Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
AECM-88-0131, Forwards Summary of Completed & Planned Notification & Consultation Activities.Systemwide Communication Plan Under Development for Consolidation Effort,Including Development of New Publication to Update Employees on Progress29 June 1988Forwards Summary of Completed & Planned Notification & Consultation Activities.Systemwide Communication Plan Under Development for Consolidation Effort,Including Development of New Publication to Update Employees on Progress
CY-86-037, FOIA Request for IE Manual Chapter 2955 as Ref on Page 2 of Attached SECY-86-37,draft NRC Manual Chapter 0516 as Ref in from NRC to NSP & NRC Manual Chapter 0516 as Ref in NRR Ofc Ltr 44,Rev 14 October 1995FOIA Request for IE Manual Chapter 2955 as Ref on Page 2 of Attached SECY-86-37,draft NRC Manual Chapter 0516 as Ref in from NRC to NSP & NRC Manual Chapter 0516 as Ref in NRR Ofc Ltr 44,Rev 1Systematic Assessment of Licensee Performance
ML11165119511 April 1980Forwards Proprietary & Nonproprietary Versions of Structural Analysis of RCS for Postulated LOCA, Preliminary Issue.Applications for Withholding Encl. Proprietary Version Withheld (Ref 10CFR2.790)
ML11276010821 December 1978Forwards LER#78-020/03L-0
ML11276011021 December 1978Forwards LER#78-027/03L-0
ML11276012325 October 1978Forwards LER 78-018/03L-0
ML11276014521 December 1978Forwards LER#78-029/01T-0
ML11297078319 March 1981Forwards Revision 1 to 810206 Request for Amend of License DPR-22 & Supplemental Reload Licensing Submittal.Issuance of Amend Requested Prior to 810415
ML1129708116 February 1981Forwards 810206 License Amend Request for Change in Cycle 9 Tech Specs,App A,Of OL DPR-22.Issuance of Amend Requested Prior to 810415
ML11297083423 October 1981Forwards Annual Financial Rept for 1980 & Schedule Showing Cash Flow Generated in 1980 & Projected Flow for 1981,per Reg Guide 9.4
ML11297084430 April 1982Forwards Updated SAR Updating Info in FSAR from Period When Last Amend Submitted on 700723 to 811031
ML1129708502 July 1982Forwards Revision 1 to 760907 Application for Amend to License DPR-22,changing Tech Spec to Allow Plant to Remain at Substantial Power Level W/One Recirculation Pump in Operation & Equalizer Valve Closed
ML11297120928 August 1987Forwards Supplemental Info for 870727 Application for Amend to License DPR-22,including Proprietary NEDE-24050-2, Suppl 2 to LOCA Analysis Rept for Monticello Nuclear Generating Plant.
ML11299026227 July 1979Forwards Revision 4 of ASME Code Section XI Inservice Insp & Testing Program & Info Required for NRC Review of Requests for Relief from ASME Section XI Requirements.
ML11299039028 February 1980Forwards Annual Rept of Occupational Exposure, Rept of Changes to QA Plan & Annual Rept of Changes,Tests & ExperimentsGrab sample
Scram Discharge Volume
ML11299057221 August 1980Forwards Draft Upgraded Emergency Plan
ML11299068124 March 1981Forwards NEDE-20179-4P,Suppl 4, Monticello Nuclear Generating Plant,Unit 1,SRP-II Bundle Submittal Segmented Test Rod Bundle. Encl Withheld (Ref 10CFR2.790).Rept Available in Central Files Only
ML11299069013 April 1981Forwards Revised ASME Code Section XI Inservice Insp & Testing Program.Also Forwards Request for Relief Re Schedule for Leak Testing Valves
ML11299084918 January 1982Forwards Revision 2 to ASME Code Section XI Inservice Insp & Testing Program. Rept Includes Three Addl Requests for Relief Re Postponement of Hydrostatic Tests & Alternate Leakage Test for Buried Portions of Svc Water PipingHydrostatic
ML11299091412 May 1982Forwards Revision 3, Inservice Insp & Testing Program.
ML1129909456 July 1982Forwards Proprietary Suppl 5 to NEDE-20179-5P Monticello Nuclear Generating Plant,Unit 1 SRP-II Bundle Submittal Segmented Test Rod Bundle. Rept Withheld (Ref 10CFR2.790)
ML11299099029 October 1982Forwards Proprietary, Monticello Nuclear Generating Plant, Unit 1,SRP-II Bundle Submittal,Segmented Test Rod Bundle (Suppl 6), Reflecting Status of Changes Made During Cycle 10 Refueling Outage.Rept Withheld (Ref 10CFR2.790)
ML1129911523 August 1983Forwards Supplemental Proprietary Evaluation of Mark I Safety/Relief Valve Load Cases C3.1,C3.2 & C3.3 for Monticello Nuclear Generating Plant. Rept Withheld (Ref 10CFR2.790).Affidavit Encl
ML11299126531 May 1984Forwards Proprietary NEDC-30492-P, GE BWR Licensing Rept: Aprm,Rod Block Monitor & Tech Spec Improvement Program for Monticello, to Suppl 840530 Application for Amend to License DPR-22.Rept Withheld (Ref 10CFR2.790)
ML11299132926 December 1984Forwards Proprietary NEDC-30806P, SAR for Monticello Nuclear Generating Plant Spds. Rept Withheld (Ref 10CFR2.790)
ML1131108838 March 1993Requests Review & Approval for Evaluation of Crack Indication That Was Discovered in B Core Spray Header During 1993 Refueling Outage Per IE Bulletin 88-013
ML11311097110 March 1980Forwards Monthly Operating Rept for Feb 1980
ML11311097914 May 1980Forwards Monthly Operating Rept for Apr 1980
ML11319067021 August 1980Forwards Public Version of Draft Upgraded Emergency Plan
ML11319075216 December 1981Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures 1.1.2 Re notifications,1.1.4 Re Emergency Organization Records & 1.1.5 Re Startup & Operation of Emergency Offsite Facility
ML11319077814 April 1982Forwards Public Version of Revision 2 to Emergency Response Plan Implementing Procedure A.2-404, Emergency Sampling & Analysis.
ML1131907848 March 1982Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures A.2-101 Re Classification of emergencies,A.2-102 Re Notification of Unusual Event & A.2-103 Re Alert
ML1131907881 April 1982Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EPIP 1.1.5 Re Startup & Operation of Emergency Offsite Facility & EPIP 1.1.15 Re Transition to Recovery Phase
ML11319079111 May 1982Forwards Public Version of Revision 4 to Corporate Emergency Response Plan,Consisting of Changes Requested in NRC 811217 Ltr Re Prairie Island Emergency Preparedness Appraisal
ML11319080127 July 1982Forwards Public Version of Revision 2 to Emergency Response Plan
ML1131908126 August 1982Forwards Public Version of Revision 3 to Emergency Plan Implementing Procedure A.2-101, Classification of Emergencies.
ML1131908268 October 1982Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EPIP 1.1.1 Re Corporate Emergency Response Organization,Epip 1.1.2 Re Notifications & EPIP 1.1.3 Re Public Info
ML11319084920 January 1983Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EPIP 1.1.5 Re Startup Operation of Emergency Offsite Facility & EPIP 1.1.6 Re Emergency Organization Shift Turnover
ML11319085218 January 1983Forwards Public Version of Revised Emergency Response Plan Implementing Procedures,Including Procedures A.2-420 Re Containment Atmosphere Radiochemical Analysis & A.2-404 Re Airborne Iodine Sampling & Analysis.Revised Index Encl
ML11321028630 November 1993Forwards Application for Amend to License DPR-22,changing Sections 3.2/4.2,protective Instrumentation & 3.17/4.17, Control Room Habitability,By Deleting Requirements for Chlorine Detection Sys & Revises LCO
ML17320A9716 March 1984Forwards First Round Questions Following Evaluation of Exxon Rept, Steam Tube Rupture Incident at Prairie Island Unit 1, PTSPWR2 Vs Data,Preliminary Benchmark Analysis.
ML18011B13613 December 1994Responds to NRC RAI Re BWR Core Shroud Generic Safety Assessment Re Conductivity by Fuel Cycle.Ge Rept Providing Info W/Alpha Designations in Place of Plant Names Encl.Ge Ltr,Also Encl,Provides Plant Names.Encl Withheld
ML18043B14520 March 1979Forwards Proprietary Rept NEDE-23749-1-P, Comparison of Analytical Model for Computing Safety Relief Valve Discharge Line Transient Pressures & Forces to Monticello T-Quencher Test Data. Withheld (Ref 10CFR2.790)
ML18059A65030 December 1993Requests to Review Environ Documentation NRC Used to Determine Action,W/Regard to Proposed Dry Cask Storage Proposal for Palisades & Prairie Island Nuclear Power Plants Not Having Significant Impact on Human or Natural Environ
ML18107A70520 July 1999Provides Suppl Info Which Supersedes Info in 990625 Ltr in Response to NRC RAI Re GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants.
ML18139C1351 December 1982Notifies That Neither Facility Has Addl Tech Specs to Be Submitted,In Response to Generic Ltr 82-16 Re Status of NUREG-0737 Items
ML19207A31413 August 1979Forwards Monthly Operating Rept for Jul 1979
ML19207A38029 June 1979Urges NRC to Reject 790618 Request of Mn Pollution Control Agency to Reopen Record of Spent Fuel Pool Mod Proceeding. Matter Can Be Resolved by Generic Rulemaking Rather than Piecemeal Adjudication
ML19207B06117 August 1979Forwards Security Force Training & Qualification Plan.Plan Withheld (Ref 10CFR2.790)
ML19207B36821 August 1979Forwards LER 79-016/03L-0