEmergency Preparedness Biennial Exercise Inspection Report 05000220/2021501 and 05000410/2021501
IR 05000237/202000111 May 2020DresdenUnits, Units 2 and 3 - Integrated Inspection Report 05000237/2020001 and 05000249/2020001
IR 05000237/202000210 August 2020DresdenIntegrated Inspection Report 05000237/2020002; 05000249/2020002; and 07200037/2020001
IR 05000237/202000310 November 2020DresdenIntegrated Inspection Report 05000237/2020003 and 05000249/2020003
IR 05000237/202000410 February 2021DresdenIntegrated Inspection Report 05000237/2020004 and 05000249/2020004
IR 05000237/20200064 March 2021DresdenAnnual Assessment Letter for Dresden Nuclear Power Station, Units 2 and 3 (Report 05000237/2020006 and 05000249/2020006)
IR 05000237/202001219 May 2020DresdenNRC Inspection Report 05000237/2020012 and 05000249/2020012 and Apparent Violation
IR 05000237/202040316 December 2020DresdenSecurity Baseline Inspection Report 05000237/2020403 and 05000249/2020403
IR 05000237/202100113 April 2021DresdenIntegrated Inspection Report 05000237/2021001 and 05000249/2021001
IR 05000237/20210029 August 2021DresdenIntegrated Inspection Report 05000237/2021002 and 05000249/2021002
IR 05000237/20210031 November 2021DresdenIntegrated Inspection Report 05000237/2021003 and 05000249/2021003
IR 05000237/20210051 September 2021DresdenUpdated Inspection Plan for Dresden Nuclear Power Station, Units 2 and 3, Report 05000237/2021005 and 05000249/2021005
IR 05000237/20210062 March 2022DresdenAnnual Assessment Letter (Report 05000237/2021006 and 05000249/2021006)
IR 05000237/202101023 February 2021DresdenDesign Basis Assurance Inspection (Teams) Inspection Report 05000237/2021010 and 05000249/2021010
IR 05000237/202101130 September 2021DresdenTriennial Fire Protection Inspection Report 05000237/2021011 and 05000249/2021011
IR 05000237/202140216 March 2021DresdenSecurity Baseline Inspection Report 05000237/2021402 and 05000249/2021402
IR 05000237/20214049 August 2021DresdenSecurity Baseline Inspection Report 05000237/2021404 and 05000249/2021404
IR 05000237/202150125 August 2021DresdenEmergency Preparedness Biennial Exercise Inspection Report 05000237/2021501 and 05000249/2021501
IR 05000237/202200522 August 2022DresdenUpdated Inspection Plan for Dresden Nuclear Power Station (Report 05000237/2022005; 05000249/2022005)
IR 05000237/20220061 March 2023DresdenAnnual Assessment Letter for Dresden Nuclear Power Station, Units 2 and 3 (Report 05000237/2022006 and 05000249/2022006)
IR 05000244/20200016 May 2020GinnaLLC: Integrated Inspection Report 05000244/2020001 and Independent Spent Fuel Storage Installation Report 07200067/2020001
IR 05000244/202000315 April 2021GinnaR. E. Ginna Nuclear Power Plant, LLC: Reissued Integrated Inspection Report 05000244/2020003
IR 05000244/20200048 February 2021GinnaR. E. Ginna Nuclear Power Plant, LLC: Integrated Inspection Report 05000244/2020004
IR 05000244/202040230 July 2020GinnaR. E. Ginna Nuclear Power Plant: Security Baseline Inspection Report 05000244/2020402
IR 05000244/20210015 May 2021GinnaLLC: Integrated Inspection Report 05000244/2021001
IR 05000244/20210023 August 2021GinnaLLC: Integrated Inspection Report 05000244/2021002
IR 05000244/20210034 November 2021GinnaIntegrated Inspection Report 05000244/2021003
IR 05000244/20210051 September 2021GinnaUpdated Inspection Plan for the R.E. Ginna Nuclear Power Plant, Llc (Report 05000244/2021005
IR 05000244/20210062 March 2022GinnaAnnual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2021006)
IR 05000244/20210107 June 2021GinnaLLC: NRC Inspection Report 05000244/2021010
IR 05000244/202101127 April 2021GinnaLLC: Temporary Instruction 2515/194 Inspection Report 05000244/2021011
IR 05000244/20214012 July 2021GinnaR. E. Ginna Nuclear Power Plant: Security Baseline Inspection Report 05000244/2021401
IR 05000244/202150129 September 2021GinnaLLC - Emergency Preparedness Biennial Exercise Inspection Report 05000244/2021501
IR 05000244/202200531 August 2022GinnaUpdated Inspection Plan for R.E. Ginna Nuclear Power Plant (Report 05000244/2022005)
IR 05000244/20220061 March 2023GinnaAnnual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2022006)
IR 05000247/202000129 April 2020Indian PointIntegrated Inspection Report 05000247/2020001 and 05000286/2020001
IR 05000247/202000210 August 2020Indian PointIntegrated Inspection Report 05000247/2020002 and 05000286/2020002
IR 05000250/20200017 May 2020Turkey PointIntegrated Inspection Report 05000250/2020001 and 05000251/2020001
IR 05000250/202000210 August 2020Turkey Point
07200062
Integrated Inspection Report 05000250/2020002, 05000251/2020002, and Independent Spent Fuel Storage Installation Inspection (ISFSI) 07200062/2020001
IR 05000250/20200034 November 2020Turkey PointIntegrated Inspection Report 05000250/2020003 and 05000251/2020003
IR 05000250/202000411 February 2021Turkey PointIntegrated Inspection Report 05000250/2020004 and 05000251/2020004 and Independent Spent Fuel Storage Installation Inspection (ISFSI) 07200062/2020002
IR 05000250/20200509 December 2020Turkey PointSpecial Inspection Report 05000250/2020050 and 05000251/2020050
IR 05000250/202040114 December 2020Turkey PointSecurity Baseline Inspection Report 05000250/2020401 and 05000251/2020401
IR 05000250/20210017 May 2021Turkey PointIntegrated Inspection Report 05000250/2021001 and 05000251/2021001 and Assessment Follow-Up Letter
IR 05000250/20210024 August 2021Turkey PointIntegrated Inspection Report 05000250/2021002 and 05000251/2021002