ML113110979

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Apr 1980
ML113110979
Person / Time
Site: Monticello 
Issue date: 05/14/1980
From: Mayer L
Northern States Power Co
To:
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
Shared Package
ML113110980 List:
References
NUDOCS 8005200570
Download: ML113110979 (6)


Text

REGULATOR4NFORMATION DISTRIBUTION S*EM (RIDS)

ACCESSION NBR:8005200570 DOC.DATE: 80/05/14 NOTARIZED: NO FACIL:50*263 Monticello Nuclear Generating Plant, Northern States AUTHNAME AUTHOR AFFILIATION MAYERL,O, Northern States Power Co.

RECIPNAME RECIPIENT AFFILIATION Office of Management and Program Analysis fy\\4# j,4 DOCKET #

05000263 SU8JECT: Forwards monthly operating rept for Apr 1980..

DISTRIBUTION CODE: A008S COPIES RECEIVED:LTR -L ENCL S

TITLE: Annual, Semi-Annual & Monthly Operating Reports (OL Stag NOTES: --

RECIPIENT ID CODE/NAME ACTION:

05 6C ORi6 #3 INTERNAL: 01 11 16 19 21 23 EXTERNAL: 03 24 26 DIR DOR REAC SAFT BR EEB EFFL TR SYS LPDR NATL LAB ACRS COPIES LTTR ENCL 6

6 1

2 1

1 1

1 1

1 15 1

2 1

1 1

1 1

15 RECIPIENT ID CODE/NAME.

02 NRC PDR 14 MPA 18 ENGR BR 20 PLANT SYS BR 22 CORE PERF BR AEOD 04 NSIC 25 BROOKHAVEN COPIES LTTR ENCL 1

2 1

1 1

1 2

1 1

1 1

1 1

1 1

1 I

TOTAL NUMBER OF COPIES REQUIRED; LTTR 39 ENCL 39

8005200 57O NORTHERN STATES POWER COMPA 3

MINNEAPOLIS. MINNESOTA O5401 May 14, 1980 Director, Office of Management Information & Program Control c/o Distribution Services Branch, DDC, ADM U S Nuclear Regulatory Commission Washington, DC 20555

Dear Sir:

MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Monthly Operating Report April 1980 Attached are two copies of the Monthly Operating Report for April, 1980 for the Monticello Nuclear Generating Plant.

Yours very truly, L 0 Mayer, PE Manager of Nuclear Support Services LOM/ak cc:

Director, IE-III, USNRC (1)

-Director, IE, USNRC (c/o DSB) (10)

MPCA Attn: J W Ferman

8005200 57 NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKE CO1PLETEI TELEPH T NO.

50- 263 UNIT

'Mbnticello DATE 5-2-80 BY A.L. Myrabo

[ONE 612/295-5151 Continuation of 1980 refueling outage.

Reactor critical for physics testing and reactor heat-up.

Generator on-line prior to turbine overspeed test. Turbine overspeed test completed.

Power operation at essentially 100% of rated power except for weekend surveillance testing and control rod adjustments.

4-19-80 Reactor scram on turbine trip due to reactor high level. Trip was received while attempting orderly shutdown because of failed recirc pump seals.

4-26-80 Scheduled outage to repair recirc pump seals NOTE: Reactor was in a shutdown condition prior to the start of this outage.

4-28-80 Generator on-line for power operation.

4-29-80 to 4-30-80 Orderly shutdown due to failure of recirc pump seal.

April 4-1-80 to 4-3-80 4-4-80 4-5-80 4-6-80 to 4-18-80

MAY 13 1980 0

OPERATING DATA REPORT DOCKET NO.

DATE COMPL..ETED BY TEL.EPHONE 50--263........

5-2-80 A. L. Myrabo 6 12/295-5151 OPERATING STATUS 1

, U.i.

tic.M n Ii I. l I

Reporting per i od :

APRIL 3

I.. icensed ThermaL Power (MWt):

. 1670

4. Nameplate Rating (Gross MWe):

569I

5. Desin E.ectr ica Rating (Net MWe) :.

545.4

6.

Ma x imum Dependab I.e Capac ty (Gross MWe )

_564

7. Ma imum Dependab Le Capac i ty (Net MWe) :

.... 536 1-------------------------

. If Changes Occur in Capac i ty Ratings (Items Number 3 Through

7)

Since I...ast

Report, Give Reasons:

.N/A..............................................

Pi er.

LeveI To Which Restricted, if A

(Net We NA..................

M

. Reazons For Pp ytr ictions, If Any :

....NI/A...

This Month Hours In Report ing Per iod Number Of lHours React:or Was Critica1.

Reactor Reserve Shutdown Hours Hours Generator On-...ine Unit Reserve Shutdown Hours Gross Therma1. Energy Generated (MWH)

Gross ElectricaL Energy Generated (MWH)

Net EI ectric::a1. Energy Generated (MWH)

Unit Service Factor Unit AvaiIlabitity Factor Unit Capacity Factor (Using,MDC Net)

Unit Capacity Factor (Using DER Net)

Unit Forced Outage Rate Shutdowns Scheduled Over Next 12 Months

-- March 28, 1981 -

RefueLing Outage

.--- 7 1 9 415.5

-W360. 6 0.0 536251 182410 173908 50.2%

5 0

.2%

45.1%

44. 3%

35.2%

(Type,

Date, Yr.- to-Date

..,2903 11639. 11 0.0

_ 157i.7 0.0 2090129 703560 668750

54. 1%
54. 1%

43.0%

--. 42.2%

1.

1 1 5%

and Duration 56 days..............

Cumulative 63170.0

- --940.7 61541.0 101032991 30300954 79.5%

79.5%

73.0%

1.7%


6.6%

of Each)

25.

If Shut Down At End Of Report Period, Estimated Date Of Startup:_05-16-80_

26. Units In Test Status(Prior to CommerCaL Operation): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION N o toe--.

I

AVERAGE DAIL.Y UNIT POWER LEVEL.

DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE DAY 9

i1 I 1 2 1 3 14 15 16 50-263 _.

Montic:et.to 5-2-80-..

A. I....

Myra 6i2/295-5151 Til

, APRIL A ERAGE DAILY POWER LEVEL.

(MWe-Net)

~

7..

.I..

.... ~

6..

.....4..........

5 ------- ----.

1.

5138 517<

... ~i

.T.i..

5 0 5 4 7...

547...

INSTRUCTIONS On th is

format, ist the average daily un it power LeveL in MWe-Net for each clay in the report ing month.

Compute to the nearest whole megawatt, DAY AVERAGE DAILY POWER I...EVEI (MWe-Net) 17 550..

1 8 546 19

-3..............

2 24 4

23 4................3 26 4

27 5------

2 8 1 7............ 3 29 21 30 3i1

UNIT SHUTDOWNS AND POWER REDUCI ONS REPORT MONTH April DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE 50-263 Monticello 5-2-80 A. L. Myrabo 612/295-5151 1

f) l~arc Licensec Cause&('rc:

e D.

I~i

.4 Acton tto Re~rt z i

Pre% --rt Rec ~cnTcII 4

4-1-80 S

101.6 C

4 N/A ZZ ZZZZZZ Continuation of 1980 Refueling Outage.

5 4-5-80 S

3.2 B

1 N/A HA TURBIN Turbine overspeed test 6

4-19-80 F

151.2 A

3 N/A CB PUMPXX Turbine trip on high level while re ducing power after recirc pump seal failure. Seals on both recirc pumps replaced.

7 4-26-80 S

57.5 A

4 N/A CB PUMPXX Outage taken to repair recirc pump seal.

NOTE: Reactor was in s shutdown con dition prior tothe start of this outage.

8 4-29-80 F

44.8 A

1 N/A CB PUMPXX Plant shutdown to repair recirc pump seal.

Reason:

A-Equipment Failure (Explain)

B-Maintenance of Test C-Refuelint D-RegulatorN Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

Il-Other (Explain) 3 Method:

!-Manual 2-Manual Scram.

3-Automatic Scram.

4-Other (Explain)

-4 Exhibit G - Instructions for Preparation of Data Entr\\ Sheets for Licensee Eent Report (LER) File (NL REG 0161)

Exhibit I - Sane Source (9/77) 0 S

F: Forced S: Scheduled