July 30, 2020

SUBJECT:

R. E. GINNA NUCLEAR POWER PLANT - SECURITY BASELINE INSPECTION REPORT 05000244/2020402

Dear Mr. Hanson:

On July 23, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at R. E. Ginna Nuclear Power Plant and discussed the results of this inspection with Mr. Paul Swift and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, X /RA/

Signed by: Fred L. Bower

Fred L. Bower, III, Chief Plant Support Branch Division of Reactor Safety

Docket No. 05000244 License No. DPR-18

Enclosure:

As stated

Inspection Report

Docket Number:

05000244

License Number:

DPR-18

Report Number:

05000244/2020402

Enterprise Identifier: I-2020-402-0004

Licensee:

Exelon Nuclear

Facility:

R. E. Ginna Nuclear Power Plant

Location:

Ontario, NY

Inspection Dates:

July 20, 2020 to July 23, 2020

Inspectors:

K. Hussar, Physical Security Inspector

S. McCarver, Physical Security Inspector

J. Rey, Physical Security Inspector

Approved By:

Fred L. Bower, III, Chief

Plant Support Branch

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at R. E. Ginna Nuclear Power Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:

http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), regional inspectors were directed to begin teleworking. The inspection documented below was completed through a combination of remote and on-site inspection.

SAFEGUARDS

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the following

===inspection elements:

Access Control===

(1)

  • Tier I: All Requirements
  • Tier II: 8 Requirements (02.06 a - c, 02.08 a, b, c, f, i)
  • Tier III: 1 Requirement (02.09)

71130.04 - Equipment Performance, Testing, and Maintenance

The inspectors evaluated the security equipment testing and maintenance program. The following elements were evaluated from this IP.

Equipment Performance, Testing, and Maintenance (1 Sample)

(1)

  • Tier I: All Requirements
  • Tier II: 4 Requirements (02.09 a, 02.10 a, 02.11 a, 02.12 a)
  • Tier III: 2 Requirements (02.15 a, b)

71130.07 - Security Training

The inspectors evaluated the security training program through completion of the following

===procedure elements:

Security Training===

(1)

  • Tier I: All Requirements
  • Tier II: 6 Requirements (02.05 a, - d, 02.06 b, 02.09 b)
  • Tier III: 5 Requirements (02.13 a - b, 02.14 a - c)

71130.09 - Security Plan Changes

The inspectors evaluated the security plan changes through completion of the following procedure elements:

Review Security Plan Changes (IP Section 02.01) (1 Sample)

(1) Since the last NRC inspection of this program area, Security Plan Revision 12 was implemented based on your determination, in accordance with 10 CFR 50.54(p)(2),that the changes resulted in no decrease in safeguards effectiveness of the security plan, and that the revised security plan changed continues to meet the requirements of 10 CFR 73.55(b). The inspectors conducted a review of the security plan changes to evaluate for potential decrease in safeguards effectiveness of the security plan. However, this review does not constitute formal NRC approval of the changes. Therefore, these changes remain subject to future NRC inspection in their entirety.

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)

=

(1) The inspectors reviewed Performance Indicator data from 3rd quarter 2019 through 2nd quarter

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On July 23, 2020, the inspectors presented the security baseline inspection results to Mr. Paul Swift and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.02

Corrective Action

Documents

4304174

294680

271390

4301680

4308104

Corrective Action

Documents

Resulting from

Inspection

4358311

NRC observation - Spare vital key/core accountability

07/22/2020

Procedures

SY-AA-101-112

Exelon Security Search Processes

Revision 37

SY-GI-101-119-F-

Material Search Officer Checklist

Revision 3

SY-GI-101-119-F-

Vehicle Escort Officer Checklist

Revision 1

71130.04

Drawings

11-1066-000

CAS Drawling

08/04/1978

Procedures

SY-AA-101-122

Testing Security Equipment

Revision 22

SY-AA-101-122-

1001

Performance of Security System Tests

Revision 13

SY-AA-101-122-

1001-F-01

Special Purpose Detector Test Log

Revision 3

SY-AA-101-122-

1001-F-03

Lighting Test Log

Revision 1

SY-AA-101-124

Operation of the Security Control Centers

Revision 15

SY-AA-500-127

Safety / Security Interface

Revision 6

SY-GI-101-102-

1001

Site Specific Security System Component Degradation

Compensatory Measures

Revision 11

71130.07

Corrective Action

Documents

Resulting from

Inspection

4358200

NRC ID - Weapons Preemption Records

07/22/2020

Procedures

SY-AA-1037

Avon Protective Respirator

Revision 1

SY-AA-150

Nuclear Security Training Program

Revision 5

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

SY-AA-150-1009

Firearms Practice Range Management

Revision 1

SY-AA-150-101

Exelon Nuclear Security Training

Revision 1

SY-AA-150-102

Security Drills and Exercises

Revision 0

SY-AA-150-104

Exelon Nuclear Security OJT Program

Revision 1

SY-AA-150-105

Exelon Nuclear Security Physical Fitness Test Development,

Approval & Conduct

Revision 1

SY-GI-1000

Firearms Background Check

Revision 1

71130.09

Miscellaneous

Ginna AVERT Baseline - Modification Analysis for Defensive

Strategy Optimization Project

11/05/2019

R.E. Ginna Nuclear Power Plant Security Plan, Training and

Qualification Plan, Safeguards Contingency Plan, and

Independent Spent Fuel Storage Installation Security

Program

Revision 12

Procedures

SY-GI-101-501

Station Security Defensive Strategy Procedure

Revision 12

71151

Procedures

LS-AA-2160

Monthly Data Elements for NRC Protected Area Security

Equipment Performance Index

Revision 4

SY-AA-101-155

Security Events and Nuclear Regulatory Commission

Performance Indicators

Revision 9