Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
PNO-V-85-056, on 850829,reactor Tripped from 4% Power.Caused by Low Steam Generator Level Concurrent W/Steam Flow/ Feedwater Flow Mismatch During Surveillance Testing. Licensee Investigating Potential Equipment Problems | 29 August 1985 | PNO-V-85-056:on 850829,reactor Tripped from 4% Power.Caused by Low Steam Generator Level Concurrent W/Steam Flow/ Feedwater Flow Mismatch During Surveillance Testing. Licensee Investigating Potential Equipment Problems | |
PNO-V-85-060, on 850919,NOAA Pacific Tsunami Warning Ctr Issued Tsunami Watch Bulletin.Caused by Earthquake Northwest of Acapulco,Mexico.Watch Terminated | 19 September 1985 | PNO-V-85-060:on 850919,NOAA Pacific Tsunami Warning Ctr Issued Tsunami Watch Bulletin.Caused by Earthquake Northwest of Acapulco,Mexico.Watch Terminated | Earthquake |
PNO-V-85-064, on 850928,reactor Achieved Criticality.Plant in Cold Shutdown Since 850623 Due to 1-inch Diameter Hot Leg Vent Piping Failure.Exams of Other Piping Sys & Supports Completed.Plant at 40% Power | 1 October 1985 | PNO-V-85-064:on 850928,reactor Achieved Criticality.Plant in Cold Shutdown Since 850623 Due to 1-inch Diameter Hot Leg Vent Piping Failure.Exams of Other Piping Sys & Supports Completed.Plant at 40% Power | |
PNO-V-85-066, on 851002,loss of Main Feedwater Event Occurred.Plant Being Maintained in Hot Shutdown Condition Pending Determination of Exact Scenario,Causes & Appropriate Corrective Action.Region Evaluating Response | 2 October 1985 | PNO-V-85-066:on 851002,loss of Main Feedwater Event Occurred.Plant Being Maintained in Hot Shutdown Condition Pending Determination of Exact Scenario,Causes & Appropriate Corrective Action.Region Evaluating Response | |
PNO-V-85-071, on 851007,one of Two Auxiliary Feedwater Pumps Declared Inoperable Due to Failure of Pump Thrust Bearing. Caused by Disintegrated Thrust Bearing Due to Inadequate Lubrication.Bearing Replaced | 9 October 1985 | PNO-V-85-071:on 851007,one of Two Auxiliary Feedwater Pumps Declared Inoperable Due to Failure of Pump Thrust Bearing. Caused by Disintegrated Thrust Bearing Due to Inadequate Lubrication.Bearing Replaced | |
PNO-V-85-074, on 851030,cold Shutdown Occurred.Caused by Condenser Tube Leak.Leak Location Not Determined.Plans to Drain & Refill Steam Generators Underway | 31 October 1985 | PNO-V-85-074:on 851030,cold Shutdown Occurred.Caused by Condenser Tube Leak.Leak Location Not Determined.Plans to Drain & Refill Steam Generators Underway | |
PNO-V-85-075, on 851102,plant Attained Criticality & Commenced Power Operation on 851103.Plant Has Been Shut Down Since 851002 Due to Loss of Main Feedwater Event | 4 November 1985 | PNO-V-85-075:on 851102,plant Attained Criticality & Commenced Power Operation on 851103.Plant Has Been Shut Down Since 851002 Due to Loss of Main Feedwater Event | |
PNO-V-85-079, on 851126,safety Injection Occurred on High Steam Flow Signal.Cause Under Investigation.Plant Stabilized & Maintaining Hot Standby Conditions.Licensee Plans to Evaluate Data & Make Appropriate Adjustments | 27 November 1985 | PNO-V-85-079:on 851126,safety Injection Occurred on High Steam Flow Signal.Cause Under Investigation.Plant Stabilized & Maintaining Hot Standby Conditions.Licensee Plans to Evaluate Data & Make Appropriate Adjustments | |
PNO-V-85-080, on 851128,oscillation of Steam Flow Resulted in Reactor Trip Due to Completion of Steam Generator Low Level Coincident W/Steam Flow/Feedwater Flow Mismatch Logic. Cause Will Be Determined Prior to Resuming Operations | 29 November 1985 | PNO-V-85-080:on 851128,oscillation of Steam Flow Resulted in Reactor Trip Due to Completion of Steam Generator Low Level Coincident W/Steam Flow/Feedwater Flow Mismatch Logic. Cause Will Be Determined Prior to Resuming Operations | |
PNO-V-85-081, on 851201,turbine & Reactor Trips Occurred. Caused by High Steam Generator Level Due to Sluggish Automatic Steam Generator Level Control Sys Response.No Safety Injection or ECCS Activated | 2 December 1985 | PNO-V-85-081:on 851201,turbine & Reactor Trips Occurred. Caused by High Steam Generator Level Due to Sluggish Automatic Steam Generator Level Control Sys Response.No Safety Injection or ECCS Activated | |
PNO-V-85-082, on 851202,low Tide Concurrent W/High Seas Caused Kelp to Be Injected Into Condenser Circulating Water Intake Structure.Control RPI Lost & Reactor Manually Tripped.Cause Under Investigation | 3 December 1985 | PNO-V-85-082:on 851202,low Tide Concurrent W/High Seas Caused Kelp to Be Injected Into Condenser Circulating Water Intake Structure.Control RPI Lost & Reactor Manually Tripped.Cause Under Investigation | |
PNO-V-85-083, on 851205,reactor Tripped from 91% Full Power on High RCS Pressure.Caused by Stuck High Indicating Pin on Feedwater Flow Monitor Causing Operator to Manually Underfeed Both once-through Steam Generators | 6 December 1985 | PNO-V-85-083:on 851205,reactor Tripped from 91% Full Power on High RCS Pressure.Caused by Stuck High Indicating Pin on Feedwater Flow Monitor Causing Operator to Manually Underfeed Both once-through Steam Generators | |
PNO-V-85-087, on 851215,steam Leak Discovered in Room Where Normal Reactor Coolant Makeup Pump Located.Simultaneously, Auxiliary Bldg Radiation Alarm Received.Leak Isolated to Discharge Piping Weld | 16 December 1985 | PNO-V-85-087:on 851215,steam Leak Discovered in Room Where Normal Reactor Coolant Makeup Pump Located.Simultaneously, Auxiliary Bldg Radiation Alarm Received.Leak Isolated to Discharge Piping Weld | |
PNO-V-85-089, on 851222,shutdown Occurred When RCS Leak Detected.Caused by Loose Valve Stem Packing on Pressurizer Sample Line Valve Sfv 70001.Loose Packing Readjusted. Repacking of Valve Planned.Power Will Be Resumed by 851224 | 23 December 1985 | PNO-V-85-089:on 851222,shutdown Occurred When RCS Leak Detected.Caused by Loose Valve Stem Packing on Pressurizer Sample Line Valve Sfv 70001.Loose Packing Readjusted. Repacking of Valve Planned.Power Will Be Resumed by 851224 | |
PNO-V-85-090, on 851226,reactor Trip Occurred Due to Loss of Electrical Power to Integrated Control Sys.Reactor Coolant Pressure Stabilized.Power Restored.Plant Will Go to Cold Shutdown Until Root Cause Analysis Completed | 26 December 1985 | PNO-V-85-090:on 851226,reactor Trip Occurred Due to Loss of Electrical Power to Integrated Control Sys.Reactor Coolant Pressure Stabilized.Power Restored.Plant Will Go to Cold Shutdown Until Root Cause Analysis Completed | |
PNO-V-85-091, on 851225,during Full Load Rejection Test, Reactor Tripped on lo-lo Steam Generator Level & Coolant Pumps Tripped.Caused by over-responsive Turbine Control Sys & under-responsive Steam Dump Sys.Pumps Restarted | 26 December 1985 | PNO-V-85-091:on 851225,during Full Load Rejection Test, Reactor Tripped on lo-lo Steam Generator Level & Coolant Pumps Tripped.Caused by over-responsive Turbine Control Sys & under-responsive Steam Dump Sys.Pumps Restarted | |
PNO-V-85-092, on 851226,reactor Tripped.Caused by Loss of Electrical Power to Integrated Control Sys.Augmented Investigation Team Onsite on 851228 & Completed All Initial Interviews of All Operating Staff as of 851229 | 30 December 1985 | PNO-V-85-092:on 851226,reactor Tripped.Caused by Loss of Electrical Power to Integrated Control Sys.Augmented Investigation Team Onsite on 851228 & Completed All Initial Interviews of All Operating Staff as of 851229 | |
PNO-V-86-001, on 860102,unusual Event Declared When Reactor Tripped on lo-lo Steam Generator Level Following Feedwater Pump Trip.Caused by Reactor Coolant Pumps Tripping on Undervoltage.Pumps Restarted in 3 to 5 Minutes | 3 January 1986 | PNO-V-86-001:on 860102,unusual Event Declared When Reactor Tripped on lo-lo Steam Generator Level Following Feedwater Pump Trip.Caused by Reactor Coolant Pumps Tripping on Undervoltage.Pumps Restarted in 3 to 5 Minutes | |
PNO-V-86-006, on 861031,util Telephone Operator Received Bomb Threat.Only Bldgs Outside Protected Area Evacuated, Since Caller Had Little or No Knowledge of Site Activities | 31 October 1986 | PNO-V-86-006:on 861031,util Telephone Operator Received Bomb Threat.Only Bldgs Outside Protected Area Evacuated, Since Caller Had Little or No Knowledge of Site Activities | |
PNO-V-86-008, on 860219,unusual Event Declared & Hot Shutdown Initiated After Boron Sample Exceeded 2,200 Ppm.Unusual Event Terminated When Primary Std for Boron Analysis Determined to Be Faulty | 20 February 1986 | PNO-V-86-008:on 860219,unusual Event Declared & Hot Shutdown Initiated After Boron Sample Exceeded 2,200 Ppm.Unusual Event Terminated When Primary Std for Boron Analysis Determined to Be Faulty | |
PNO-V-86-010, on 860312,reactor Brought Critical Following Negative Rate Trip During Net Load Startup Test on 860311. Reactor Declared in Commercial Operation on 860313 | 13 March 1986 | PNO-V-86-010:on 860312,reactor Brought Critical Following Negative Rate Trip During Net Load Startup Test on 860311. Reactor Declared in Commercial Operation on 860313 | |
PNO-V-86-011, on 860314,during Main Turbine Testing,Safety Injection & Reactor Trip Occurred from High Steam Flow Signal.Plant Stabilized.Licensee Will Resume Operations Once Event Evaluated & Excess Boron Removed | 14 March 1986 | PNO-V-86-011:on 860314,during Main Turbine Testing,Safety Injection & Reactor Trip Occurred from High Steam Flow Signal.Plant Stabilized.Licensee Will Resume Operations Once Event Evaluated & Excess Boron Removed | |
PNO-V-86-013, on 860330,while Reducing Power Due to Indications of Condenser Tube Rupture,Operator Initiated Manual Unit Trip Resulting in Safety Injection on High Steam Flow & lo-lo Tavg.Caused by Switch Problem & Stuck Valve | 31 March 1986 | PNO-V-86-013:on 860330,while Reducing Power Due to Indications of Condenser Tube Rupture,Operator Initiated Manual Unit Trip Resulting in Safety Injection on High Steam Flow & lo-lo Tavg.Caused by Switch Problem & Stuck Valve | |
PNO-V-86-014, on 860331,earthquake W/Magnitude of 5.3 on Richter Scale Occurred Approx 10 Miles East of Fremont,Ca.No Damage Observed at Research Reactor Facilities.Rancho Seco Did Not Feel Effects of Earthquake | 31 March 1986 | PNO-V-86-014:on 860331,earthquake W/Magnitude of 5.3 on Richter Scale Occurred Approx 10 Miles East of Fremont,Ca.No Damage Observed at Research Reactor Facilities.Rancho Seco Did Not Feel Effects of Earthquake | Earthquake |
PNO-V-86-019, on 860418,unusual Event Declared on Initiation of Shutdown.On 860417,problems W/Computer Info from in-core Instrumentation for Quadrant Power Tilt Ratio Measurement Occurred | 18 April 1986 | PNO-V-86-019:on 860418,unusual Event Declared on Initiation of Shutdown.On 860417,problems W/Computer Info from in-core Instrumentation for Quadrant Power Tilt Ratio Measurement Occurred | |
PNO-V-86-027, on 860505,diesel Generator Unexpectedly Started & Loaded on Vital Bus G Undervoltage Condition.Auxiliary Feeder Breaker Tripped on Overcurrent & Startup Power Feeder Breaker Did Not Close In.Investigation Underway | 7 May 1986 | PNO-V-86-027:on 860505,diesel Generator Unexpectedly Started & Loaded on Vital Bus G Undervoltage Condition.Auxiliary Feeder Breaker Tripped on Overcurrent & Startup Power Feeder Breaker Did Not Close In.Investigation Underway | Offsite Circuit |
PNO-V-86-036, on 860701,Sacramento Bee Newspaper Reported That Smud General Manager,Dk Lowe,Resigned.Divisive Actions of Board of Directors Cited as Reason for Resignation.F Hahn Acting as Interim General Manager | 1 July 1986 | PNO-V-86-036:on 860701,Sacramento Bee Newspaper Reported That Smud General Manager,Dk Lowe,Resigned.Divisive Actions of Board of Directors Cited as Reason for Resignation.F Hahn Acting as Interim General Manager | |
PNO-V-86-038, on 860703,facility Experienced Reactor Trip & Safety Injection Due to Momentary High Steam Flow Coincident w/lo-lo Tavg Signal from solid-state Protection Sys.On 860706,second Turbine & Reactor Trip Experienced | 7 July 1986 | PNO-V-86-038:on 860703,facility Experienced Reactor Trip & Safety Injection Due to Momentary High Steam Flow Coincident w/lo-lo Tavg Signal from solid-state Protection Sys.On 860706,second Turbine & Reactor Trip Experienced | |
PNO-V-86-039, on 860708,earthquake w/6.0 Reading on Richter Scale Actuated Seismic Alarms & Recording Instruments. Procedures for Visual Insp of Plant Equipment & Start Test of Diesel Generators Implemented | 8 July 1986 | PNO-V-86-039:on 860708,earthquake w/6.0 Reading on Richter Scale Actuated Seismic Alarms & Recording Instruments. Procedures for Visual Insp of Plant Equipment & Start Test of Diesel Generators Implemented | Earthquake |
PNO-V-86-040, on 860709,reactor Tripped Due to Low Level in Steam Generator Coincident W/Steam Flow Feed Flow Mismatch. Caused by Loss of Main Feed Pump.Pump Repaired & post-trip Review Conducted | 10 July 1986 | PNO-V-86-040:on 860709,reactor Tripped Due to Low Level in Steam Generator Coincident W/Steam Flow Feed Flow Mismatch. Caused by Loss of Main Feed Pump.Pump Repaired & post-trip Review Conducted | |
PNO-V-86-041, on 860713,earthquake Measuring 5.7 on Richter Scale & Aftershocks Occurred Actuating Seismic Alarms.Insp Procedures Implemented.No Abnormal Condition Noted.Effects Also Felt at Listed Nonpower Reactors | 14 July 1986 | PNO-V-86-041:on 860713,earthquake Measuring 5.7 on Richter Scale & Aftershocks Occurred Actuating Seismic Alarms.Insp Procedures Implemented.No Abnormal Condition Noted.Effects Also Felt at Listed Nonpower Reactors | Earthquake |
PNO-V-86-046, on 860721,two Seismic Events Occurred in Mammoth Lakes Area.Largest Event Measured 6.2 on Richter Scale & Second Measured 4.4.First Event Not Felt at Diablo Canyon.Second Event Triggered Teratec Recording | 21 July 1986 | PNO-V-86-046:on 860721,two Seismic Events Occurred in Mammoth Lakes Area.Largest Event Measured 6.2 on Richter Scale & Second Measured 4.4.First Event Not Felt at Diablo Canyon.Second Event Triggered Teratec Recording | |
PNO-V-86-047, on 860722,licensee Declared Unusual Event Due to Both Trains of Decay Heat Sys Being Declared Inoperable. RCS Temp Was Approx 84 F W/Atmospheric Pressure | 23 July 1986 | PNO-V-86-047:on 860722,licensee Declared Unusual Event Due to Both Trains of Decay Heat Sys Being Declared Inoperable. RCS Temp Was Approx 84 F W/Atmospheric Pressure | |
PNO-V-86-047A, on 860622,both Trains of Decay Heat Sys Declared Inoperable.Caused by Leak on Pump B Casing & Train a Emergency Diesel Out of Svc for Insp.Pump in Standby Condition & Diesel Will Return to Svc in Approx 8 Days | 24 July 1986 | PNO-V-86-047A:on 860622,both Trains of Decay Heat Sys Declared Inoperable.Caused by Leak on Pump B Casing & Train a Emergency Diesel Out of Svc for Insp.Pump in Standby Condition & Diesel Will Return to Svc in Approx 8 Days | |
PNO-V-86-047B, on 860725,licensee Secured from Unusual Event After Establishing Temporary Compensatory Measures.Util Plans to Return Diesel Generator a to Svc by 860730. Replacement for DHR Pump B Procured | 28 July 1986 | PNO-V-86-047B:on 860725,licensee Secured from Unusual Event After Establishing Temporary Compensatory Measures.Util Plans to Return Diesel Generator a to Svc by 860730. Replacement for DHR Pump B Procured | |
PNO-V-86-050, on 860804,Sacramento County Grand Jury Issued Rept of 8-month Investigation Finding Significant Problem W/Drugs & Alcohol Usage on Site.Rept Recommends Further Investigation by District Atty | 5 August 1986 | PNO-V-86-050:on 860804,Sacramento County Grand Jury Issued Rept of 8-month Investigation Finding Significant Problem W/Drugs & Alcohol Usage on Site.Rept Recommends Further Investigation by District Atty | |
PNO-V-86-056, on 860829,first Refueling Outage Began.Work to Include Copper Reduction & court-ordered Replacement of New High Density Fuel Racks W/Older Low Density Fuel Racks | 29 August 1986 | PNO-V-86-056:on 860829,first Refueling Outage Began.Work to Include Copper Reduction & court-ordered Replacement of New High Density Fuel Racks W/Older Low Density Fuel Racks | |
PNO-V-86-057, reactor Trip Occurred.Caused by Loose Wire on Shunt Coil Relay That Shorted During Surveillance Testing & Opened Reactor Trip Breaker.New High Density Fuel Racks Removed & Older Low Density Racks Reinstalled | 29 August 1986 | PNO-V-86-057:reactor Trip Occurred.Caused by Loose Wire on Shunt Coil Relay That Shorted During Surveillance Testing & Opened Reactor Trip Breaker.New High Density Fuel Racks Removed & Older Low Density Racks Reinstalled | |
PNO-V-86-062, court Decided in Favor of San Luis Obispo Mothers for Peace & Sierra Club Re Spent Fuel Pool Expansion.Util Reinstalling Old Racks & May Use Spent Fuel Pools Prior to Completion of New Hearings | 12 September 1986 | PNO-V-86-062:court Decided in Favor of San Luis Obispo Mothers for Peace & Sierra Club Re Spent Fuel Pool Expansion.Util Reinstalling Old Racks & May Use Spent Fuel Pools Prior to Completion of New Hearings | |
PNO-V-86-065, on 860918,reactor Tripped Due to Loss of Main Feedwater Pump 2-2 During Maint on Lovejoy Speed Controller Sys.Caused by Steam Flow/Feed Flow Mismatch Coincident W/Low Level on Steam Generators 2 & 4.Cause Under Investigation | 18 September 1986 | PNO-V-86-065:on 860918,reactor Tripped Due to Loss of Main Feedwater Pump 2-2 During Maint on Lovejoy Speed Controller Sys.Caused by Steam Flow/Feed Flow Mismatch Coincident W/Low Level on Steam Generators 2 & 4.Cause Under Investigation | |
PNO-V-86-067, on 861001,fuel Assembly in Vessel Found W/ 10-degree Tilt & Resting Askew Against Core Baffle Plate. Cause Under Investigation.Program & Special Tools Prepared to Return Assembly to Vertical Position | 1 October 1986 | PNO-V-86-067:on 861001,fuel Assembly in Vessel Found W/ 10-degree Tilt & Resting Askew Against Core Baffle Plate. Cause Under Investigation.Program & Special Tools Prepared to Return Assembly to Vertical Position | Fuel cladding |
PNO-V-86-069, on 861003,DHR Lost for Approx 13 Minutes.Caused by Closure of Isolation Block Valve on DHR Pump Suction Due to Apparent Electrical Transient.Investigation Continuing | 3 October 1986 | PNO-V-86-069:on 861003,DHR Lost for Approx 13 Minutes.Caused by Closure of Isolation Block Valve on DHR Pump Suction Due to Apparent Electrical Transient.Investigation Continuing | |
PNO-V-86-070, on 861004,discovered Two Snubbers on Charging Sys Mistakenly Removed.Charging Sys Required by Tech Specs for Refueling Boration Flow Path.Snubbers Reinstalled within Hour of Discovery | 6 October 1986 | PNO-V-86-070:on 861004,discovered Two Snubbers on Charging Sys Mistakenly Removed.Charging Sys Required by Tech Specs for Refueling Boration Flow Path.Snubbers Reinstalled within Hour of Discovery | |
PNO-V-86-073, GL Mcchain,In Custody by FBI on Parole Violation,Issued Claims of Evading Security Background Checks for 6 Yrs While Working at Listed Facilities & Knows of Falsified Weld Records.Investigation in Progress | 23 October 1986 | PNO-V-86-073:GL Mcchain,In Custody by FBI on Parole Violation,Issued Claims of Evading Security Background Checks for 6 Yrs While Working at Listed Facilities & Knows of Falsified Weld Records.Investigation in Progress | |
PNO-V-86-074, on 861028,main Steam Valves Found W/Missing & Loosened Nuts That Secure Valve Disc to Hinge Arm. Deficiencies Discovered During Visual Exam as Part of Inservice Testing Exam | 30 October 1986 | PNO-V-86-074:on 861028,main Steam Valves Found W/Missing & Loosened Nuts That Secure Valve Disc to Hinge Arm. Deficiencies Discovered During Visual Exam as Part of Inservice Testing Exam | |
PNO-V-86-075, on 861029,during Followup Insp of Accumulator Drain Fittings,Pin Hole Leaks Discovered in Accumulators 2-2 & 2-4 in Nonwelded Portion of Fitting.Cause Not Stated.Leaks Repaired | 30 October 1986 | PNO-V-86-075:on 861029,during Followup Insp of Accumulator Drain Fittings,Pin Hole Leaks Discovered in Accumulators 2-2 & 2-4 in Nonwelded Portion of Fitting.Cause Not Stated.Leaks Repaired | |
PNO-V-86-081, on 861112,worker Discovered Unattended & Loaded .38-caliber Revolver on Floor in Restroom.Security Officer Inadvertently Left Weapon in Restroom.Info Assessment Team Notified & Will Review Licensee Actions | 17 November 1986 | PNO-V-86-081:on 861112,worker Discovered Unattended & Loaded .38-caliber Revolver on Floor in Restroom.Security Officer Inadvertently Left Weapon in Restroom.Info Assessment Team Notified & Will Review Licensee Actions | |
PNO-V-86-082, on 861117,water Observed Leaking from Spent Fuel Pool Liner Into Annulus,Through Concrete Walls Into Nonradiologically Controlled Part of Plant.Caused by Annulus Drain Valve Closed for Maint.Annulus Area Drained | 18 November 1986 | PNO-V-86-082:on 861117,water Observed Leaking from Spent Fuel Pool Liner Into Annulus,Through Concrete Walls Into Nonradiologically Controlled Part of Plant.Caused by Annulus Drain Valve Closed for Maint.Annulus Area Drained | |
PNO-V-86-087, on 861124,security Guard Found Plastic Bag W/Marijuana within Protected Area Vital Gate on Turbine Deck.Employee of Nuclear Plant Svcs,Admitted Possession. Ind Ividual Removed & Denied Further Site Access | 26 November 1986 | PNO-V-86-087:on 861124,security Guard Found Plastic Bag W/Marijuana within Protected Area Vital Gate on Turbine Deck.Employee of Nuclear Plant Svcs,Admitted Possession. Ind Ividual Removed & Denied Further Site Access | |
PNO-V-86-089, on 861207,plant Seismic Monitor Detected Ground Motion Which Triggered Ripplemental Seismic Monitoring Sys.Ground Motion Measured 2.9 on Richter Scale | 8 December 1986 | PNO-V-86-089:on 861207,plant Seismic Monitor Detected Ground Motion Which Triggered Ripplemental Seismic Monitoring Sys.Ground Motion Measured 2.9 on Richter Scale | Earthquake |