Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML20117J30731 May 1983Evaluation of Hatch Nuclear Plant,Georgia Power Co
ML20117J32231 July 1982Ctr,Iowa Electric Light & Power Co, 1981 Evaluation
ML20117J35731 July 1981Evaluation of Oconee Nuclear Power StationFuel cladding
ML20117J36431 January 1983Evaluation of Oconee Nuclear Station,Duke Power Co
ML20117J41130 November 19821982 Evaluation Calvert Cliffs Nuclear Power Plant,Bg&E
ML20117J44628 February 1982Evaluation Rept Feb 1982,McGuire Nuclear Station,Duke Power Co
ML20117J46931 December 1982Plant,Tva, 1982 Evaluation
ML20117J48931 July 1981Cp&L,Evaluation Rept Jul 1981
ML20117J59631 December 19821982 Evaluation Beaver Valley Power Station,Duquesne Light Co
ML20117J63931 December 19821982 Evaluation DC Cook Nuclear Plant,Indiana & Michigan Electric Co
ML20125E56631 March 1992Nonproprietary PWR SG Tube Repair Limits:Technical Support Document for Expansion Zone PWSCC in Roll Transitions Final ReptAnticipated operational occurrence
Nondestructive Examination
ML20126A79931 January 1980Effects of High Energy Piping Sys Break Inside Containment, SEP Topic III-5.ASafe Shutdown
Boric Acid
ML20126H60311 January 1985Const Self Assessment Corrective Action EvaluationFire Barrier
ML20127D59431 March 1978Hanford 2, Progress Rept 80 for Mar 1978Coatings
ML20127J53930 November 1992Connecticut Yankee Structural Reevaluation of Plant Structures to Address SEP Topic III-7.B Load Combinations Code ChangesSafe Shutdown
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Hydrostatic
Operating Basis Earthquake
Tornado Generated Missile
Tornado Missile Protection
Earthquake
ML20128N23730 June 1984Preliminary Idcor Task 23.1 - Integrated Containment AnalysisProbabilistic Risk Assessment
ML20129H54630 June 1985Value Impact of Implementing Leak-Before-Break & Elimination of Associated Pipe Whip Restraint & Jet Deflectors on RCS Primary LoopExemption Request
Scaffolding
ML20133C0056 September 1985Final Rept,Connecticut Yankee Plant Design Change External Review GroupDesign basis earthquake
ML20133G24730 September 1985Cancer Mortality & Morbidity (Incidence) Around Tmi
ML20133M16210 April 1970Review of Seismic Design Criteria for Beaver Valley Power StationOperating Basis Earthquake
Design basis earthquake
Earthquake
ML20133M42814 June 1979Engineering Svc Scope of Work for Piping Sys Analysis, Surry Power Station - Unit 2,VEPCODesign basis earthquake
Earthquake
ML20133M69928 June 1968Rept to AEC Regulatory Staff:On Adequacy of Structural Criteria for Maine Yankee Atomic Power Station,Maine Yankee Atomic Power CoSafe Shutdown
Hydrostatic
Operating Basis Earthquake
Design basis earthquake
Earthquake
ML20133M73718 June 1971Review of Seismic Analysis & Design for Maine Yankee Power StationHydrostatic
Earthquake
ML20134A30015 October 1985Nuclear Safety & Compliance Committee Rept 3 to Gpu Nuclear Board of Directors for Apr-Sept 1985
ML20134B08031 January 1982Special Mgt Rept:Marble Hill Nuclear Project
ML20134E15828 February 1984Containment Integrity at Surry Nuclear Power StationEarthquake
ML20134L23819 December 1996Rev 0 to Accident AnalysisAnticipated operational occurrence
ML20134L24830 December 1996Rev 0 to Sys Needed for Decommissioning Sys Evaluation ProcessBoric Acid
ML20134L25931 December 1996Rev 0 to Sys Reclassification
ML20134L27231 December 1996Commitment Mgt Grpi
ML20134L2753 February 1997Draft Rev to GPRI-30, Spent Fuel Storage Facility Licensing Basis/Design Basis
ML20134L28423 December 1996Rev 0 to Spent Fuel Pool Island Studies
ML20134L28719 December 1996Rev 0 to Grpi for Defueled Condition Fire Protection Technical RequirementsSafe Shutdown
Hydrostatic
Continuous fire watch
Fire Protection Program
Fire Watch
ML20134L2918 January 1997Rev 0 to UFSAR Rev Grpi
ML20134N81931 August 1984Vol I to Administrative Controls Assessment Concerning Coating Controls at North Anna & Surry Power StationsBoric Acid
Coatings
ML20135E27126 December 1996Evaluation of Intakes by Two Workers at CT Yankee Atomic Power Co
ML20135E32213 February 1997Independent Review Team Rept 1996 MP -1 Lout NRC Exam FailuresCondition Adverse to Quality
Grace period
ML20135F36526 July 1985Draft Connecticut Yankee Plant Design Change Task Group, Final ReptBoric Acid
Temporary Modification
Design basis earthquake
ML20135F37023 July 1985Review of Design Change ProcessNondestructive Examination
Temporary Modification
Fire Protection Program
ML20135F37419 July 1985Plant Design Change EvaluationsSafe Shutdown
Boric Acid
Tornado Missile
Safe Shutdown Earthquake
Design basis earthquake
ML20135F3858 May 1985Screening of Plant Design ChangesBoric Acid
ML20136B2783 December 1981Design Verification Program Seismic Svc-Related Contracts Prior to June 1978Safe Shutdown
Earthquake
ML20136B33615 April 1982Comments on Rf Reedy,Inc,Qa Audit Rept on Safety-Related Activities Performed by PG&E Prior to June 1978Backfit
ML20137C62814 March 1997Redacted Version of Rev 1 to Nuclear Training Loit/Lout Audit Reviews
ML20137H30331 March 1997Rev 2 to Nuclear Training Loit/Lout Audit ReviewsPower change
ML20137X53231 March 1982Assessment of Findings in Quadrex Corp Rept Dtd May 1981Safe Shutdown
Safe Shutdown Earthquake
Battery sizing
Earthquake
ML20138B15631 March 1986Permanent Exemptions Re Types a & C Leak TestingExemption Request
Fire Protection Program
ML20138B18331 March 1986Schedular Exemption Requests Re Type C Leak TestingProbabilistic Risk Assessment
Exemption Request
ML20138B20031 March 1986Status of Containment Integrated Leak Rate Test Program
ML20138S00329 October 1985Rev 5 to Policy Statement Delineating Requirements & Procedures Re Emergency Plan & Procedures