ML113190778
| ML113190778 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 04/14/1982 |
| From: | Mayer L Northern States Power Co |
| To: | NRC/OI/RGN-III/FO |
| Shared Package | |
| ML113190777 | List: |
| References | |
| NUDOCS 8205070059 | |
| Download: ML113190778 (1) | |
Text
/0 Northern States Power Company 414 Nicollet Mall Minneapolis. Minnesota 55401 Telephone (612) 330-5500 April 14, 1982 Regional Administrator Region III U S Nuclear Regulatory 799 Roosevelt Road Glen Ellyn,.IL 60137 MONTICELLO NUCLEAR GENERATING PLANT Docket No.
50-263 License No.
DPR-22 EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURES cU0ce (
A& 9)
)
Furnished with this letter are three copies of revisions to the Monticello Plant Emergency Plan Implementing Procedures.
These revisions include the following procedures:
List of Current Procedures (Dated 3/23/82)
A.2-404 Emergency Sampling and Analysis (Pages 1 through 23) REV 2 L 0 Mayer, PE Manager of Nuclear Support Services LOM/GDH/bp Encls cc Director of NRR (10)
NRC Resident Inspector (w/o attachment)
G Charnoff (w/o attachment)
APR 1 logt 8205070059 820428 PDR ADOCK 05000263 F
PDR D
- W, 0
F"