Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
IR 05000280/200300526 January 2004IR 05000280-03-005 & 05000281-03-005 on 9/28/2003 - 12/27/2003 for Surry, Units 1 & 2; Inservice Inspection Activities, Integrated Resident Inspector ReportBoric Acid
High winds
High Radiation Area
Ultimate heat sink
Non-Destructive Examination
Coatings
Nondestructive Examination
Temporary Modification
VT-2
Condition Adverse to Quality
Significance Determination Process
Process Control Program
Moisture barrier
Maintenance Rule Program
Liquid penetrant
Pressure Boundary Leakage
Fire Protection Program
IR 05000280/200300621 February 2003IR 05000280-03-006 and IR 05000281-03-006 on 01/06 - 09/03 for Virginia Electric and Power CompanyB.5.b
IR 05000280/20030082 February 2004IR 05000280-03-008 & 05000281-03-008, on 04/21/03 Through 01/07/04, for Virginia Electric & Power Company, Surry, VA; Significance Determination of Unresolved Items from Triennial Fire Protection InspectionSafe Shutdown
Significance Determination Process
Preliminary White Finding
Fire Protection Program
IR 05000280/20030092 January 2004IR 05000280-03-009, IR 05000281-03-009 on 11/17/2003 - 12/5/2003; Surry, Units 1 & 2, Biennial Baseline Inspection of the Identification and Resolution of Problems. a Violation Was Identified in the Area of Prioritization and Evaluation ofBoric Acid
Probabilistic Risk Assessment
Coatings
Significance Determination Process
Maintenance Rule Program
Fire Protection Program
IR 05000280/200400219 April 2004IR 05000280-04-002, IR 05000281-04-002, on 12/28/2003 - 03/27/2004, Surry Power Station Units 1 & 2, Surry, VA; Routine Integrated ReportSignificance Determination Process
Maintenance Rule Program
Through-Wall Leak
Fire Protection Program
IR 05000280/200400320 July 2004IR 05000280-04-003, 05000281-04-003 & 07200002-04-001, on 03/28/2004 - 06/26/2004, Surry Power Station Units 1 & 2 and Independent Spent Fuel Storage Installation, Routine Integrated ReportSignificance Determination Process
Maintenance Rule Program
Fire Protection Program
IR 05000280/200400424 November 2004Errata Surry Power Station - NRC Integrated Inspection Report Nos. 5000280/2004004 and 5000281/2004004 - and Office of Investigations Case Number 2-2003-075
IR 05000280/200400527 January 2005IR 05000280-04-005, 05000281-04-005, on 09/26/2004 - 12/31/2004; Surry Power Station Units 1 & 2, Routine Integrated ReportBoric Acid
Packing leak
Non-Destructive Examination
Mission time
Temporary Modification
VT-2
Significance Determination Process
Maintenance Rule Program
Pressure Boundary Leakage
Fire Protection Program
Siren
IR 05000280/200400621 May 2004IR 05000280-04-006 & IR 05000281-04-006, on 03/22/04 Through 03/26/04 & 04/05/04 Through 04/08/04, for Surry Power Station Units 1 & 2; Safety System Design & Performance Capability InspectionUltimate heat sink
Internal Flooding
Probabilistic Risk Assessment
Coatings
Significance Determination Process
Job Performance Measure
Earthquake
IR 05000280/2004008
IR 05000280/200400928 April 2004IR 05000280-04-009 on 02/16/2004 - 03/27/2004 for Surry Power Station, Unit 1; Supplemental Inspection IP 95001 for a White Performance Indicator in the Initiating Events CornerstoneSignificance Determination Process
IR 05000280/200401121 January 2005IR 05000280-04-011, 05000281-04-011, on 11/15-19-2004 & 12/06-10/2004, Surry Power Station, Units 1 & 2; Supplemental Inspection for Degraded Mitigating Systems CornerstoneSafe Shutdown
Unanalyzed Condition
Probabilistic Risk Assessment
Temporary Modification
Significance Determination Process
Preliminary White Finding
IR 05000280/200430119 February 2004Feb-March 2004 Exam 50-280, 281/2004-301 Administrative DocumentsSafe Shutdown
Boric Acid
Shutdown Margin
Offsite Dose Calculation Manual
IR 05000280/200500219 April 2005IR 05000280-05-002, 05000281-05-002, and 07200002-05-001, on 01/01/2005 - 03/31/2005, Surry Power Station Units 1 & 2 and Independent Spent Fuel Storage Installation, Event Followup, Routine Integrated Report, and Annual Assessment MeetingHigh winds
Temporary Modification
Significance Determination Process
Job Performance Measure
Earthquake
Maintenance Rule Program
Fire Protection Program
Power change
IR 05000280/200500325 July 2005IR 05000280-05-003, IR 05000281-05-003; 04/01/2005-06/30/2005; Surry Power Station Units 1 & 2. Identification and Resolution of ProblemsUnanalyzed Condition
Boric Acid
High Radiation Area
Nondestructive Examination
Temporary Modification
Locked High Radiation Area
Condition Adverse to Quality
Significance Determination Process
Annual Radioactive Effluent Release Report
Process Control Program
Maintenance Rule Program
Liquid penetrant
Fire Protection Program
IR 05000280/200500421 October 2005IR 05000280-05-004, IR 05000281-05-004, on 09/30/2005, for Surry Power Station, Units 1 and 2, Maintenance EffectivenessBoric Acid
Time of Discovery
High winds
Stroke time
Past operability
Temporary Modification
Significance Determination Process
Maintenance Rule Program
Liquid penetrant
Through Wall Leak
Fire Protection Program
Downpower
IR 05000280/200500530 January 2006IR 05000280-05-005, IR 05000281-05-005, on 10/01-12/31/2005, Virginia Electric and Power CompanyInternal Flooding
Temporary Modification
Significance Determination Process
Maintenance Rule Program
Through Wall Leak
Fire Protection Program
Downpower
IR 05000280/200500620 September 2005IR 05000280-05-006 and IR 05000281-05-006 on 08/08/05 - 08/26/05, Surry Power, Units 1 and 2, Biennial Baseline Inspection of the Identification a Resolution of Problems. Three Violations Were Identified in the Area of Corrective ActionsBoric Acid
Packing leak
Mission time
Temporary Modification
Condition Adverse to Quality
Significance Determination Process
Operability Determination
Maintenance Rule Program
Through Wall Leak
Operability Assessment
IR 05000280/20060012 March 2006Inspection/Activity Plan - Surry Power Station (NRC Inspection Reports 05000280/2006001 & 05000281/2006001
IR 05000280/200600224 April 2006IR 05000280-06-002, 05000281-06-002, on 01/01/2006 - 03/31/2006, Surry, Units 1 & 2Boric Acid
Internal Flooding
Condition Adverse to Quality
Significance Determination Process
Maintenance Rule Program
Through Wall Leak
Fire Protection Program
Downpower
IR 05000280/200600321 July 2006IR 05000280-06-003, IR 05000281-06-003; 04/01/2006 - 06/30/2006; Surry Power Station Units 1 & 2 and Independent Spent Fuel Storage Installation; Event Followup, Routine Integrated ReportBoric Acid
High winds
Nondestructive Examination
Temporary Modification
Condition Adverse to Quality
Significance Determination Process
Maintenance Rule Program
Liquid penetrant
Fire Protection Program
Power change
Downpower
IR 05000280/200600426 October 2006IR 05000280-06-004, IR 05000281-06-004, and IR 07200055-06-001, Virginia Electric and Power CompanyBoric Acid
High Radiation Area
Non-Destructive Examination
Offsite Dose Calculation Manual
Temporary Modification
Maintenance Rule Program
Liquid penetrant
Through Wall Leak
Fire Protection Program
IR 05000280/200600531 January 2007IR 05000280-06-05, IR 05000281-06-05, IR 05000280-06-501, IR 05000281-06-501, IR 07200002-06-003; on 10/01-12/31, 2006; Surry Power Station Units 1 & 2 and Independent Spent Fuel Storage Installation; Event Followup, Routine Integrated RepoBoric Acid
High winds
Ultimate heat sink
Nondestructive Examination
Temporary Modification
Significance Determination Process
Maintenance Rule Program
Biofouling
Fire Protection Program
IR 05000280/20060068 March 2006IR 05000280-06-006, 05000281-06-006, on 01/13, 01/23 - 27, 02/06 -02/10/2006, Surry, Units 1 and 2, Component Design Bases InspectionProbabilistic Risk Assessment
Significance Determination Process
Job Performance Measure
Foreign Material Exclusion
Time Critical Operator Action
IR 05000280/2006007Fitness for Duty
IR 05000280/20060085 May 2006IR 05000280-06-008, IR 05000281-06-008 on 02/06-10/2006 for Surry Power Station, Units 1 and 2; Exercise EvaluationSignificance Determination Process
Design basis earthquake
Earthquake
Preliminary White Finding
IR 05000280/200600911 August 2006IR 05000280-06-009, IR 05000281-06-009, on 06/12-16/2006 & 06/26-30/2006 for Surry, Units 1 and 2; Triennial Fire Protection InspectionSafe Shutdown
Fire Barrier
Coatings
Emergency Lighting
Significance Determination Process
Job Performance Measure
Thermoset
Fire Protection Program
Fire Watch
IR 05000280/200601025 July 2006EA-06-071, Surry, Final Significance Determination for a White Finding & Notice of Violation (Surry Power Station - NRC Inspection Report Nos. 05000280-06-010, 05000281-06-010)Time of Discovery
Significance Determination Process
Earthquake
Preliminary White Finding
IR 05000280/20060111 December 2006IR 05000280-06-011, IR 05000281-06-011 on 10/16/06 - 10/27/06 for Surry Power Station, Unit 1 & 2; Special Insp ReportReserve Station Service Transformer
Significance Determination Process
IR 05000280/2006201
IR 05000280/20063018 February 2006Jan/Feb 2006 Exam 05000280, 281/2006301 Final Scenarios
IR 05000280/20064014 October 2006IR 05000280-06-401, & IR 05000281-06-401, Safeguards Removed) Surry Power StationAffidavit
IR 05000280/200650215 December 2006IR 05000280-06-502; 05000281-06-502; 11/13/2006 - 11/15/2006; Surry Power Station, Units 1 and 2; Supplemental Inspection; IP 95001, Inspection for One or Two White Inputs in a Strategic Performance Area.Earthquake
IR 05000280/20070011 March 2007Annual Assmt. Ltr - Surry, IR 05000280-07-001 and 05000281-07-001
IR 05000280/200700230 April 2007IR 05000280-07-002, IR 05000281-07-002, on 01/01/2007 - 03/31/2007; Surry Power Station Units 1 & 2; Maintenance Risk Assessment and Emergent Work, Identification and Resolution of Problems, and Followup of EventsReserve Station Service Transformer
Temporary Modification
Significance Determination Process
Job Performance Measure
Operability Determination
Maintenance Rule Program
Fire Protection Program
Incremental Core Damage Probability Deficit
IR 05000280/200700330 July 2007IR 05000280-07-003 and 05000281-07-003 on 04/01/2007 - 06/30/2007 for Surry PowerSafe Shutdown
High winds
Commercial Grade Dedication
Probabilistic Risk Assessment
Significance Determination Process
Operability Determination
Maintenance Rule Program
Incremental Core Damage Probability Deficit
Power change
IR 05000280/200700426 October 2007IR 05000280-07-004, 05000281-07-004 & 07200055-07-001; on 07/01/2007 - 09/30/2007, Virginia Electric and Power Company (Vepco); Surry Power Station Units 1 and 2; and Independent Spent Fuel Storage Installation; Routine Integrated InspectioSafe Shutdown
Internal Flooding
Probabilistic Risk Assessment
Temporary Modification
Significance Determination Process
Maintenance Rule Program
Overexposure
IR 05000280/200700531 January 2008IR 05000280-07-005, 05000281-07-005 on 10/01/2007- 12/31/2007 for Surry, Units 1 & 2, and Independent Spent Fuel Storage Installation; Fire Protection, Inservice Inspection Activities, Post-Maintenance Testing, and Other ActivitiesSafe Shutdown
Boric Acid
High Radiation Area
Offsite Dose Calculation Manual
Enforcement Discretion
Probabilistic Risk Assessment
Nondestructive Examination
Temporary Modification
VT-2
Locked High Radiation Area
Significance Determination Process
Thermoset
Foreign Material Exclusion
Process Control Program
Operability Determination
Maintenance Rule Program
Control of Heavy Loads
Liquid penetrant
Fire Protection Program
Scaffolding
GOTHIC
Unidentified leakage
IR 05000280/200700614 September 2007IR 05000280-07-006; 05000281-07-006; and 07200055-07-001, on 06/18/2007 - 08/03/2007, Surry Power Station, Independent Spent Fuel Storage Installation (ISFSI) Dry Run and Initial Loading Inspection Report - Inspector Notes
IR 05000280/200700826 November 2007IR 05000280-07-008, 05000281-07-008; 09/10/2007 - 10/12/2007; Surry Power Station, Units 1 & 2; Biennial Inspection of the Identification and Resolution of ProblemsSignificance Determination Process
Operability Determination
Maintenance Rule Program
Flow Induced Vibration
IR 05000280/2007201
IR 05000280/200740111 May 2007NRC Security IR 05000280-07-401, 05000281-07-401 & 07200002-07-401, on 04/13/07, Surry Power StationAffidavit
IR 05000280/200750120 July 2007IR 05000280-07-501, 05000281-07-501, on 06/25-29/2007; Virginia Electric and Power Company; Surry Power Station, Emergency Preparedness Inspection Report
IR 05000280/20080013 March 2008Annual Assessment Letter (NRC Inspection Report 05000280/2008001 and 05000281/2008001)B.5.b
IR 05000280/200800223 April 2008IR 05000280-08-002, IR 05000281-08-002; 01/01/2008 - 03/31/2008; Surry Power Station Units 1 & 2, Surveillance Testing, Other ActivitiesFire Barrier
Past operability
Temporary Modification
Significance Determination Process
Operability Determination
Maintenance Rule Program
Fire Protection Program
Operability Assessment
IR 05000280/200800330 July 2008IR 05000280-08-003 & 05000281-08-003 on 04/01/2008 - 06/30/08 for Surry Power, Units 1 & 2Boric Acid
Shutdown Margin
Packing leak
Ultimate heat sink
Non-Destructive Examination
Fire Barrier
Weld Overlay
VT-2
Significance Determination Process
Foreign Material Exclusion
Operability Determination
Maintenance Rule Program
Control of Heavy Loads
Biofouling
Liquid penetrant
Fire Protection Program
GOTHIC
Unidentified leakage
IR 05000280/200800412 November 2008IR 05000280-08-004, 05000281-08-004, 07200055-08-001, on 07/01/2008 - 09/30/2008; Surry Power Station Units 1 and 2; and Independent Spent Fuel Storage Installation; Adverse Weather Protection and Problem Identification and ResolutionHigh winds
High Radiation Area
Offsite Dose Calculation Manual
Fire Barrier
Tornado Missile
Temporary Modification
Condition Adverse to Quality
Significance Determination Process
Annual Radiological Environmental Operating Report
Maintenance Rule Program
Fire Protection Program
IR 05000280/200800530 January 2009IR 05000280-08-005, 05000281-08-005, on 10/01/2008 - 12/31/2008, Surry Power Station Units 1 and 2, Event FollowupShutdown Margin
Fire Barrier
Internal Flooding
Temporary Modification
Condition Adverse to Quality
Significance Determination Process
Operability Determination
Maintenance Rule Program
Through Wall Leak
Fire Protection Program
IR 05000280/20080067 April 2008IR 05000280-08-006, 05000281-08-006 on 1/28/08 - 2/29/08 for Surry Power Station, Units 1 and 2, Component Design Basis InspectionMission time
Tornado Missile
Probabilistic Risk Assessment
Significance Determination Process
Job Performance Measure
Time Critical Operator Action
IR 05000280/20080073 September 2008IR 05000280-08-007, IR 05000281-08-007, on 08/08/2008, Surry Power Station - Ti 2515/171, Verification of Site Specific Implementation of b.5.b Phase 2 and 3, Mitigating Strategies InspectionB.5.b