July 30, 2020
SUBJECT:
R. E. GINNA NUCLEAR POWER PLANT - SECURITY BASELINE INSPECTION REPORT 05000244/2020402
Dear Mr. Hanson:
On July 23, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at R. E. Ginna Nuclear Power Plant and discussed the results of this inspection with Mr. Paul Swift and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, X /RA/
Signed by: Fred L. Bower
Fred L. Bower, III, Chief Plant Support Branch Division of Reactor Safety
Docket No. 05000244 License No. DPR-18
Enclosure:
As stated
Inspection Report
Docket Number:
05000244
License Number:
Report Number:
Enterprise Identifier: I-2020-402-0004
Licensee:
Exelon Nuclear
Facility:
R. E. Ginna Nuclear Power Plant
Location:
Ontario, NY
Inspection Dates:
July 20, 2020 to July 23, 2020
Inspectors:
K. Hussar, Physical Security Inspector
S. McCarver, Physical Security Inspector
J. Rey, Physical Security Inspector
Approved By:
Fred L. Bower, III, Chief
Plant Support Branch
Division of Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at R. E. Ginna Nuclear Power Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:
http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.
Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), regional inspectors were directed to begin teleworking. The inspection documented below was completed through a combination of remote and on-site inspection.
SAFEGUARDS
71130.02 - Access Control
The inspectors evaluated the access control program through completion of the following
===inspection elements:
Access Control===
(1)
- Tier I: All Requirements
- Tier II: 8 Requirements (02.06 a - c, 02.08 a, b, c, f, i)
- Tier III: 1 Requirement (02.09)
71130.04 - Equipment Performance, Testing, and Maintenance
The inspectors evaluated the security equipment testing and maintenance program. The following elements were evaluated from this IP.
Equipment Performance, Testing, and Maintenance (1 Sample)
(1)
- Tier I: All Requirements
- Tier II: 4 Requirements (02.09 a, 02.10 a, 02.11 a, 02.12 a)
- Tier III: 2 Requirements (02.15 a, b)
71130.07 - Security Training
The inspectors evaluated the security training program through completion of the following
===procedure elements:
Security Training===
(1)
- Tier I: All Requirements
- Tier II: 6 Requirements (02.05 a, - d, 02.06 b, 02.09 b)
- Tier III: 5 Requirements (02.13 a - b, 02.14 a - c)
71130.09 - Security Plan Changes
The inspectors evaluated the security plan changes through completion of the following procedure elements:
Review Security Plan Changes (IP Section 02.01) (1 Sample)
- (1) Since the last NRC inspection of this program area, Security Plan Revision 12 was implemented based on your determination, in accordance with 10 CFR 50.54(p)(2),that the changes resulted in no decrease in safeguards effectiveness of the security plan, and that the revised security plan changed continues to meet the requirements of 10 CFR 73.55(b). The inspectors conducted a review of the security plan changes to evaluate for potential decrease in safeguards effectiveness of the security plan. However, this review does not constitute formal NRC approval of the changes. Therefore, these changes remain subject to future NRC inspection in their entirety.
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification
The inspectors verified licensee performance indicators submittals listed below:
PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)
=
- (1) The inspectors reviewed Performance Indicator data from 3rd quarter 2019 through 2nd quarter
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On July 23, 2020, the inspectors presented the security baseline inspection results to Mr. Paul Swift and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
4304174
294680
271390
4301680
4308104
Corrective Action
Documents
Resulting from
Inspection
4358311
NRC observation - Spare vital key/core accountability
07/22/2020
Procedures
Exelon Security Search Processes
Revision 37
SY-GI-101-119-F-
Material Search Officer Checklist
Revision 3
SY-GI-101-119-F-
Vehicle Escort Officer Checklist
Revision 1
Drawings
11-1066-000
CAS Drawling
08/04/1978
Procedures
Testing Security Equipment
Revision 22
SY-AA-101-122-
1001
Performance of Security System Tests
Revision 13
SY-AA-101-122-
1001-F-01
Special Purpose Detector Test Log
Revision 3
SY-AA-101-122-
1001-F-03
Lighting Test Log
Revision 1
Operation of the Security Control Centers
Revision 15
Safety / Security Interface
Revision 6
SY-GI-101-102-
1001
Site Specific Security System Component Degradation
Compensatory Measures
Revision 11
Corrective Action
Documents
Resulting from
Inspection
4358200
NRC ID - Weapons Preemption Records
07/22/2020
Procedures
Avon Protective Respirator
Revision 1
Nuclear Security Training Program
Revision 5
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Firearms Practice Range Management
Revision 1
Exelon Nuclear Security Training
Revision 1
Security Drills and Exercises
Revision 0
Exelon Nuclear Security OJT Program
Revision 1
Exelon Nuclear Security Physical Fitness Test Development,
Approval & Conduct
Revision 1
SY-GI-1000
Firearms Background Check
Revision 1
Miscellaneous
Ginna AVERT Baseline - Modification Analysis for Defensive
Strategy Optimization Project
11/05/2019
- R.E. Ginna Nuclear Power Plant Security Plan, Training and
Qualification Plan, Safeguards Contingency Plan, and
Independent Spent Fuel Storage Installation Security
Program
Revision 12
Procedures
SY-GI-101-501
Station Security Defensive Strategy Procedure
Revision 12
71151
Procedures
Monthly Data Elements for NRC Protected Area Security
Equipment Performance Index
Revision 4
Security Events and Nuclear Regulatory Commission
Performance Indicators
Revision 9