Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EPIP 1.1.5 Re Startup Operation of Emergency Offsite Facility & EPIP 1.1.6 Re Emergency Organization Shift Turnover
ML113190849
Person / Time
Site: Monticello, Prairie Island, 05000000
Issue date: 01/20/1983
From: Ward E
Northern States Power Co
To:
NRC/OI/RGN-III/FO
Shared Package
ML113190848 List:
References
NUDOCS 8302030018
Download: ML113190849 (1)


Text

Northern States Power Company 414 Nicollet Mall Minneapolis. Minnesota 55401 Telephone (612) 330-5500 January 20, 1983 Regional Administrator Region III U S Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137 CORPORATE NUCLEAR EMERGENCY PLAN IMPLEMENTING PROCEDURES -

REVISION 10 MONTICELLO NUCLEAR GENERATING PLANT Docket No.

50-263 License No.

DPR-22 PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket Nos. 50-282 License Nos.

DPR-42 50-306 60 Furnished with this letter is one copy of revision 10 to the Corporate Nuclear Emergency Plan Implementing Procedures. The revision includes the following procedures:

Table of Contents Rev 10 EPIP 1.1.5 Start-Up and Operation of EOF Rev 7

EPIP 1.1.6 Emergency Organization Shift Turnover Rev 3 EPIP 1.1.7 Start-Up and Operation of HQEC Rev.4 Revisions to the procedures are indicated by a vertical side-bar in the rignt hand margin.

E C Ward, PE Manager-Nuclear Environmental Services ECW/GDH/dab Encis cc Director of NRR (2)

NRC Resident Inspectors (w/o Enclosure)

G Charnoff (w/o Enclosure) 8302030019 830126 PDR ADOCK 05000263 F