Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML030590219 | 15 February 2003 | Long Range Planning Program (Lrpp) Annual Update of Integrated Schedule ABC Project Listing | Eddy Current Testing |
ML030650716 | 25 February 2003 | Special Report Per Technical Specification 5.6.6., Problem Investigation Process No.: 0-03-0154, 0-03-0415 | Post Accident Monitoring |
ML031200039 | 24 April 2003 | TRM-U1, Technical Requirements Manual, Change No. 006-R1 | Boric Acid Time of Discovery Shutdown Margin Emergency Lighting Stress corrosion cracking Earthquake Fire Protection Program Overspeed trip Operational leakage |
ML032040061 | 15 July 2003 | Unit - Pressure/Temperature Limits Report, Revision 4 | Hydrostatic |
ML032660132 | 7 August 2003 | Update 5 of the Post-Defueling Monitored Storage Safety Analysis Report | Earthquake |
ML032660252 | 22 September 2003 | Results of Crystal River SDP Phase 2 Notebook Benchmarking Visit | Internal Flooding Probabilistic Risk Assessment Significance Determination Process |
ML032731557 | 29 September 2003 | Technical Letter Report on the Third 10-Year Interval Inservice Inspection Request for Relief Nos. 02-004 and 02-005 for Oconee Nuclear Station, Unit 1 | Hydrostatic VT-2 Incorporated by reference Dissimilar Metal Weld |
ML033440453 | 7 November 2003 | Human Reliability Screening Analysis ANO Fire Issue | |
ML033520008 | 3 September 1997 | CRC Depletion Calculations for the Rodded Assemblies in Batches 10 and 11 of Crystal River Unit 3 | Fuel cladding |
ML033580411 | 21 November 2003 | Sensitivity Analysis | Safe Shutdown |
ML033580447 | 28 January 2002 | ANO Backfit Analysis | Safe Shutdown Backfit |
ML040260397 | 14 August 2003 | WDI-TJ-001-02-NP, Rev 2, Detection of Reactor Head Base Metal Loss from Inside the CRDM Penetration. | Boric Acid |
ML040410064 | 14 August 2003 | Item List Report | Safe Shutdown Fire Barrier |
ML040420140 | 14 August 2003 | WDI-TJ-006-03-NP, Rev. 3, Ultrasonic Testing of Interference Fit Samples for Leak Path Detection. | |
ML040860258 | 11 November 2003 | to A2-ME-2003-001-1, Aging Management Review of Nonsafety-Related Systems and Components Affecting Safety-Related Systems. | Boric Acid Fire Barrier High Energy Line Break Aging Management Flow Accelerated Corrosion Feedwater Heater License Renewal Earthquake |
ML041070390 | 13 February 2004 | Arkansas Unit 2, 10 CFR 50.59 Summary Report | Boric Acid Temporary Modification |
ML041170403 | 15 April 2004 | Biennial 10 CFR 50.59 and Commitment Revision Report for 2002 and 2003 | Safe Shutdown Control Room Habitability |
ML041200068 | 23 April 2002 | to ER-ANO-2002-0534-000, Evaluation of 2D11 Performance Discharge Test. | |
ML041550786 | 29 February 2004 | FRA-ANP Document No. 77-5038568-00, LBB Evaluation of the Core Flood and Low Pressure Injection/Decay Heat Removal Piping Systems for Oconee Unit 3. | Safe Shutdown Earthquake Finite Element Analysis High Energy Line Break Intergranular Stress Corrosion Cracking Stress corrosion cracking License Renewal Pressure Boundary Leakage Unidentified leakage Water hammer |
ML042960391 | 15 October 2004 | ORNL/NRC/LTR-04/18, Electronic Archival of the Results of Pressurized Thermal Shock Analyses for Beaver Valley, Oconee, and Palisades Reactor Pressure Vessels Generated with the 04.1 Version of Favor. | License Renewal |
ML043550271 | 31 March 2004 | CTRS-Report, Thermal - Hydraulic Uncertainty Analysis in Pressurized Thermal Shock Risk Assessment. | Loop seal Probabilistic Risk Assessment Feedwater Heater Earthquake |
ML050560037 | 8 February 2005 | 12-5023272-01, Risk Assessment for Alternate STS End States. | Safe Shutdown Boric Acid Shutdown Margin Ultimate heat sink Mission time Time to boil Probabilistic Risk Assessment Operator Manual Action Offsite Circuit |
ML050770254 | 15 March 2005 | PSC Precision Surveillance Corporation, 30th Year Surveillance of the Post-Tensioning System at the Three Mile Island Unit 1 Containment Building, 2004, Volume I of III | |
ML050770265 | 15 March 2005 | PSC Precision Surveillance Corporation, Thirtieth Year Surveillance of the Post-Tensioning System at the Three Mile Island Unit 1 Containment Building, 2004, Volume II of III | |
ML050770271 | 15 March 2005 | PSC Precision Surveillance Corporation, Thirtieth Year Surveillance of the Post-Tensioning System at the Three Mile Island Unit 1 Containment Building, 2004, Volume III of III | |
ML050840393 | 31 July 2003 | Final Report, Post-Fire Manual Action Feasibility Assessment: a Phase 3 Significance Determination Process (SDP) Evaluation of Arkansas Nuclear One Unit 1 | Hot Short Safe Shutdown Probabilistic Risk Assessment Emergency Lighting Significance Determination Process Thermoset Cable Tray Ignition Fire Protection Program Fire Watch |
ML050840404 | 17 March 2005 | Holtec Report No. HI-2053369, Justification for ANO Exemption Request for Loading of Damaged Fuel. | Exemption Request Earthquake Fuel cladding |
ML050900176 | 28 May 2002 | Fire Hazard Analysis for Fire Zone 98-J, Emergency Diesel Generator Corridor and Fire Zone 99-M, North Electrical Switchgear Room, Arkansas Nuclear One, Unit 1 | Hot Short Safe Shutdown Fire Barrier Probabilistic Risk Assessment Significance Determination Process Thermoset Fire Protection Program |
ML051170029 | 20 June 2005 | Report of NRC Staff Comments on NEI 04-01, Revision D, Draft Guideline for Combined License Applicants Under 10 CFR Part 52 | Fitness for Duty |
ML051300624 | 3 May 2005 | Draft ECR #02-01121, Rev. 2, Inspection Acceptance Criteria and Leakage Assessment Methodology for TMI OTSG Kinetic Expansion Examinations. | Shutdown Margin Non-Destructive Examination Finite Element Analysis Stress corrosion cracking Flow Induced Vibration GOTHIC Eddy Current Test |
ML051640307 | 22 July 2005 | Third 10-Year Interval Inservice Inspection Program Plan Requests for Relief 04-ON-002 and 04-ON-003 | Incorporated by reference Liquid penetrant Dissimilar Metal Weld Scaffolding |
ML052230371 | 8 August 2005 | Attachment 2, HI-2043262NP, Rev 0 - Part 50 Criticality Analysis of the MPC-32 for ANO Unit 2, Holtec Project No: 1104, Report Class Safety Related | Affidavit Depleted uranium |
ML052570452 | 22 August 2005 | (TMI-2), Update 6 of the Post-Defueling Monitored Storage Safety Analysis Report | Tritium Exit Sign Grab sample Emergency Lighting Decommissioning Funding Plan |
ML052940347 | 14 October 2005 | Additional Information Regarding Kinetic Expansion Inspection and Repair Criteria | Shutdown Margin Non-Destructive Examination Finite Element Analysis Stress corrosion cracking Eddy Current Testing Flow Induced Vibration GOTHIC |
ML060940604 | 22 July 1998 | Confirmatory Action Letter 97-7-001 Technical Evaluation | Non-Destructive Examination Nondestructive Examination Liquid penetrant |
ML062220442 | 10 August 2006 | Holtec Report HI-2022867 Spent Fuel Pool Racks Modifications with Poison Material Inserts in ANO Unit 1 for Entergy. | High Radiation Area Nondestructive Examination Control of Heavy Loads Fuel cladding Depleted uranium |
ML063460131 | 7 December 2006 | Attachment 11, Exelon/Amergen Response to the Request for Additional Information, EP-EAL-0611, Criteria for Choosing Containment Radiation Monitor Reading Indicative Loss of the RCS Barrier | Deep Dose Equivalent Fuel cladding |
ML071000257 | 26 March 2007 | Attachment 5 - HI-2063601, Holtec Licensing Report for ANO Unit 2 Partial Rerack, (non-propriety) | Boric Acid Safe Shutdown Earthquake Coatings Operating Basis Earthquake Nondestructive Examination Foreign Material Exclusion Earthquake Control of Heavy Loads Fuel cladding Affidavit Depleted uranium |
ML071370352 | 8 May 2007 | Stress Analysis Summary Report, Pressurizer and Reactor Coolant Hot Leg Weld Overlays | Weld Overlay Nondestructive Examination Stress corrosion cracking Dissimilar Metal Weld |
ML071650168 | 1 April 1999 | NEI Report: RCP Lube Oil Collection System Current Trend Abstract, April 1999 (Revision 1) | Safe Shutdown Safe Shutdown Earthquake Hydrostatic Emergency Lighting Exemption Request Earthquake Fire Protection Program Fire Watch |
ML073551166 | 20 December 2007 | NEI 07-12, Fire Probabilistic Risk Assessment (Fpra) Peer Review Process Guidelines Draft Version F, Rev. 0. | Safe Shutdown Probabilistic Risk Assessment Large early release frequency |
ML080230484 | 14 January 2008 | Evaluation of 2002 USGS National Seismic Hazard Assessment, Final Report | Earthquake |
ML080230485 | 14 January 2008 | Evaluation of 2002 USGS National Seismic Hazard Assessment, Final Report | Earthquake |
ML080510367 | 27 March 2008 | NRC Staff Questions for October 31, 2007 Phone Call with Alion | Boric Acid Coatings |
ML080510382 | 27 March 2008 | NRC Staff Questions Reformatted Into Three Topical Areas | Coatings |
ML080510657 | 11 February 2008 | NRC Staff Questions with Problem Statements | Boric Acid Mission time Coatings |
ML080940639 | 10 April 2008 | Preliminary Results of the NRC Staff Review of the Fire Probabilistic Risk Assessment Model to Support Implementation of National Fire Protection Association Standard NFPA-805, Performance Based Standard for Fire.. | Hot Short Safe Shutdown Fire Barrier Probabilistic Risk Assessment Coatings Incorporated by reference High Energy Line Break Thermoset Large early release frequency Earthquake Fire Protection Program Scaffolding Exclusive Use Loss of condenser vacuum |
ML082190013 | 7 August 2008 | Monthly Operating Reports Second Quarter 2008 | Reserve Station Service Transformer Feedwater Heater Power change Downpower Power Uprate Overspeed trip |
ML082560178 | 10 September 2008 | Response to NRC Request for Additional Information Related to Three Mile Island Nuclear Station, Unit 1, License Renewal Application | Aging Management Intergranular Stress Corrosion Cracking Stress corrosion cracking License Renewal Dissimilar Metal Weld Power change Power Uprate Stretch Power Uprate |
ML082880301 | 14 October 2008 | TMI-1 SEIS Nonradiological Waste Web References | Grab sample Enforcement Discretion Coatings Incorporated by reference Excess Flow Check Valve Moisture barrier Earthquake |