Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20117J307 | 31 May 1983 | Evaluation of Hatch Nuclear Plant,Georgia Power Co | |
ML20117J322 | 31 July 1982 | Ctr,Iowa Electric Light & Power Co, 1981 Evaluation | |
ML20117J357 | 31 July 1981 | Evaluation of Oconee Nuclear Power Station | Fuel cladding |
ML20117J364 | 31 January 1983 | Evaluation of Oconee Nuclear Station,Duke Power Co | |
ML20117J411 | 30 November 1982 | 1982 Evaluation Calvert Cliffs Nuclear Power Plant,Bg&E | |
ML20117J446 | 28 February 1982 | Evaluation Rept Feb 1982,McGuire Nuclear Station,Duke Power Co | |
ML20117J469 | 31 December 1982 | Plant,Tva, 1982 Evaluation | |
ML20117J489 | 31 July 1981 | Cp&L,Evaluation Rept Jul 1981 | |
ML20117J596 | 31 December 1982 | 1982 Evaluation Beaver Valley Power Station,Duquesne Light Co | |
ML20117J639 | 31 December 1982 | 1982 Evaluation DC Cook Nuclear Plant,Indiana & Michigan Electric Co | |
ML20125E566 | 31 March 1992 | Nonproprietary PWR SG Tube Repair Limits:Technical Support Document for Expansion Zone PWSCC in Roll Transitions Final Rept | Anticipated operational occurrence Nondestructive Examination |
ML20126A799 | 31 January 1980 | Effects of High Energy Piping Sys Break Inside Containment, SEP Topic III-5.A | Safe Shutdown Boric Acid |
ML20126H603 | 11 January 1985 | Const Self Assessment Corrective Action Evaluation | Fire Barrier |
ML20127D594 | 31 March 1978 | Hanford 2, Progress Rept 80 for Mar 1978 | Coatings |
ML20127J539 | 30 November 1992 | Connecticut Yankee Structural Reevaluation of Plant Structures to Address SEP Topic III-7.B Load Combinations Code Changes | Safe Shutdown Tornado Missile Safe Shutdown Earthquake Internal Flooding Hydrostatic Operating Basis Earthquake Tornado Generated Missile Tornado Missile Protection Earthquake |
ML20128N237 | 30 June 1984 | Preliminary Idcor Task 23.1 - Integrated Containment Analysis | Probabilistic Risk Assessment |
ML20129H546 | 30 June 1985 | Value Impact of Implementing Leak-Before-Break & Elimination of Associated Pipe Whip Restraint & Jet Deflectors on RCS Primary Loop | Exemption Request Scaffolding |
ML20133C005 | 6 September 1985 | Final Rept,Connecticut Yankee Plant Design Change External Review Group | Design basis earthquake |
ML20133G247 | 30 September 1985 | Cancer Mortality & Morbidity (Incidence) Around Tmi | |
ML20133M162 | 10 April 1970 | Review of Seismic Design Criteria for Beaver Valley Power Station | Operating Basis Earthquake Design basis earthquake Earthquake |
ML20133M428 | 14 June 1979 | Engineering Svc Scope of Work for Piping Sys Analysis, Surry Power Station - Unit 2,VEPCO | Design basis earthquake Earthquake |
ML20133M699 | 28 June 1968 | Rept to AEC Regulatory Staff:On Adequacy of Structural Criteria for Maine Yankee Atomic Power Station,Maine Yankee Atomic Power Co | Safe Shutdown Hydrostatic Operating Basis Earthquake Design basis earthquake Earthquake |
ML20133M737 | 18 June 1971 | Review of Seismic Analysis & Design for Maine Yankee Power Station | Hydrostatic Earthquake |
ML20134A300 | 15 October 1985 | Nuclear Safety & Compliance Committee Rept 3 to Gpu Nuclear Board of Directors for Apr-Sept 1985 | |
ML20134B080 | 31 January 1982 | Special Mgt Rept:Marble Hill Nuclear Project | |
ML20134E158 | 28 February 1984 | Containment Integrity at Surry Nuclear Power Station | Earthquake |
ML20134L238 | 19 December 1996 | Rev 0 to Accident Analysis | Anticipated operational occurrence |
ML20134L248 | 30 December 1996 | Rev 0 to Sys Needed for Decommissioning Sys Evaluation Process | Boric Acid |
ML20134L259 | 31 December 1996 | Rev 0 to Sys Reclassification | |
ML20134L272 | 31 December 1996 | Commitment Mgt Grpi | |
ML20134L275 | 3 February 1997 | Draft Rev to GPRI-30, Spent Fuel Storage Facility Licensing Basis/Design Basis | |
ML20134L284 | 23 December 1996 | Rev 0 to Spent Fuel Pool Island Studies | |
ML20134L287 | 19 December 1996 | Rev 0 to Grpi for Defueled Condition Fire Protection Technical Requirements | Safe Shutdown Hydrostatic Continuous fire watch Fire Protection Program Fire Watch |
ML20134L291 | 8 January 1997 | Rev 0 to UFSAR Rev Grpi | |
ML20134N819 | 31 August 1984 | Vol I to Administrative Controls Assessment Concerning Coating Controls at North Anna & Surry Power Stations | Boric Acid Coatings |
ML20135E271 | 26 December 1996 | Evaluation of Intakes by Two Workers at CT Yankee Atomic Power Co | |
ML20135E322 | 13 February 1997 | Independent Review Team Rept 1996 MP -1 Lout NRC Exam Failures | Condition Adverse to Quality Grace period |
ML20135F365 | 26 July 1985 | Draft Connecticut Yankee Plant Design Change Task Group, Final Rept | Boric Acid Temporary Modification Design basis earthquake |
ML20135F370 | 23 July 1985 | Review of Design Change Process | Nondestructive Examination Temporary Modification Fire Protection Program |
ML20135F374 | 19 July 1985 | Plant Design Change Evaluations | Safe Shutdown Boric Acid Tornado Missile Safe Shutdown Earthquake Design basis earthquake |
ML20135F385 | 8 May 1985 | Screening of Plant Design Changes | Boric Acid |
ML20136B278 | 3 December 1981 | Design Verification Program Seismic Svc-Related Contracts Prior to June 1978 | Safe Shutdown Earthquake |
ML20136B336 | 15 April 1982 | Comments on Rf Reedy,Inc,Qa Audit Rept on Safety-Related Activities Performed by PG&E Prior to June 1978 | Backfit |
ML20137C628 | 14 March 1997 | Redacted Version of Rev 1 to Nuclear Training Loit/Lout Audit Reviews | |
ML20137H303 | 31 March 1997 | Rev 2 to Nuclear Training Loit/Lout Audit Reviews | Power change |
ML20137X532 | 31 March 1982 | Assessment of Findings in Quadrex Corp Rept Dtd May 1981 | Safe Shutdown Safe Shutdown Earthquake Battery sizing Earthquake |
ML20138B156 | 31 March 1986 | Permanent Exemptions Re Types a & C Leak Testing | Exemption Request Fire Protection Program |
ML20138B183 | 31 March 1986 | Schedular Exemption Requests Re Type C Leak Testing | Probabilistic Risk Assessment Exemption Request |
ML20138B200 | 31 March 1986 | Status of Containment Integrated Leak Rate Test Program | |
ML20138S003 | 29 October 1985 | Rev 5 to Policy Statement Delineating Requirements & Procedures Re Emergency Plan & Procedures |