ML112970850

From kanterella
Jump to navigation Jump to search
Forwards Revision 1 to 760907 Application for Amend to License DPR-22,changing Tech Spec to Allow Plant to Remain at Substantial Power Level W/One Recirculation Pump in Operation & Equalizer Valve Closed
ML112970850
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 07/02/1982
From: Musolf D
Northern States Power Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML112970851 List:
References
NUDOCS 8207130375
Download: ML112970850 (2)


Text

REGULATORY6NFORMATION DISTRIBUTION S EM RIDS)

AOCESSION N8R:8207130375 DOC.DATE: 82/07/02 NOTARIZED: NO FACIL:50-263 Monticello Nuclear Generating Plant, Northern States AUTH.NAME AUTHOR AFFILIATION MUSCLFD.M.

Northern States IPower Co.

REICIPNAME RECIPIENT AFFILIATION Office of Nuclear Reactor Regulation, Director DOCKET #

05000263

SUBJECT:

Forwards Revision 1 Ito 760907 application for amendito License DPR-22,changingiTech Spec to allow plantto remain at substantial power level w/one recirculation pump in operation & equalizer valve closed (Id DISTRIBUTION CODE: A0018 COPIES 'RECEIVED:LTR ENCL SIZE:--

TITLE: General Distribution for after Issuance of Operating License NOTES:

RECIPIENT ID CODE/NAME ORB #2 8C ELD/HDS1 NRR/DL DIR NRR/DSI/RA B RGN3 EXTERNAL: ACRS NRC POR NTIS COPIES LTTR ENCL 01 7

1 1

0 1

1 1

1 1

1 09 02 1o0 1

10 I

RECIPIENT ID CODE/NAME NRR/DHFS DEiPY08 REG 04 LPOR NSIC 03 05 COPIES LTTR ENCL 1

1 1

1 1

1 0

1 1

1 1

1 TOTAL NUMBER OF COPIES REQUIRED: LTTR INTERNAL:

26 ENCL 26

1 Northern States Power Company u p 414 Nicollet Mail Minneapolis, Minnesota 55401 Telephone (612) 330-5500 July 2, 1982 Director Office of Nuclear Reactor Regulation U S Nuclear Regulatory Commission Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Revision 1 to License Amendment Request Dated September 7, 1976 Single Loop Operation Attached are 3-originals and 37 conformed copies of a request for change of the Technical Specifications, Appendix A of the Full Term Operating License for the Monticello Nuclear Generating Plant. This submittal supersedes our request dated September 7, 1976.

Because this request is a revision of an earlier amendment request, an additional license amendment fee is not required.

The proposed change will allow the plant to remain operational at a substantial power level with one recirculation pump in operation and the equalizer valve closed. Exhibits A and B present the proposed change to the Technical Specifications. Exhibit C is an updated analysis report which presents a safety evaluation in support of the change. Your review of this matter at an early date is requested.

D M Musolf Acting Head-Nuclear Support Services DMM/SAF/bd cc:

Regional Admin-III, NRC Resident Inspector, NRC NRR Project Manager, NRC G Charnoff MPCA Attn:

J W Ferman Attachment B207130375 820702 PDR ADOCK 05000263 P

PDR I